CN104989106A - Full prestress tension plate external member - Google Patents

Full prestress tension plate external member Download PDF

Info

Publication number
CN104989106A
CN104989106A CN201510394631.0A CN201510394631A CN104989106A CN 104989106 A CN104989106 A CN 104989106A CN 201510394631 A CN201510394631 A CN 201510394631A CN 104989106 A CN104989106 A CN 104989106A
Authority
CN
China
Prior art keywords
stretch
hole
tension plate
external member
stretch board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510394631.0A
Other languages
Chinese (zh)
Inventor
高天宝
高跃峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUQIAN BAOXIANG HEAVY INDUSTRY Co Ltd
Original Assignee
SUQIAN BAOXIANG HEAVY INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUQIAN BAOXIANG HEAVY INDUSTRY Co Ltd filed Critical SUQIAN BAOXIANG HEAVY INDUSTRY Co Ltd
Priority to CN201510394631.0A priority Critical patent/CN104989106A/en
Publication of CN104989106A publication Critical patent/CN104989106A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a full prestress tension plate external member which comprises a tension plate. The tension plate is provided with vertical strengthening ribs, cross strengthening ribs, inclined strengthening ribs, a screw hole and through holes. The screw hole is formed in the center of the tension plate, the through holes are formed in the periphery of the tension plate at equal distances, and steps are arranged in the through holes. The vertical strengthening ribs and the cross strengthening ribs are arranged on the peripheries of the through holes, the inclined strengthening ribs are arranged between the screw hole and the vertical strengthening ribs and between the screw hole and the cross strengthening ribs, and a guide sleeve is arranged in each through hole. The guide sleeves and the through holes are connected in clearance fit, the guide sleeves are detachable and can be replaced in time after being abraded, so that the production cost is saved, and the strength and the precision of a prefabricated pile are improved. In addition, the integral forming manufacturing mode is adopted for the tension plate and a tail tension plate, the vertical strengthening ribs, the cross strengthening ribs and the inclined strengthening ribs are arranged on the tension plate and the tail tension plate, the tensile strength of the tension plate and the tail tension plate is greatly improved, the tension plate and the tail tension plate are not likely to deform in the tension process, and the bearing force is higher.

Description

Full prestressing stretch board external member
Technical field
The present invention relates to preformed pile manufacturing technology field, be specifically related to full prestressing stretch board external member.
Background technology
At present, prestressed concrete member, such as pile tube and square pile etc. are important pile foundation materials, and it is widely used in the Foundation Design of all kinds of building and construction, as the field such as highrise building, public building, general industry and civilian construction, harbour, harbour, speedway, bridge.
When with concrete casting stake, need through very important operation, i.e. a tension process.Existing stretch-draw external member has the following disadvantages:
1, stretch board is at the position be connected with the main muscle of prestressing force because long-term stretch-draw is stressed, there will be wearing and tearing, if change in time, then greatly can increase the cost of production of pile body; If do not change, then can affect the prestress strength of pile body;
2, the tensile strength of stretch board and stretch-draw tailgate is inadequate, and easy compressive deformation is scrapped, and changes not in time, directly causes an end slope;
Therefore, need a kind of new stretch board external member of development badly and solve these problems.
Summary of the invention
The object of the invention is to: for the above-mentioned technical problem existed in prior art, a kind of full prestressing stretch board external member is provided.
The present invention is achieved by the following technical solutions:
Full prestressing stretch board external member, comprises stretch board, and described stretch board is provided with vertical stiffener rib, transverse stiffener rib, tiltedly reinforcing rib, screw and through hole, and described screw is arranged on the center of stretch board, and four limits of stretch board are equidistantly provided with through hole, are provided with step in described through hole; The surrounding of described through hole is equipped with vertical stiffener rib and transverse stiffener rib, is provided with oblique reinforcing rib, is equipped with guide pin bushing in each described through hole between described screw and vertical stiffener rib, transverse stiffener rib.
As preferably, the number of described through hole is identical with the number of the main muscle of stake prestressing with bond.
As preferably, comprise stretch-draw tailgate, described stretch-draw tailgate is provided with through hole, vertical stiffener rib and transverse stiffener rib, four limits of described stretch-draw tailgate are equidistantly provided with through hole, step is provided with in described through hole, be equipped with guide pin bushing in each described through hole, described stretch-draw tailgate is separated into multiple lattice by vertical stiffener rib, transverse stiffener rib.
As preferably, also comprise tensioning nut, tensioning nut is made up of connector and screw rod, and described connector matches with screw and locks, and the external surface of connector is provided with the external screw thread matched with the screw thread of screw, and described screw rod is also provided with screw thread.
As preferably, described guide pin bushing and through hole are that matched in clearance is connected.
As preferably, described lattice is rectangle or square.
As preferably, described stretch board, stretch-draw tailgate are all formed in one.
As preferably, described stretch board, stretch-draw tailgate are square or circular.
As preferably, described stretch-draw tailgate is provided with the inserted block with mould grafting.
In sum, owing to have employed technique scheme, the invention has the beneficial effects as follows:
1, guide pin bushing of the present invention and through hole adopt matched in clearance to be connected, and guide pin bushing is demountable, can change in time, not only save cost of production like this, also improve intensity and the precision of preformed pile after guide pin bushing wearing and tearing.
2, stretch board, stretch-draw tailgate are adopted integrated processing mode by the present invention, and on stretch board, stretch-draw tailgate, be provided with vertical stiffener rib, transverse stiffener rib, tiltedly reinforcing rib, greatly strengthen the tensile strength of stretch board and stretch-draw tailgate, make it not yielding when stretch-draw, bearing capacity is stronger.
Accompanying drawing explanation
Examples of the present invention will be described by way of reference to the accompanying drawings, wherein:
Fig. 1 is the main TV structure schematic diagram of stretch board of the present invention;
Fig. 2 is stretch board side-looking structural representation of the present invention;
Fig. 3 is the main TV structure schematic diagram of stretch-draw tailgate of the present invention;
Fig. 4 is stretch-draw tailgate side-looking structural representation of the present invention;
Fig. 5 is tensioning nut structural representation of the present invention;
Fig. 6 is fixed charge method end plate structural representation of the present invention;
Overall structure schematic diagram when Fig. 7 is stretch-draw of the present invention;
Mark in figure: 1-stretch-draw tailgate, 2-through hole, 3-vertical stiffener rib, 4-transverse stiffener rib, 5-tiltedly reinforcing rib, 6-stretch board, 7-screw, 8-tensioning nut, 9-nut, 10-mould, the main muscle of 11-prestressing force, 12-fixed charge method end plate, 13-inserted block.
Detailed description of the invention
All features disclosed in this manual, or the step in disclosed all methods or process, except mutually exclusive feature and (or) step, all can combine by any way.
Arbitrary feature disclosed in this manual (comprising any accessory claim, summary and accompanying drawing), unless specifically stated otherwise, all can be replaced by other equivalences or the alternative features with similar object.That is, unless specifically stated otherwise, each feature is an example in a series of equivalence or similar characteristics.
As shown in Figures 1 to 6, full prestressing stretch board external member, comprise stretch board 6, described stretch board 6 is provided with vertical stiffener rib 3, transverse stiffener rib 4, tiltedly reinforcing rib 5, screw 7 and through hole 2, described screw 7 is arranged on the center of stretch board 6, four limits of stretch board 6 are equidistantly provided with through hole 2, are provided with step in described through hole 2; The surrounding of described through hole 2 is equipped with vertical stiffener rib 3 and transverse stiffener rib 4, is provided with oblique reinforcing rib 5, is equipped with guide pin bushing in each described through hole 2 between described screw 7 and vertical stiffener rib 3, transverse stiffener rib 4, described guide pin bushing with through hole 2 for matched in clearance is connected; The number of described through hole 2 is identical with the number of the main muscle of stake prestressing with bond 11, and in the present embodiment, through hole 2 is provided with 16 altogether.
Full prestressing stretch board external member, comprise stretch-draw tailgate 1, described stretch-draw tailgate 1 is provided with through hole 2, vertical stiffener rib 3 and transverse stiffener rib 4, four limits of described stretch-draw tailgate 1 are equidistantly provided with through hole 2, step is provided with in described through hole 2, guide pin bushing is equipped with in each described through hole 2, through hole 2 number on stretch-draw tailgate 1 is also identical with the number of the main muscle of stake prestressing with bond, described stretch-draw tailgate 1 is separated into multiple lattice by vertical stiffener rib 3, transverse stiffener rib 3, wherein, lattice is rectangle or square, and stretch-draw tailgate 1 is provided with the inserted block with mould grafting.
Also comprise tensioning nut 8, tensioning nut 8 is made up of connector and screw rod, and described connector matches with screw 7 and locks, and the external surface of connector is provided with the external screw thread matched with the screw thread of screw 7, described screw rod is also provided with screw thread, and the stretch-draw that matches with nut 9 of this screw thread is used.
Described stretch board 6, stretch-draw tailgate 1 are all formed in one, described stretch board 6, stretch-draw tailgate 1 are in square, rectangle or circle etc., the shape of stretch board 6, stretch-draw tailgate 1 and fixed charge method end plate 12 is determined according to different pile dies, wherein, in the present embodiment, what stretch board 6, stretch-draw tailgate 1, fixed charge method end plate 12 adopted is square.
As shown in Figure 7, the present invention is when reality uses, stretch-draw tailgate 1 one end by the main muscle 11 of guide pin bushing and stud and prestressing force is connected, and stretch-draw tailgate 1 is fixed on one end of mould 10, the other end of stretch board 6 by the main muscle 11 of guide pin bushing and stud and prestressing force is connected, fixed charge method end plate 12 is arranged on the other end of mould 10 by bolt, by tensioning nut 8 successively through the intermediate throughholes of fixed charge method end plate 12, and by fastening by threaded engagement for the screw 7 of the connector of tensioning nut 8 and stretch board 6, the screw thread on connecting rod and nut 9 locked and carries out stretch-draw.
Wherein, larger than through hole 2 internal diameter 2 of the guide pin bushing external diameter adopted in the present embodiment, then directly pounds guide pin bushing in through hole 2, but guide pin bushing is not limited thereto method, as long as guide pin bushing can be arranged in through hole.
Can change after guide pin bushing wearing and tearing of the present invention, not only save cost like this, stretch board and stretch-draw tailgate can also be made repeatedly to reuse, economize on resources; And by being provided with vertical stiffener rib, transverse stiffener rib, tiltedly reinforcing rib, all by machining center one-shot forming, greatly strengthen the tensile strength of stretch board, stretch-draw tailgate, not yielding when making its stretch-draw, ensure the required precision of pile body stretch-draw, be noted that reinforcing rib structure of the present invention is not limited only to shown in drawing.
Above-described specific embodiment, further describes object of the present invention, technical scheme and beneficial effect, and institute it should be understood that and the foregoing is only specific embodiments of the invention, is not limited to the present invention.The present invention expands to any new feature of disclosing in this manual or any combination newly, and the step of the arbitrary new method disclosed or process or any combination newly.

Claims (9)

1. full prestressing stretch board external member, is characterized in that, comprises stretch board, described stretch board is provided with vertical stiffener rib, transverse stiffener rib, tiltedly reinforcing rib, screw and through hole, described screw is arranged on the center of stretch board, and four limits of stretch board are equidistantly provided with through hole, are provided with step in described through hole; The surrounding of described through hole is equipped with vertical stiffener rib and transverse stiffener rib, is provided with oblique reinforcing rib, is equipped with guide pin bushing in each described through hole between described screw and vertical stiffener rib, transverse stiffener rib.
2. full prestressing stretch board external member according to claim 1, is characterized in that, the number of described through hole is identical with the number of the main muscle of stake prestressing with bond.
3. full prestressing stretch board external member according to claim 1, it is characterized in that, comprise stretch-draw tailgate, described stretch-draw tailgate is provided with through hole, vertical stiffener rib and transverse stiffener rib, four limits of described stretch-draw tailgate are equidistantly provided with through hole, be provided with step in described through hole, be equipped with guide pin bushing in each described through hole, described stretch-draw tailgate is separated into multiple lattice by vertical stiffener rib, transverse stiffener rib.
4. full prestressing stretch board external member according to claim 1, it is characterized in that, also comprise tensioning nut, tensioning nut is made up of connector and screw rod, described connector matches with screw and locks, the external surface of connector is provided with the external screw thread matched with the screw thread of screw, and described screw rod is also provided with screw thread.
5. full prestressing stretch board external member according to claim 1, is characterized in that, described guide pin bushing and through hole are that matched in clearance is connected.
6. full prestressing stretch board external member according to claim 3, is characterized in that, described lattice is rectangle or square.
7. the full prestressing stretch board external member according to claim 1 or 3, is characterized in that, described stretch board, stretch-draw tailgate are all formed in one.
8. the full prestressing stretch board external member according to claim 1 or 3, is characterized in that, described stretch board, stretch-draw tailgate are square or circle.
9. full prestressing stretch board external member according to claim 3, is characterized in that, described stretch-draw tailgate is provided with the inserted block with mould grafting.
CN201510394631.0A 2015-07-08 2015-07-08 Full prestress tension plate external member Pending CN104989106A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510394631.0A CN104989106A (en) 2015-07-08 2015-07-08 Full prestress tension plate external member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510394631.0A CN104989106A (en) 2015-07-08 2015-07-08 Full prestress tension plate external member

Publications (1)

Publication Number Publication Date
CN104989106A true CN104989106A (en) 2015-10-21

Family

ID=54300987

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510394631.0A Pending CN104989106A (en) 2015-07-08 2015-07-08 Full prestress tension plate external member

Country Status (1)

Country Link
CN (1) CN104989106A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106976154A (en) * 2016-01-18 2017-07-25 周兆弟 A kind of concrete-pile tensioning attachment means
CN106976149A (en) * 2016-01-18 2017-07-25 周兆弟 A kind of end plate of concrete prefabricated pile die
CN106976156A (en) * 2016-01-18 2017-07-25 周兆弟 A kind of tensioning board component of concrete prefabricated pile die

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1446677A (en) * 2002-03-21 2003-10-08 金承洙 Method and appts. for mfg. pole
JP2007144920A (en) * 2005-11-30 2007-06-14 Geotop Corp Connector for straining
KR20120056115A (en) * 2010-11-24 2012-06-01 주식회사 알파이엔씨 Locking device tension bar for electric pole
CN202416303U (en) * 2011-11-22 2012-09-05 上海中技桩业股份有限公司 End plate of prestressed concrete hollow square pile
CN202781422U (en) * 2012-08-09 2013-03-13 上海中技桩业股份有限公司 Prestress precast pile fast connect stretch-draw piece assembly
CN203510449U (en) * 2013-09-26 2014-04-02 丹阳市华发环保机械有限公司 Novel tension device for pipe pile production
CN203579870U (en) * 2013-09-29 2014-05-07 国鼎(南通)管桩有限公司 Prestress combined support pile steel mold structure
CN104070603A (en) * 2014-05-30 2014-10-01 江苏固丰管桩集团有限公司 Tensioning assembly for producing prestressed concrete pile without end plate
CN204960340U (en) * 2015-07-08 2016-01-13 宿迁市保祥重工有限公司 Full -prestressed stretch -draw sleeve -board spare

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1446677A (en) * 2002-03-21 2003-10-08 金承洙 Method and appts. for mfg. pole
JP2007144920A (en) * 2005-11-30 2007-06-14 Geotop Corp Connector for straining
KR20120056115A (en) * 2010-11-24 2012-06-01 주식회사 알파이엔씨 Locking device tension bar for electric pole
CN202416303U (en) * 2011-11-22 2012-09-05 上海中技桩业股份有限公司 End plate of prestressed concrete hollow square pile
CN202781422U (en) * 2012-08-09 2013-03-13 上海中技桩业股份有限公司 Prestress precast pile fast connect stretch-draw piece assembly
CN203510449U (en) * 2013-09-26 2014-04-02 丹阳市华发环保机械有限公司 Novel tension device for pipe pile production
CN203579870U (en) * 2013-09-29 2014-05-07 国鼎(南通)管桩有限公司 Prestress combined support pile steel mold structure
CN104070603A (en) * 2014-05-30 2014-10-01 江苏固丰管桩集团有限公司 Tensioning assembly for producing prestressed concrete pile without end plate
CN204960340U (en) * 2015-07-08 2016-01-13 宿迁市保祥重工有限公司 Full -prestressed stretch -draw sleeve -board spare

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106976154A (en) * 2016-01-18 2017-07-25 周兆弟 A kind of concrete-pile tensioning attachment means
CN106976149A (en) * 2016-01-18 2017-07-25 周兆弟 A kind of end plate of concrete prefabricated pile die
CN106976156A (en) * 2016-01-18 2017-07-25 周兆弟 A kind of tensioning board component of concrete prefabricated pile die
CN106976156B (en) * 2016-01-18 2022-09-09 周兆弟 Tensioning plate assembly of concrete precast pile mould

Similar Documents

Publication Publication Date Title
CN104385454A (en) Common threaded steel tensioning device and prefabricated square pile process
CN103758291A (en) Shearing reinforcing type semi-grouting sleeve
CN103758292A (en) Shearing reinforcing type full-grouting sleeve
CN104989106A (en) Full prestress tension plate external member
CN202323939U (en) Round end plate of prestressed concrete pipe pile
CN205421238U (en) Prefabricated pile body
CN205348589U (en) One end extrusion anchored half grout sleeve steel bar connection connect
CN203510449U (en) Novel tension device for pipe pile production
CN102366971A (en) Stretching system for concrete tubular pile
CN204960340U (en) Full -prestressed stretch -draw sleeve -board spare
CN104032837A (en) Design and construction for connection node between steel tube-reinforced concrete composite column and reinforced concrete beam
CN104164996A (en) Protection-layer-free concrete electric pole and manufacturing method thereof
CN107288030A (en) The method for making cylindrical concrete pier stud
CN105666688B (en) A kind of prefabricated pile, pile body and production method
CN202241581U (en) Concrete pipe pile tensioning system
CN204385729U (en) A kind of intensive PHC pile end board
CN103386709A (en) Shakeproof lift-preventing anti-bending preformed pile and manufacturing process of preformed pile
CN106401627A (en) Metal anchor rod with yielding function and using method thereof
CN203579870U (en) Prestress combined support pile steel mold structure
CN110953125A (en) Prefabricated polygonal prestressed concrete tower cylinder and manufacturing mold of cylinder sections thereof
CN201730108U (en) Tensioning and stressing reinforcement stress structure
CN212200393U (en) Hollow concrete pile
CN204471588U (en) A kind of large moment of flexure prestressed electric wire pole tensioning equipment
CN107288029A (en) The method for making square column type performance of concrete column confined
CN206299039U (en) The square concrete hollow column of centrifugal forming prestressing force

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20151021