CN202241581U - Concrete pipe pile tensioning system - Google Patents
Concrete pipe pile tensioning system Download PDFInfo
- Publication number
- CN202241581U CN202241581U CN2011203519021U CN201120351902U CN202241581U CN 202241581 U CN202241581 U CN 202241581U CN 2011203519021 U CN2011203519021 U CN 2011203519021U CN 201120351902 U CN201120351902 U CN 201120351902U CN 202241581 U CN202241581 U CN 202241581U
- Authority
- CN
- China
- Prior art keywords
- plate
- draw
- stretch
- pipe pile
- interior
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model relates to a concrete pipe pile tensioning system. The system comprises a pipe pile mould and wire cages arranged in the pipe pile mould, wherein a head tip plate and a tail tip plate are respectively arranged at the two ends of the wire cages. The system is characterized in that an outer tensioning plate is fixed at the head end of the pipe pile mould; the head tip plate is connected with an inner tensioning plate; and a lock screw is fixed in the center of the inner tensioning plate and is locked with a lock nut by a thread after extending out of the outer tensioning plate. The system has the following advantages that: the inner tensioning plate is connected with the head tip plate, the lock nut is matched with the outer tensioning plate to apply tension to the lock screw and the head tip plate is pulled by the inner tensioning plate connected with the lock screw so that the wire cages bear uniform stress, thus ensuring the quality of the moulded pipe piles; and the tensioning system has less assemblies and low manufacturing cost.
Description
Technical field
The utility model relates to a kind of concrete tubular pile tensioning system, the concrete tubular pile tensioning system that particularly a kind of stretch-draw is effective.
Background technology
Along with the development of concrete technology, the technology of concrete tubular pile also reaches its maturity, and except that being applied to industry, civil buildings, also is widely used in each field such as bridge, harbour, railway or hydraulic engineering.
When carrying out the production of concrete tubular pile; Need carry out prestressed stretch-draw to the wire basket in the pipe pile die; Stretching force is directly delivered on the end plate in the present tensioning system, and its unbalance stress is prone to produce eccentric; The prestressing force of wire basket PC rod is inconsistent after the moulding, and the tension of pile tube, anti-pressure ability and shear resistance all are affected.
Number of patent application 201020003653.2 discloses a kind of tubular pile pre-stress stretching device; It has gusset piece through bolt on the end plate of wire basket; And the other end of gusset piece is connected with coupling head, and the inner nut built-in through coupling head connects with tie down screw.Through inner nut and coupling head cooperation gusset piece is applied pulling force by tie down screw during stretch-draw, make stretching force evenly be delivered on the end plate, each point prestressing force basically identical, Forming Quality is better.Its shortcoming is: tie down screw is connected with end plate through coupling head, inner nut, gusset piece, and parts are many, and manufacturing cost is higher, and the pile tube that caliber is bigger is particularly evident.In addition, adopt bolt thread locking between gusset piece and the end plate, need disassemble when putting, more time-consuming, influence integral body put an efficient.
Summary of the invention
The technical problem that the utility model will solve provides the effective concrete tubular pile tensioning system of a kind of stretch-draw.
For solving the problems of the technologies described above; The technical scheme of the utility model is: a kind of concrete tubular pile tensioning system; Comprise pipe pile die, and be located at the wire basket in the pipe pile die, the two ends of said wire basket are respectively first end plate and tail end plate; Its innovative point is: the head end of said pipe pile die is fixed with outer stretch-draw plate; Said first end plate is connected with interior stretch-draw plate, said in stretch-draw plate center fixation one tie down screw is arranged, behind the protruding outer stretch-draw plate of said tie down screw with locking nut screw-threaded coupling.
Further; Said first end plate is connected with interior stretch-draw plate through quick detaching structure; Its concrete structure is: be connected with some interior stretch-draw crab bolts on the said first end plate; Be evenly distributed with the corresponding connecting hole of some and interior stretch-draw crab bolt on the stretch-draw plate in said; Said connecting hole is formed by being communicated with transitional pore and locking hole, and the aperture of said transitional pore is greater than the outer end diameter of interior stretch-draw crab bolt, and the aperture of said locking hole is greater than the body of rod external diameter of interior stretch-draw crab bolt and less than the outer end diameter of interior stretch-draw crab bolt.
The advantage of the utility model is: interior stretch-draw plate is connected with first end plate; Adopt locking nut to cooperate tie down screw is applied pulling force with outer stretch-draw plate; Interior stretch-draw plate through being connected with tie down screw spurs first end plate, and wire basket is stressed evenly, pile tube quality after the assurance moulding; And the tensioning system assembly is few, and cost of manufacture is low.
First end plate is connected with interior stretch-draw plate through quick detaching structure; During use; Interior stretch-draw crab bolt screw-threaded coupling is on first end plate, and stretch-draw crab bolt in the transitional pore of interior stretch-draw plate is aimed at makes the end of interior stretch-draw crab bolt stretch out transitional pore; The stretch-draw crab bolt was transferred in the locking hole in the stretch-draw plate can make in rotating again, and the aperture that utilizes locking hole realizes fixing first end plate and being connected of interior stretch-draw plate greater than the body of rod external diameter of interior stretch-draw crab bolt and less than the outer end diameter of interior stretch-draw crab bolt.Only need reverse during dismounting to make first paragraph header plate and interior stretch-draw plate break away from, and need not demounting bolt, can improve and put an efficient.
Description of drawings
Fig. 1 is the utility model concrete tubular pile tensioning system structural representation.
Fig. 2 is an interior stretch-draw plate structure sketch map in the utility model.
The specific embodiment
Like Fig. 1, shown in 2, comprise pipe pile die 1, wire basket 2, first end plate 3, tail end plate 4, interior stretch-draw plate 5, interior stretch-draw crab bolt 6, transitional pore 71, locking hole 72, outer stretch-draw plate 8, tie down screw 9, locking nut 10.
Be provided with wire basket 2 in the aforementioned tube pile die 1, the end near pipe pile die 1 head end in the two ends of wire basket 2 is provided with first end plate 3, is provided with tail end plate 4 near an end of pipe pile die 1 tail end.If concrete tubular pile is binodal stake or more piece stake, its wire basket is more than two covers or two overlap, to connect through stretch-draw splicer 11 between the then adjacent wire basket.
Stretch-draw plate 5 in being connected with on the first end plate 3; Should be connected with first end plate 3 through quick detaching structure by interior stretch-draw plate 5; Its concrete structure is: be connected with some interior stretch-draw crab bolts 6 on the first end plate 3; Be evenly distributed with the corresponding connecting hole of some and interior stretch-draw crab bolt 6 on the interior stretch-draw plate 5; This connecting hole is formed with locking hole 72 by being communicated with transitional pore 71, and the aperture of transitional pore 71 is greater than the outer end diameter of interior stretch-draw crab bolt 6, and the aperture of locking hole 72 is greater than the body of rod external diameter of interior stretch-draw crab bolt 6 and less than the outer end diameter of interior stretch-draw crab bolt 6.
The head end of pipe pile die 1 is fixed with outer stretch-draw plate 8, and this outer stretch-draw plate 8 is the flange arrangement of center drilling, and it is connected locking through bolt with the head end flange face of pipe pile die 1.
The tail end flange face of pipe pile die 1 is fixed with tailgate 12, has two circle flange holes on the tailgate 12, and it is connected locking through bolt with the tail end flange face and the tail end plate 4 of pipe pile die 1 respectively.Be fixed with the illiteracy plate between tail end plate 4 and the tailgate 12.
Interior stretch-draw plate 5 centers are provided with a tie down screw 9, and these tie down screw 9 one ends are locked through the female thread structure and the interior stretch-draw plate 5 at interior stretch-draw plate 5 centers, and the hole rear thread cunning at the protruding outer stretch-draw plate of the other end of tie down screw 98 centers is joined a locking nut 10.
When tie down screw 9 length are not enough, can connect other end tie down screw through nut sleeve and realize lengthening.
During use, rotational lock nut 10, locking nut 10 cooperate with outer stretch-draw plate 8 tie down screw 9 are applied pulling force, spur first end plate 3 through the interior stretch-draw plate 5 that is connected with tie down screw 9, and wire basket 2 is stressed evenly.
Claims (2)
1. concrete tubular pile tensioning system; Comprise pipe pile die, and be located at the wire basket in the pipe pile die, the two ends of said wire basket are respectively first end plate and tail end plate; It is characterized in that: the head end of said pipe pile die is fixed with outer stretch-draw plate; Said first end plate is connected with interior stretch-draw plate, said in stretch-draw plate center fixation one tie down screw is arranged, behind the protruding outer stretch-draw plate of said tie down screw with locking nut screw-threaded coupling.
2. concrete tubular pile tensioning system according to claim 1; It is characterized in that: said first end plate is connected with interior stretch-draw plate through quick detaching structure; Its concrete structure is: be connected with some interior stretch-draw crab bolts on the said first end plate; Be evenly distributed with the corresponding connecting hole of some and interior stretch-draw crab bolt on the stretch-draw plate in said; Said connecting hole is formed by being communicated with transitional pore and locking hole, and the aperture of said transitional pore is greater than the outer end diameter of interior stretch-draw crab bolt, and the aperture of said locking hole is greater than the body of rod external diameter of interior stretch-draw crab bolt and less than the outer end diameter of interior stretch-draw crab bolt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011203519021U CN202241581U (en) | 2011-09-20 | 2011-09-20 | Concrete pipe pile tensioning system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011203519021U CN202241581U (en) | 2011-09-20 | 2011-09-20 | Concrete pipe pile tensioning system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202241581U true CN202241581U (en) | 2012-05-30 |
Family
ID=46102875
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011203519021U Expired - Fee Related CN202241581U (en) | 2011-09-20 | 2011-09-20 | Concrete pipe pile tensioning system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202241581U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102366971A (en) * | 2011-09-20 | 2012-03-07 | 国鼎(南通)管桩有限公司 | Stretching system for concrete tubular pile |
CN102689360A (en) * | 2012-06-07 | 2012-09-26 | 江苏中技桩业有限公司 | Tensioning disassembly-free tail board on square pile die |
CN102689359A (en) * | 2012-06-07 | 2012-09-26 | 江苏中技桩业有限公司 | Tensioning disassembly-free head board on square pile die |
CN115897886A (en) * | 2022-11-28 | 2023-04-04 | 苏州金螳螂建筑装饰股份有限公司 | Public space modularization metal mesh furred ceiling project organization |
-
2011
- 2011-09-20 CN CN2011203519021U patent/CN202241581U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102366971A (en) * | 2011-09-20 | 2012-03-07 | 国鼎(南通)管桩有限公司 | Stretching system for concrete tubular pile |
CN102689360A (en) * | 2012-06-07 | 2012-09-26 | 江苏中技桩业有限公司 | Tensioning disassembly-free tail board on square pile die |
CN102689359A (en) * | 2012-06-07 | 2012-09-26 | 江苏中技桩业有限公司 | Tensioning disassembly-free head board on square pile die |
CN102689359B (en) * | 2012-06-07 | 2014-08-20 | 江苏中技桩业有限公司 | Tensioning disassembly-free head board on square pile die |
CN102689360B (en) * | 2012-06-07 | 2014-08-20 | 江苏中技桩业有限公司 | Tensioning disassembly-free tail board on square pile die |
CN115897886A (en) * | 2022-11-28 | 2023-04-04 | 苏州金螳螂建筑装饰股份有限公司 | Public space modularization metal mesh furred ceiling project organization |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102366971A (en) | Stretching system for concrete tubular pile | |
CN202241581U (en) | Concrete pipe pile tensioning system | |
CN111058440A (en) | Mechanical connecting device of concrete precast pile and manufacturing method | |
CN201125491Y (en) | Prestress rib fixed end anchorage | |
CN101696591A (en) | Steel strand connector | |
CN101413397A (en) | Self drilling rock bolt | |
CN211735370U (en) | Mechanical connecting device of concrete precast pile | |
CN104533018A (en) | Prestressed FRP rib tensioning and anchoring device | |
CN107419809A (en) | A kind of assembled architecture connector | |
CN106626045A (en) | Prestressed concrete pole as well as mold and manufacturing method thereof | |
CN203510449U (en) | Novel tension device for pipe pile production | |
CN103469967B (en) | Steel bar connecting sleeve of fabricated constructional member of reinforced concrete member | |
CN208702437U (en) | A kind of anchor structure, connection anchor structure and outer anchoring system | |
CN202611109U (en) | Steel strand connector | |
CN204431470U (en) | A kind of concrete pipe pile tensioning system | |
CN104234325B (en) | The installation method of FRP rib tape screw plug bond type anchorage | |
CN202622987U (en) | Tensioning tool for simultaneously manufacturing a plurality of prestressed concrete pipe piles | |
CN204357005U (en) | Prestressed FRP rib tensioning and anchoring device | |
CN104989106A (en) | Full prestress tension plate external member | |
CN102672821A (en) | Tensioning tool for simultaneously manufacturing prestressed concrete pipe piles | |
CN1323254C (en) | Super large caliber centripetal stress high pressure water transport pipe and its preparing process | |
CN103266668B (en) | A kind of bamboo structure conversion connector | |
CN102366970A (en) | Integral tension device for concrete tubular pile | |
CN204492012U (en) | A kind of bar connecting device | |
CN204827500U (en) | Pinniform wedge body stock |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120530 Termination date: 20180920 |
|
CF01 | Termination of patent right due to non-payment of annual fee |