CN202246726U - Hot-blast air energy-saving air supply device for blast furnaces - Google Patents

Hot-blast air energy-saving air supply device for blast furnaces Download PDF

Info

Publication number
CN202246726U
CN202246726U CN2011203826937U CN201120382693U CN202246726U CN 202246726 U CN202246726 U CN 202246726U CN 2011203826937 U CN2011203826937 U CN 2011203826937U CN 201120382693 U CN201120382693 U CN 201120382693U CN 202246726 U CN202246726 U CN 202246726U
Authority
CN
China
Prior art keywords
blast
air
hot
blower
supply device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011203826937U
Other languages
Chinese (zh)
Inventor
段群智
周庆华
常骏
冯小勇
杨志芳
杨捷
周宝坤
樊兴惠
何锋
瞿开新
李燕
苏兆平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YUNNAN PAN-ASIA ENERGY TECHNOLOGY Co Ltd
Original Assignee
YUNNAN PAN-ASIA ENERGY TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUNNAN PAN-ASIA ENERGY TECHNOLOGY Co Ltd filed Critical YUNNAN PAN-ASIA ENERGY TECHNOLOGY Co Ltd
Priority to CN2011203826937U priority Critical patent/CN202246726U/en
Application granted granted Critical
Publication of CN202246726U publication Critical patent/CN202246726U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model provides a hot-blast air energy-saving air supply device for blast furnaces. The hot-blast air energy-saving air supply device comprises an air blower and hot-blast air pipes which are communicated with the air blower and blast orifices of the blast furnaces, and is characterized in that: a first hot-blast air horizontal pipe and a second hot-blast air horizontal pipe are arranged between the two hot-blast air pipes, wherein a control valve is arranged on the first hot-blast air horizontal pipe; control valves are arranged at two ends of the second hot-blast air horizontal pipe; and a tee joint is arranged between the two control valves, and the third end of the tee joint is connected with a standby air blower. According to the hot-blast air energy-saving air supply device, when the trip-out failure of a certain blast-furnace blower occurs, and the standby air blower is not started completely, the air blower which runs in the other blast-furnace air supply unit is utilized fully, and air is supplied to the two blast furnaces simultaneously; and after the standby air blower is started completely, the air is supplied by the standby air blower, and a quickly-loaded valve on the first hot-blast air horizontal pipe is turned off simultaneously, so that the smelting of the two blast furnaces are not influenced by the failure or draught distribution of the air blower, and thus accidents such as slag bonding of the blast furnaces due to temperature drop are avoided, and the investment is reduced substantially.

Description

The energy-conservation air supply device of blast-furnace hot-air
Technical field
The utility model relates to a kind of air supply device, and the energy-conservation air supply device of especially a kind of blast-furnace hot-air belongs to the blast furnace ironmaking technical field of auxiliary facilities.
Background technology
Need blast high-temperature hot-air in the blast furnace ironmaking process,, make the iron oxide reduction in the iron ore become metallic iron to promote the coke burning in the furnace charge.Along with progress of science and technology; Make joint efforts down in vast scientific research and engineering technical personnel; Constantly break through the key technology of many blast furnace air feeds, the high-temperature technology of hot blast for example, air feed technology; Air current flow and distribution technique or the like maximize blast furnace, high wind-warm syndrome technology is succeeded application.But the present air feed that iron-smelting blast furnace adopted is the unit air feed system, promptly directly blast furnace is carried out air feed by the separate unit gas blower, and in order to guarantee carrying out smoothly of blast-furnace smelting, needs every blast furnace to be equipped with two gas blowers, an operation, and another is subsequent use.During former thereby tripping operation, start stand-by fan immediately when the gas blower failover etc. of operation to the blast furnace air feed.But because the blast furnace blowing engine load is bigger, start time is longer, therefore, can not in time to blast furnace hot blast be provided, thereby causes blast furnace cooling slagging scorification easily, and influences the blast furnace safe operation.In addition, every blast furnace is equipped with two gas blowers, will increase investment.Therefore, be necessary prior art is improved.
Summary of the invention
For continuously hot blast being provided to blast furnace, practice thrift investment simultaneously, the usefulness of performance gas blower, the utility model provides a kind of blast-furnace hot-air energy-conservation air supply device.
The utility model provides the energy-conservation air supply device of a kind of like this blast-furnace hot-air, comprises gas blower, and the heating duct that is communicated with gas blower and blast furnace blast mouth; It is characterized in that being provided with between the heating duct in twos first, second hot blast transverse tube, wherein, the first hot blast transverse tube is provided with valve; The two ends of the second hot blast transverse tube are respectively equipped with valve, are provided with threeway between two valves, and the 3rd end of this threeway links to each other with emergency blower; So that wherein a gas blower breaks down and emergency blower does not start when complete as yet; Open the fast valve that carries on the first hot blast transverse tube, to two blast furnaces hot blast be provided simultaneously by another gas blower, treat that emergency blower starts fully after; Open on the second hot blast transverse tube corresponding valve and change, close the fast valve that carries on the first hot blast transverse tube simultaneously by the emergency blower hot wind supply.
Valve on the said first hot blast transverse tube is the fast valve that carries, so that fast quick-opening valve and to two blast furnaces air feeds simultaneously, and fast quick-closing valve and to a blast furnace air feed.
The utility model compared with prior art has advantage and effect: adopt such scheme, can be at a certain blast furnace blowing engine fault trip and emergency blower does not start when complete as yet, and make full use of the gas blower that is moving in another blast furnace air feed unit; To two blast furnace air feeds, after emergency blower starts fully, promptly change simultaneously by the emergency blower air feed; Close the fast valve that carries on the first hot blast transverse tube simultaneously; The influence that makes two blast-furnace smeltinges all can not receive blower fault or gas blower to divide wind to keep normal smelting temperature, is avoided Yin Wendu decline and is caused the blast furnace slagging scorification; The perhaps generation of other accidents; Can reduce simultaneously gas blower investment and running cost significantly, and can reduce floor space, guarantee the stable of blast-furnace hot-air temperature and blast; Reduce and smelt fluctuation, this will have important practical significance to the energy-saving and cost-reducing of blast-furnace smelting.
Description of drawings
Fig. 1 is the structural representation of the utility model.
Embodiment
Below in conjunction with accompanying drawing the utility model is done and to be further described.
The energy-conservation air supply device of the blast-furnace hot-air that the utility model provides comprises gas blower 1 and 11, is communicated with the heating duct 2 of gas blower 1 and blast furnace 3 blast orifices; And the heating duct 10 that is communicated with gas blower 11 and blast furnace 6 blast orifices, wherein be provided with the first hot blast transverse tube 4 and the second hot blast transverse tube 8 between the heating duct 2 and 10, wherein in twos; The first hot blast transverse tube 4 is provided with valve 5, and this valve 5 is the fast valve that carries, and the two ends of the second hot blast transverse tube 8 are respectively equipped with valve 9 and 13; Be provided with threeway 7 between two valves 9 and 13, the 3rd end of this threeway 7 links to each other with emergency blower 12, breaks down and emergency blower 12 does not start when complete as yet with convenient gas blower 1; Open the fast valve 5 that carries on the first hot blast transverse tube 4; To two blast furnaces 3 and 6 hot blast is provided simultaneously by gas blower 11, treat that emergency blower 12 starts fully after, open valve 13 corresponding on the second hot blast transverse tube 8 and change by emergency blower 12 to blast furnace 3 hot wind supplies; Close the fast valve 5 that carries on the first hot blast transverse tube 4 simultaneously, make 11 of gas blowers to blast furnace 6 air feeds.Otherwise when gas blower 11 faults, and emergency blower 12 does not start when complete as yet; Open the fast valve 5 that carries on the first hot blast transverse tube 4; To two blast furnaces 3 and 6 hot blast is provided simultaneously by gas blower 1, treat that emergency blower 12 starts fully after, open valve 9 corresponding on the second hot blast transverse tube 8 and change by emergency blower 12 to blast furnace 6 hot wind supplies; Close the fast valve 5 that carries on the first hot blast transverse tube 4 simultaneously, make 1 of gas blower to blast furnace 3 air feeds.

Claims (2)

1. the energy-conservation air supply device of blast-furnace hot-air comprises gas blower, and the heating duct that is communicated with gas blower and blast furnace blast mouth; It is characterized in that being provided with between the heating duct in twos first, second hot blast transverse tube; Wherein, the first hot blast transverse tube is provided with valve, and the two ends of the second hot blast transverse tube are respectively equipped with valve; Be provided with threeway between two valves, the 3rd end of this threeway links to each other with emergency blower.
2. the energy-conservation air supply device of blast-furnace hot-air according to claim 1 is characterized in that the valve on the said first hot blast transverse tube is the fast valve that carries.
CN2011203826937U 2011-10-10 2011-10-10 Hot-blast air energy-saving air supply device for blast furnaces Expired - Fee Related CN202246726U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203826937U CN202246726U (en) 2011-10-10 2011-10-10 Hot-blast air energy-saving air supply device for blast furnaces

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203826937U CN202246726U (en) 2011-10-10 2011-10-10 Hot-blast air energy-saving air supply device for blast furnaces

Publications (1)

Publication Number Publication Date
CN202246726U true CN202246726U (en) 2012-05-30

Family

ID=46107997

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203826937U Expired - Fee Related CN202246726U (en) 2011-10-10 2011-10-10 Hot-blast air energy-saving air supply device for blast furnaces

Country Status (1)

Country Link
CN (1) CN202246726U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104152617A (en) * 2014-09-03 2014-11-19 四川德胜集团钒钛有限公司 Blast furnace air supply device and blast furnace
CN109487024A (en) * 2018-12-25 2019-03-19 云南玉溪仙福钢铁(集团)有限公司 Blast furnace gas and main air hose lead to net system
CN110686245A (en) * 2019-10-10 2020-01-14 北京航空航天大学 Long-life high temperature plasma torch medical waste innocent treatment system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104152617A (en) * 2014-09-03 2014-11-19 四川德胜集团钒钛有限公司 Blast furnace air supply device and blast furnace
CN109487024A (en) * 2018-12-25 2019-03-19 云南玉溪仙福钢铁(集团)有限公司 Blast furnace gas and main air hose lead to net system
CN109487024B (en) * 2018-12-25 2024-02-09 云南玉溪仙福钢铁(集团)有限公司 Blast furnace gas and main air pipe net system
CN110686245A (en) * 2019-10-10 2020-01-14 北京航空航天大学 Long-life high temperature plasma torch medical waste innocent treatment system

Similar Documents

Publication Publication Date Title
US20140217653A1 (en) System for energy optimization in a plant for producing direct-reduced metal ores
CN202246726U (en) Hot-blast air energy-saving air supply device for blast furnaces
CN110129497B (en) Series preheating process and system for pulverized coal injection of blast furnace and air/gas of hot blast stove
CN203007295U (en) Novel blast-furnace hot blast stove exhaust gas classification recycle device
CN103966379A (en) Waste air recycling device of hot blast stove with waste air buffer tank
JP2008214735A (en) Method for operating blast furnace
CN109487024B (en) Blast furnace gas and main air pipe net system
CN103388047B (en) Converter dry dust-removal system and technique
CN102010919A (en) Process for blasting oxygen-enriched hot blast to blast furnace and device applied to same
CN104457215A (en) Method for preparing high-temperature molten iron by fusing casting pigs
CN102344980B (en) Air dispensation control system for blower system of blast furnace in metallurgical enterprise
CN103063044B (en) Rotary hearth furnace smoke waste heat utilization system and rotary hearth furnace fume afterheat Application way
CN114959146B (en) Hot-blast stove pressure charging and discharging system and control method thereof
CN115029492B (en) Hot-blast stove pressure charging and discharging system and control method thereof
CN209722189U (en) Blast furnace gas and main air hose lead to net system
CN201867081U (en) Waste heat utilization system for low-temperature smoke of heating furnace
CN207528076U (en) A kind of sinter waste heat consecutive recovery system of common boiler and generating set
CN202947489U (en) Waste-heat cascaded utilization system at low-temperature sections of sintering circular cooling machine
CN211546586U (en) Flue gas furnace cooling device for coal injection of blast furnace
CN102041337A (en) Multi-purpose system for high-temperature preheating of hot blast furnace combustion-supporting air
CN207362271U (en) A kind of dial device for being used to improve blast furnace blower air feed reliability
CN105420435A (en) Automatic blast furnace air adjusting system and air adjusting method for metallurgic industry
CN205228172U (en) A hot air system and smelting device for smelt
CN203333472U (en) Rock wool producing mechanism of cupola furnace
CN206130407U (en) Hot -air pipes axial compression compensator and have hot -air pipes of this compensator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120530

Termination date: 20141010

EXPY Termination of patent right or utility model