CN202280054U - 多扩头输电线路铁塔基础 - Google Patents
多扩头输电线路铁塔基础 Download PDFInfo
- Publication number
- CN202280054U CN202280054U CN2011204070537U CN201120407053U CN202280054U CN 202280054 U CN202280054 U CN 202280054U CN 2011204070537 U CN2011204070537 U CN 2011204070537U CN 201120407053 U CN201120407053 U CN 201120407053U CN 202280054 U CN202280054 U CN 202280054U
- Authority
- CN
- China
- Prior art keywords
- pile body
- power transmission
- transmission line
- iron tower
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
本实用新型公开了一种多扩头输电线路铁塔基础,包括由混凝土灌注而成的桩身,所述桩身底部以及由底部向上间隔设置有若干与桩身连接为一体的由混凝土灌注而成的扩头。本实用新型适用于输电线路铁塔的基础,便于加工,并具有优良的抗拔、抗压承载能力。
Description
技术领域
本实用新型涉及一种建筑物基础,尤其是用于输电线路铁塔的带有多个扩头的挖孔桩基础。
背景技术
原状土基础是指不破坏土壤结构的建筑物基础。目前,输电线路铁塔基础的建设中,为了减少工程建设对水土、植被等环境因素的影响,在地下水位较深的硬塑、可塑性粘土及强风化岩石地带,通常采用原状土基础。
灌注桩是一种原状土基础。灌注桩施工时,先在地上钻一个或挖一个长的圆柱形桩孔,成孔后在孔内加放预先制作的钢筋笼,然后灌入混凝土,形成桩身。钢筋笼是钢筋焊接成的中空的筒形结构,钢筋笼与桩孔之间留有灌注混凝土的间隙。为了加强桩身的抗拔和抗压承载力以及提高桩身抗倾覆能力,通常在桩孔加工完毕后,在桩孔的不同深度进行横向的扩孔,形成若干直径大于桩孔直径的扩头,然后再放入钢筋笼进行浇筑,扩头处灌入素混凝土。由于扩头对土壤的压力大于桩身与土壤摩擦力,桩承载力得到大幅提高。
现有的扩孔方式通常为挤扩式。挤扩式是指向桩孔内放入专用的挤扩装置,通过挤扩装置对桩孔侧壁的挤压形成扩头。挤扩装置包括设置在桩孔内的能够扩张和收缩的弓压臂、设置在地面上的驱动弓压臂对桩孔侧壁进行挤压的液压站。
现有的挤扩式灌注桩具有以下缺点:挤扩式灌注桩的桩身直径与扩头直径受挤扩装置尺寸限制,当桩身直径大于1.1m时,没有相应的挤扩装置,从而导致灌注桩的整体强度无法达到施工需求;挤扩装置的使用受地形、地质、运输条件限制,输电线路铁塔基础常常无法采用挤扩式灌注桩。
实用新型内容
本实用新型需要解决的技术问题是提供一种抗压、抗拔承载力高、便于加工的多扩头输电线路铁塔基础。
为解决上述技术问题,本实用新型所采取的技术方案是:
多扩头输电线路铁塔基础,包括由混凝土灌注而成的桩身,所述桩身底部以及由底部向上间隔设置有若干与桩身连接为一体的由混凝土灌注而成的扩头。
本实用新型的改进在于:所述扩头等间隔设置。
本实用新型的进一步改进在于:所述扩头的形状呈锥形,扩头上端直径与桩身直径一致,扩头下端直径比桩身直径大。
本实用新型的进一步改进在于:所述桩身内埋设有筒形的钢筋笼,钢筋笼的轴线与桩身的轴线一致。
由于采用了上述技术方案,本实用新型所取得的技术进步在于:
本实用新型通过在基础桩身上设置多个扩头,有效地提高了基础抗拔、抗压承载力,提高了单位立方米混凝土利用率,具有良好的经济效益和社会效益。由于扩头增加了桩身与周围原状土的咬合,在基础承受上拔或下压等竖向荷载作用时,扩头周围土体能提供更多的剪切面以承担较大比例的竖向荷载,桩身的侧摩阻力也得到了更充分地发挥,从而增大了基础抗拔、抗压承载力。在基础承受水平荷载作用时,基础中部扩头能利用周围原状土承担一部分倾覆力矩,提高了基础的侧向稳定性。本实用新型充分发挥了桩身周边原状土的承载性能,减小了桩身和扩头的直径和深度,可降低材料耗量和开挖量,施工难度小,有利于环境保护,适用于基础作用力较大的原状土铁塔基础设计。
附图说明
图1是本实用新型的加工过程示意图;
其中:1、桩孔,2、扩径孔,3、钢筋笼,4、混凝土,5、扩头,6、桩身。
具体实施方式
下面结合附图对本实用新型做进一步详细说明:
实施例1
如图1所示,以双扩头输电线路铁塔基础为例,施工时,按照图中箭头方向,首先在设计深度范围内掏挖一个竖直的桩孔1,桩孔的直径为1.1m。在桩孔底部和中部分别掏挖扩径孔2。扩径孔的形状为锥形,扩径孔上端的直径与桩孔内径一致,扩径孔下端的直径为桩孔内径的两倍。在桩孔1内下放钢筋焊接成的网状钢筋笼3,钢筋笼的形状为中空的筒形。钢筋笼的轴线与桩孔一致,钢筋笼的直径小于桩孔直径。然后向桩孔以及扩径孔中浇筑混凝土4,桩孔内充填的混凝土以及钢筋笼构成与桩孔内壁配合的桩身6,扩径孔内充填的混凝土构成与扩径孔内壁配合扩头5。浇筑完成后,埋设在地面以下的混凝土扩头和带钢筋笼的混凝土桩身共同构成输电线路铁塔基础。
上述实施例中的扩头的数量可以多于两个,并且可以设置成相互之间等间隔的形式。上述实施例中的桩身直径还可以设置成其它所需要的尺寸,扩径孔下端的直径也可以设置为其他需要的尺寸。
Claims (4)
1.多扩头输电线路铁塔基础,包括由混凝土(4)灌注而成的桩身(6),其特征在于:所述桩身(6)底部以及由底部向上间隔设置有若干与桩身连接为一体的由混凝土灌注而成的扩头(5)。
2.根据权利要求1所述的多扩头输电线路铁塔基础,其特征在于:所述扩头(5)等间隔设置。
3.根据权利要求2所述的多扩头输电线路铁塔基础,其特征在于:所述扩头(5)的形状呈锥形,扩头(5)上端直径与桩身(6)直径一致,扩头(5)下端直径大于桩身(6)直径。
4.根据权利要求1~3任一项所述的多扩头输电线路铁塔基础,其特征在于:所述桩身内埋设有筒形的钢筋笼(3),钢筋笼的轴线与桩身的轴线一致。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204070537U CN202280054U (zh) | 2011-10-24 | 2011-10-24 | 多扩头输电线路铁塔基础 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204070537U CN202280054U (zh) | 2011-10-24 | 2011-10-24 | 多扩头输电线路铁塔基础 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202280054U true CN202280054U (zh) | 2012-06-20 |
Family
ID=46226228
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011204070537U Expired - Lifetime CN202280054U (zh) | 2011-10-24 | 2011-10-24 | 多扩头输电线路铁塔基础 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202280054U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109056779A (zh) * | 2018-07-10 | 2018-12-21 | 国核电力规划设计研究院有限公司 | 一种根键变截面板式基础 |
CN109898543A (zh) * | 2019-03-25 | 2019-06-18 | 东北大学 | 一种抗拔抗压输电塔基础及其施工方法 |
CN111779018A (zh) * | 2020-06-24 | 2020-10-16 | 中国电建集团福建省电力勘测设计院有限公司 | 输电线路嵌固锚杆复合基础机械化施工方法 |
-
2011
- 2011-10-24 CN CN2011204070537U patent/CN202280054U/zh not_active Expired - Lifetime
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109056779A (zh) * | 2018-07-10 | 2018-12-21 | 国核电力规划设计研究院有限公司 | 一种根键变截面板式基础 |
CN109898543A (zh) * | 2019-03-25 | 2019-06-18 | 东北大学 | 一种抗拔抗压输电塔基础及其施工方法 |
CN111779018A (zh) * | 2020-06-24 | 2020-10-16 | 中国电建集团福建省电力勘测设计院有限公司 | 输电线路嵌固锚杆复合基础机械化施工方法 |
CN111779018B (zh) * | 2020-06-24 | 2021-07-02 | 中国电建集团福建省电力勘测设计院有限公司 | 输电线路嵌固锚杆复合基础机械化施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104131556B (zh) | 一种软硬夹层交互地基排水预应力管桩的施工方法 | |
CN103711122B (zh) | 一种布袋扩挤混凝土支盘桩的施工方法 | |
CN201202116Y (zh) | 土工布袋散体材料后注浆桩 | |
CN103835284A (zh) | 一种岩溶地区钻孔灌注桩结构及施工方法 | |
CN203741820U (zh) | 一种岩溶地区钻孔灌注桩结构 | |
CN202280054U (zh) | 多扩头输电线路铁塔基础 | |
CN202124862U (zh) | 螺旋锚板式复合基础 | |
CN204000859U (zh) | 一种软硬夹层交互地基排水预应力管桩 | |
CN203866852U (zh) | 一种深层旋喷水泥土板与锚杆组合抗浮桩筏结构 | |
CN207121896U (zh) | 预制空心抗拔桩 | |
CN112359815A (zh) | 用于软基处理的干式振冲碎石桩及其施工方法 | |
CN203947468U (zh) | 一种地面附近处扩大断面的挤扩支盘桩 | |
CN201502065U (zh) | 一种锚杆联合开挖类复合基础 | |
CN202969405U (zh) | 一种杯型混凝土风力发电塔基础 | |
CN203594027U (zh) | 一种布袋扩挤混凝土支盘桩 | |
CN204000846U (zh) | 花管注浆抗拔桩 | |
CN103556629A (zh) | 一种异形桩的施工方法 | |
CN202969406U (zh) | 一种倒锥台与独立柱结合的风力发电塔基础 | |
CN209603123U (zh) | 一种消减负摩阻力的扩底灌注桩结构 | |
CN203129163U (zh) | 一种坝基加固框架结构 | |
CN201321612Y (zh) | 建筑用预应力管桩 | |
CN113174925A (zh) | 一种利用膨胀剂的新型珊瑚砂地基桩及施工方法 | |
CN102051877B (zh) | 一种预制挤扩桩及其施工方法 | |
CN205046554U (zh) | 内置锚索灌芯复合式预应力管桩抗浮结构 | |
CN214271993U (zh) | 用于软基处理的干式振冲碎石桩 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 050031 No. 6 Jianhua Street, Shijiazhuang City, Hebei Province Patentee after: China Electric Power Construction Group Hebei electric survey and Design Research Institute Co., Ltd. Address before: 050031 No. 6 Jianhua Street, Shijiazhuang City, Hebei Province Patentee before: Hebei Province Power Surveying Design & Research Institute |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20120620 |