CN103556629A - 一种异形桩的施工方法 - Google Patents
一种异形桩的施工方法 Download PDFInfo
- Publication number
- CN103556629A CN103556629A CN201310541732.7A CN201310541732A CN103556629A CN 103556629 A CN103556629 A CN 103556629A CN 201310541732 A CN201310541732 A CN 201310541732A CN 103556629 A CN103556629 A CN 103556629A
- Authority
- CN
- China
- Prior art keywords
- outer tube
- concrete
- pipe
- tube
- wing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 12
- 239000004567 concrete Substances 0.000 claims abstract description 38
- 239000004576 sand Substances 0.000 claims abstract description 18
- 238000007569 slipcasting Methods 0.000 claims description 13
- 210000003128 head Anatomy 0.000 claims description 10
- 239000002689 soil Substances 0.000 claims description 8
- 238000003466 welding Methods 0.000 claims description 6
- 239000004927 clay Substances 0.000 claims description 5
- 239000004568 cement Substances 0.000 claims description 3
- 238000002347 injection Methods 0.000 claims description 3
- 239000007924 injection Substances 0.000 claims description 3
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 238000003780 insertion Methods 0.000 claims description 2
- 230000037431 insertion Effects 0.000 claims description 2
- 238000004080 punching Methods 0.000 abstract 1
- 230000002787 reinforcement Effects 0.000 abstract 1
- 230000000694 effects Effects 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000007598 dipping method Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000010412 perfusion Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
本发明公开了一种异形桩的施工方法,其特征是施工步骤包括:(1)在地表桩位处放置干硬混凝土;(2)将平底的内管放入外管内并对准桩位;(3)锤击内管和外管至设计深度;(4)拔出内管;(5)在外管内灌入高度为80~100cm的混凝土;(6)将外管上拔一定高度60~70cm;(7)用平底内管锤击外管内混凝土;(8)继续锤击,将双管同步打下50~60cm深度;(9)拔出内管;(10)在外管内放入钢筋笼;(11)在外管内灌注桩身所需的混凝土,混凝土坍落度为7~9cm;(12)将柴油锤与内管压在外管内的混凝土面上,边压边拔外管;(13)内管和外管拔出地面;(14)在填砂部位插入注浆管进行注浆。
Description
技术领域
本发明涉及一种桩的施工方法,特别涉及一种异形桩的施工方法。
背景技术
桩竖向承载力一般包括桩端承载力和桩侧摩阻力,如果能在同样混凝土浇筑量取得较高的承载力显然会有较高的经济效益。为了充分利用地基土的空间承载作用,节约地基处理投资,可以从改善桩端承载力和桩侧力两方面入手对工艺进行改进,改进思路主要是扩大桩端承载面积和改良桩侧摩擦性能。
发明内容
本发明所要解决的技术问题是提供一种异形桩的施工方法,解决传统桩承载力不高问题。
本发明施工步骤包括:
(1)在地表桩位处放置干硬混凝土,干硬混凝土高为10cm,坍落度1~3cm,干硬混凝土主要是起止淤作用,防止地下水浸入管内,起到混凝土塞头的效果;
(2)将平底的内管放入外管内并对准桩位;
(3)锤击内管和外管至设计深度;
(4)拔出内管;
(5)在外管内灌入高度为80~100cm的混凝土,混凝土坍落度5~6cm;
(6)将外管上拔一定高度60~70cm;
(7)用平底内管锤击外管内混凝土,在这个阶段在桩端形成扩大头,桩端扩大头明显提高了桩端的承载力;
(8)继续锤击,将双管同步打下50~60cm深度;
(9)拔出内管;
(10)在外管内放入钢筋笼;
(11)在外管内灌注桩身所需的混凝土,混凝土坍落度为7~9cm;
(12)将柴油锤与内管压在外管内的混凝土面上,边压边拔外管,这个措施有效地保证桩身混凝土密实性,避免了桩身缩颈、断桩、夹泥等弊病。拔管速度根据软土情况进行确定,对于砂土,拔管速度为大于或等于1m/min且小于1.2m/min,对于粉土,拔管速度为大于或等于1.2m/min且小于1.4m/min,对于粉土,拔管速度为大于或等于1.4m/min且小于1.6m/min,对于粉质粘土,拔管速度为大于或等于1.6m/min且小于1.8m/min,对于粘土,拔管速度为大于或等于1.8m/min且小于2m/min,对于淤泥质土,拔管速度为大于或等于2m/min且小于2.2m/min;拔外管时同步将砂灌入注砂管;
(13)内管和外管拔出地面;
(14)在填砂部位插入注浆管进行注浆,注浆管采用一寸镀锌管,注浆端开4排孔眼,孔眼直径为6mm,注浆压力为0.8~1MPa,注浆时间为5min。
桩施工机具采用专用机具,外管直径比内管直径大25~35mm,外管焊接桩翼,桩翼设置位置在外管底部以上30cm位置,桩翼长度为15~20cm,桩翼包括翼身和翼头,翼身厚度为80mm,翼头呈三角形,翼头斜边和水平线的角度为45°~55°,桩翼中心位置焊接注砂管,注砂管直径为80~90mm,随着外管上拔,桩翼下面会出现孔隙,砂沿着注砂管同步灌入填满孔隙。由于填砂部位相对松软,灌砂完毕后在填砂部位插入注浆管进行注水泥浆,注浆压力为0.8~1MPa,注浆时间为5min。注浆完毕后在混凝土桩体外围形成硬砂浆层,而传统桩体周围是软土,而混凝土桩体和硬砂浆层之间的摩阻力显然远远大于混凝土桩体和软土层之间的摩阻力,从而显著提高了混凝土桩体的承载力。
本发明一方面通过内管锤击使桩端形成扩大头,提高了桩端承载力,另一方面通过桩侧形成硬砂浆层来提高桩摩阻力,不但提高了竖向抗压承载力,而且还提高了抗拔承载力,同时增强了桩的抗震性能以及桩身稳定性,经济效益十分显著。
附图说明
图1为带三个桩翼的桩施工机具平面图,图2为带四个桩翼的桩施工机具平面图,图3为桩翼立面图。
附图标志:1、内管,2、外管,3、桩翼,4、注砂管,5、翼头5,6、翼身。
具体实施方式
以下结合附图对本实施例进行详细描述。
施工步骤包括:
(1)在地表桩位处放置干硬混凝土,干硬混凝土高为10cm,坍落度1~3cm;
(2)将平底的内管1放入外管2内并对准桩位;
(3)锤击内管1和外管2至设计深度;
(4)拔出内管1;
(5)在外管2内灌入高度为80~100cm的混凝土,混凝土坍落度5~6cm;
(6)将外管2上拔一定高度60~70cm;
(7)用平底内管1锤击外管2内混凝土;
(8)继续锤击,将双管同步打下50~60cm深度;
(9)拔出内管1;
(10)在外管2内放入钢筋笼;
(11)在外管2内灌注桩身所需的混凝土,混凝土坍落度为7~9cm;
(12)将柴油锤与内管1压在外管2内的混凝土面上,边压边拔外管2,由于实施例的场地土为粘土,拔管速度为大于或等于1.8m/min且小于2n/min;
(13)内管1和外管2拔出地面;
(14)在填砂部位插入注浆管进行注浆,注浆管采用一寸镀锌管,注浆端开4排孔眼,孔眼直径为6mm,注浆压力为0.8~1MPa,注浆时间为5min。
桩施工机具采用专用机具,外管2直径比内管1直径大25~35mm,外管2焊接桩翼3,桩翼3设置位置在外管2底部以上30cm位置,桩翼3长度为15~20cm,桩翼3包括翼身6和翼头5,翼身6厚度为80mm,翼头5呈三角形,翼头5斜边和水平线的角度为45°~55°,桩翼3中心位置焊接注砂管4,注砂管4直径为80~90mm,随着外管2上拔,桩翼3下面会出现孔隙,砂沿着注砂管4同步灌入填满孔隙。灌砂完毕后在填砂部位插入注浆管进行注水泥浆,注浆压力为0.8~1MPa,注浆时间为5min。
Claims (2)
1.一种异形桩的施工方法,其特征是施工步骤包括:
(1)在地表桩位处放置干硬混凝土,干硬混凝土高为10cm,坍落度1~3cm;
(2)将平底的内管放入外管内并对准桩位;
(3)锤击内管和外管至设计深度;
(4)拔出内管;
(5)在外管内灌入高度为80~100cm的混凝土,混凝土坍落度5~6cm;
(6)将外管上拔一定高度60~70cm;
(7)用平底内管锤击外管内混凝土;
(8)继续锤击,将双管同步打下50~60cm深度;
(9)拔出内管;
(10)在外管内放入钢筋笼;
(11)在外管内灌注桩身所需的混凝土,混凝土坍落度为7~9cm;
(12)将柴油锤与内夯管压在外管内的混凝土面上,边压边拔外管,拔管速度根据软土情况进行确定,对于砂土,拔管速度为大于或等于1m/min且小于1.2m/min,对于粉土,拔管速度为大于或等于1.2m/min且小于1.4m/min,对于粉土,拔管速度为大于或等于1.4m/min且小于1.6m/min,对于粉质粘土,拔管速度为大于或等于1.6m/min且小于1.8m/min,对于粘土,拔管速度为大于或等于1.8m/min且小于2m/min,对于淤泥质土,拔管速度为大于或等于2m/min且小于2.2m/min;拔外管时同步将砂灌入注砂管;
(13)内管和外管拔出地面;
(14)在填砂部位插入注浆管进行注浆,注浆管采用一寸镀锌管,注浆端开4排孔眼,孔眼直径为6mm,注浆压力为0.8~1MPa,注浆时间为5min。
2.根据权利要求所述的异形桩的施工方法,其特征是桩施工机具采用专用机具,外管直径比内管直径大25~35mm,外管焊接桩翼,桩翼设置位置在外管底部以上30cm位置,桩翼长度为15~20cm,桩翼包括翼身和翼头,翼身厚度为80mm,翼头呈三角形,翼头斜边和水平线的角度为45°~55°,桩翼中心位置焊接注砂管,注砂管直径为80~90mm,随着外管上拔,桩翼下面会出现孔隙,砂沿着注砂管同步灌入填满孔隙;灌砂完毕后在填砂部位插入注浆管进行注水泥浆,注浆压力为0.8~1MPa,注浆时间为5min。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310541732.7A CN103556629B (zh) | 2013-10-23 | 2013-10-23 | 一种异形桩的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310541732.7A CN103556629B (zh) | 2013-10-23 | 2013-10-23 | 一种异形桩的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103556629A true CN103556629A (zh) | 2014-02-05 |
CN103556629B CN103556629B (zh) | 2015-11-25 |
Family
ID=50010966
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310541732.7A Expired - Fee Related CN103556629B (zh) | 2013-10-23 | 2013-10-23 | 一种异形桩的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103556629B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104314072A (zh) * | 2014-10-28 | 2015-01-28 | 中国化学工程第一岩土工程有限公司 | 一种异型现浇混凝土桩的施工方法 |
CN105908707A (zh) * | 2016-05-27 | 2016-08-31 | 宜兴市太湖地基工程有限公司 | 一种三角形桩基 |
CN105926594A (zh) * | 2016-04-29 | 2016-09-07 | 朱龙 | 一种静压沉管载体灌注桩的双管施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1316570A (zh) * | 2000-04-05 | 2001-10-10 | 陈为群 | 预制灌注组合桩成型工艺 |
JP2001303561A (ja) * | 2000-04-24 | 2001-10-31 | Asahi Kasei Corp | ソイルセメント合成外殻鋼管コンクリート杭の造成方法 |
CN201358456Y (zh) * | 2009-02-25 | 2009-12-09 | 河海大学 | 塑料套管混凝土桩 |
CN101781891A (zh) * | 2009-01-15 | 2010-07-21 | 叶长青 | 砂衬桩及其施工方法 |
CN102433878A (zh) * | 2011-09-29 | 2012-05-02 | 广州市建筑科学研究院有限公司 | 一种管桩基础的后注浆装置及其施工方法 |
CN103184734A (zh) * | 2013-03-19 | 2013-07-03 | 浙江天润建设有限公司 | 一种植入注浆组合桩及施工方法 |
-
2013
- 2013-10-23 CN CN201310541732.7A patent/CN103556629B/zh not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1316570A (zh) * | 2000-04-05 | 2001-10-10 | 陈为群 | 预制灌注组合桩成型工艺 |
JP2001303561A (ja) * | 2000-04-24 | 2001-10-31 | Asahi Kasei Corp | ソイルセメント合成外殻鋼管コンクリート杭の造成方法 |
CN101781891A (zh) * | 2009-01-15 | 2010-07-21 | 叶长青 | 砂衬桩及其施工方法 |
CN201358456Y (zh) * | 2009-02-25 | 2009-12-09 | 河海大学 | 塑料套管混凝土桩 |
CN102433878A (zh) * | 2011-09-29 | 2012-05-02 | 广州市建筑科学研究院有限公司 | 一种管桩基础的后注浆装置及其施工方法 |
CN103184734A (zh) * | 2013-03-19 | 2013-07-03 | 浙江天润建设有限公司 | 一种植入注浆组合桩及施工方法 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104314072A (zh) * | 2014-10-28 | 2015-01-28 | 中国化学工程第一岩土工程有限公司 | 一种异型现浇混凝土桩的施工方法 |
CN104314072B (zh) * | 2014-10-28 | 2016-08-24 | 中国化学工程第一岩土工程有限公司 | 一种异型现浇混凝土桩的施工方法 |
CN105926594A (zh) * | 2016-04-29 | 2016-09-07 | 朱龙 | 一种静压沉管载体灌注桩的双管施工方法 |
CN105908707A (zh) * | 2016-05-27 | 2016-08-31 | 宜兴市太湖地基工程有限公司 | 一种三角形桩基 |
Also Published As
Publication number | Publication date |
---|---|
CN103556629B (zh) | 2015-11-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100519953C (zh) | 同步注浆静压预制桩沉桩方法 | |
CN204112308U (zh) | 一种基于大卵石、高渗透系数地层的简易袖阀注浆装置 | |
CN102587361B (zh) | 一种高聚物材料注浆楔形预制桩的施工方法 | |
CN103184734B (zh) | 一种植入注浆组合桩的施工方法 | |
CN103835284A (zh) | 一种岩溶地区钻孔灌注桩结构及施工方法 | |
CN104131556A (zh) | 一种软硬夹层交互地基排水预应力管桩及施工方法 | |
CN103741683A (zh) | 一种囊袋扩底刚柔组合桩及施工方法 | |
CN103835287B (zh) | 一种挤密变径桩的施工方法 | |
CN103556629B (zh) | 一种异形桩的施工方法 | |
CN204000859U (zh) | 一种软硬夹层交互地基排水预应力管桩 | |
CN104196013B (zh) | 一种复合y形桩及其施工方法 | |
CN108842761A (zh) | 钻孔导引预制桩后压浆技术 | |
CN208472716U (zh) | 裂隙地质防漏浆钻孔灌注桩结构 | |
CN203834469U (zh) | 一种囊袋扩底刚柔组合桩 | |
CN203583501U (zh) | 一种抵抗岩体滑动的深层抗剪装置 | |
CN203684215U (zh) | 一种碳纤维布袋现浇反拱曲面组合异形桩 | |
CN202280054U (zh) | 多扩头输电线路铁塔基础 | |
CN205259188U (zh) | 一种可控注浆范围的囊袋式微型承压桩 | |
CN201132955Y (zh) | 同步注浆静压预制桩装置 | |
CN209603123U (zh) | 一种消减负摩阻力的扩底灌注桩结构 | |
CN104294817B (zh) | 混凝土桩的施工方法 | |
CN103790162B (zh) | 同步式钢板桩桩孔填充装置 | |
CN102383422A (zh) | 挤密胀扩微型砂浆桩成桩方法及成桩装置 | |
CN208251078U (zh) | 一种扩底沉管桩结构 | |
CN202202325U (zh) | 挤密胀扩微型砂浆桩成桩装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170413 Address after: 330001 Nanchang, south of the District of Jiangxi city Chang Chang Industrial Park Patentee after: Jiangxi Construction Engineering Co., Ltd. Address before: 325000 Jinchuan economic and Technological Development Zone, Tianhe Road, Wenzhou, No. 4 Zhejiang Road Patentee before: Ye Changqing |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151125 Termination date: 20181023 |