CN202231192U - Quick connector for measuring and checking current secondary loop - Google Patents
Quick connector for measuring and checking current secondary loop Download PDFInfo
- Publication number
- CN202231192U CN202231192U CN2011203589607U CN201120358960U CN202231192U CN 202231192 U CN202231192 U CN 202231192U CN 2011203589607 U CN2011203589607 U CN 2011203589607U CN 201120358960 U CN201120358960 U CN 201120358960U CN 202231192 U CN202231192 U CN 202231192U
- Authority
- CN
- China
- Prior art keywords
- plug
- socket
- quick connector
- secondary loop
- current secondary
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
Abstract
The utility model discloses a quick connector for measuring and checking a current secondary loop, relates to a secondary metering loop used for the electrical energy output metering of a power plant, the electrical energy output or input metering of a power supply bureau substation, and the electrical energy input metering of a large-scale enterprise distributing center, belongs to the technical field of eletrotechnical instruments and other components, as well as related equipment, and aims to improve production efficiency, and overcome possible equipment and staff insecurity factors in watthour meter field test checking within a shortest time and using safest technical support measures. For achieving the purposes, the quick connector adopts the structure that two main parts including a socket and a plug are included. The socket is divided into an upper layer and a lower layer which are in double reed connection, and upper and lower layers of wiring terminals are connected with the double reeds through screws. The plug made of insulating material and taking a T shape is used transversely, wherein the front end is the head part of the plug and the rear end is the root of the plug, and the plug can be inserted into or pulled out of the socket.
Description
Technical field
A kind of electric current secondary loop of the utility model is measured verification and is used quick connector; Relate to the secondary table meter loop of power plant electric energy output metering, the electric energy output of electric substation of power supply administration or input metering, large enterprise's power distribution station electric energy input metering, belong to electrical instrument and other parts, corollary equipment technical field.
Background technology
Electric energy meter (kilowatt-hour meter) is State Grid Corporation of China and power plant, enterprise, and individual, the domestic consumer legal metering outfit that carries out the electric weight clearing.Because enterprise production and family life are to the supply requirement of electric energy and electric power; Especially special industry enterprise is to the uninterrupted requirement of supply of electrical energy; Make power-generating enterprise and State Grid Corporation of China, must twenty four hours uninterruptedly to electrical network, supply power to the enterprise customer.But electric energy meter (kilowatt-hour meter) must annual test as legal metering outfit, regularly, carry out verification and check.Traditional test verification way is with the qualified kilowatt-hour meter of verification in the sixth of the twelve Earthly Branches, displaces tested ammeter to the scene and takes back test institute, and after verification was waited to accomplish test by stages and in groups, secondary returned the scene, and former table meter is reinstalled the original place.Do two problems of existence like this, the one, it is not high from multiple efficiency to come and go the working site, and the 2nd, be the continuous operation that guarantees electrical production, the work of secondary circuit often all is live line working, can impact equipment and personal safety if any accident.In order to solve above-mentioned existing problems, further increase work efficiency, guarantee safety in production, existing way is to carry out the on-the-spot test verification.Carry out for guaranteeing the on-the-spot test verification everything goes well with your work; The utility model invention is a kind of; Electric current secondary loop is measured verification and is used quick connector, and the operation sequence when it has simplified staff's live line working provides guarantee from the technological improvement angle for the electrical production safe operation.It has played the saving of labor, has saved time, guaranteed the effect of safety in production.
Summary of the invention
The utility model invention is a kind of; Electric current secondary loop is measured verification and is used quick connector; Its goal of the invention is: in order to improve labor productivity, and with the fastest time, safest technical guarantee measure; Solve in the kilowatt-hour meter on-the-spot test verification contingent equipment and personal unsafe factor.
In order to realize the foregoing invention purpose, the utility model invention is a kind of, and electric current secondary loop is measured verification and used quick connector; It is made up of socket and plug two parts, and socket divides two-layer up and down, and the centre is designed with two-man act chip connected mode; The levels binding post is connected with the two-man act sheet through screw, and plug is that insulating material is processed the T word shape, laterally uses; Front end is the head of plug, and the rear end is the root of plug, can insert or extract in socket.
Further refinement analysis:
Said quick connector socket is connected through the two-man act sheet by terminal up and down, and the two-man act sheet of socket divides two up and down, is bent into former and later two contact-making surfaces respectively, sheet contact-making surface contact and connecting relatively up and down.Terminal and up and down between the two-man act sheet is fixedly connected with screw.This fixed screw is connected with external circuit through end word row.Reed is bent into former and later two contact-making surfaces up and down; Be in order to allow connector plug; When inserting socket bigger contact-making surface is arranged, can satisfy big electric current section needs first, second can make plug firm in socket, stable; Prevent single-point contact or contact-making surface is too small causes, plug rocks and causes short circuit and come off.Three moments in order to guarantee to insert at connector plug, contact instability in the time of can not producing because of insertion, and the triggering gap that forms outage phenomenon.When plug inserted last row's reed, tested loop was still in normal operation, and the master meter of this moment has sealed in circuit, but has just formed a diverter branch, and total loop is also in a loop.When plug continued to be inserted into back one row's reed, standard scale inserted tested loop fully.This classification is inserted, shunt the access way that afterwards seals in earlier, is the safe and effective procedure that the insertion current circuit is tested.
Said quick connector plug for insulating material is processed the T word shape, laterally uses.Front end is the head of plug, and the rear end is the root of plug, can insert or extract in socket.The header planes position of plug, branch upper strata are sheet metal, middle for insulating barrier, lower floor are the three-decker of sheet metal, and this structure appearance is to play interconnect function when inserting socket.The root of plug is little side's body, is provided with two jacks that are arranged above and below in square body front.In the jack respectively with plug up and down sheet metal be connected, this jack aims at external standard scale, seals in tested ammeter loop and designs.Can before sealing in standard scale, accomplish the wiring work of voltage circuit at leisure like this, shorten the on-line debugging time, farthest reduce because of debugging, and primary circuit is moved issuable influence.
Description of drawings
Fig. 1, measurement verification are inserted sketch map with quick connector.
Fig. 2, measurement verification are extracted sketch map with quick connector.
Fig. 3, measurement verification are inserted front-seat reed figure with quick connector.
Fig. 4, measurement verification are with quick connector plug sketch map.
Embodiment
In order further to understand the utility model, a kind of electric current secondary loop is measured the verification quick connector, and structure and connected mode now are explained as follows in conjunction with Figure of description.A kind of electric current secondary loop is measured verification and is used quick connector, and it is made up of socket 1, plug 2, two parts.
Socket 1 is made up of upper terminal 11, lower terminal 14, upper reed plate 12, following 13 of reeds.Between upper reed plate 12 and the upper terminal 11, be fixedly connected with screw through 17 screws.Between following reed 13 and the lower terminal 14, be fixedly connected with screw through 18 screws.The front-seat brace 15 of socket 1 last slice 12 with back row's brace 16 last slice 12 be consubstantiality bending formation.Following 13 of front-seat brace 15 and following 13 of back row's brace 16 are that the consubstantiality bending forms.Plug 2 is the T word shape, laterally uses.Flat position divides upper strata 21 to be sheet metal, and middle level 22 is an insulating barrier, and lower floor 23 is a sheet metal.Root is little side's body 24, the perforate that is arranged above and below of the front of little side's body 24, and last hole 25, hole 26 down are that standard scale connects socket.Last hole 25 is communicated with plug surface sheet metal 21; Following hole 26 is communicated with plug surface sheet metal 23; When plug 2 inserted the front-seat reed 15 of sockets 1, in 16 formation branch roads shuntings of brace 15 and brace, standard scale sealed in through jack 25,26 and tests the branch road shunting circuit.When plug 2 continued to be inserted into back row's reed 16, standard scale inserted tested loop fully, and brace 15 and 16 is linked as a conducting body through plug 2, and the branch road shunting disappears.Upper terminal 11 is connected with external circuit with lower terminal 14, and respectively with the fixed screw of terminal screw about in the of 17,18, row outwards connects through the end word.
Claims (4)
1. an electric current secondary loop is measured verification and is used quick connector, and it is characterized in that: connector is made up of socket and plug two parts, and socket divides two-layer up and down; Middle the levels binding post is connected with the two-man act sheet through screw with the design of two-man act chip connected mode, and plug is that insulating material is processed the T word shape; Laterally use; Front end is the head of plug, and the rear end is the root of plug, can insert or extract in socket.
2. a kind of electric current secondary loop according to claim 1 is measured verification and used quick connector, it is characterized in that: the two-man act sheet of socket divides two up and down, is bent into former and later two contact-making surfaces respectively, and the sheet contact-making surface contacts relatively and connects up and down.
3. a kind of electric current secondary loop according to claim 1 is measured verification and used quick connector, it is characterized in that: the header planes position of plug, branch upper strata are that sheet metal, centre are the three-decker of sheet metal for insulating barrier, lower floor.
4. a kind of electric current secondary loop according to claim 3 is measured verification and is used quick connector, and it is characterized in that: the root of plug is little side's body, is provided with two jacks that are arranged above and below in square body front.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011203589607U CN202231192U (en) | 2011-09-23 | 2011-09-23 | Quick connector for measuring and checking current secondary loop |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011203589607U CN202231192U (en) | 2011-09-23 | 2011-09-23 | Quick connector for measuring and checking current secondary loop |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202231192U true CN202231192U (en) | 2012-05-23 |
Family
ID=46081767
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011203589607U Expired - Lifetime CN202231192U (en) | 2011-09-23 | 2011-09-23 | Quick connector for measuring and checking current secondary loop |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202231192U (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2014040523A2 (en) * | 2012-09-13 | 2014-03-20 | 国家电网公司 | Composite intelligent terminal wiring device and plug device |
CN103698733A (en) * | 2013-09-18 | 2014-04-02 | 国家电网公司 | Test wiring terminal component for metering electric energy |
CN103904455A (en) * | 2014-03-30 | 2014-07-02 | 华北电力大学(保定) | Ampere meter series-connection access device |
CN104934749A (en) * | 2015-07-05 | 2015-09-23 | 西安科技大学 | An ammeter series access apparatus |
CN107390159A (en) * | 2017-07-31 | 2017-11-24 | 国网山东省电力公司青州市供电公司 | Tester for electric energy meter and its application method |
CN108429179A (en) * | 2018-05-11 | 2018-08-21 | 马鞍山钢铁股份有限公司 | A kind of high-pressure system relay protection pedestal and the method for building protective relaying device |
CN111505353A (en) * | 2020-06-18 | 2020-08-07 | 中国人民解放军91286部队航空仪器计量站 | Electrical detection instrument and method |
CN111650411A (en) * | 2020-07-16 | 2020-09-11 | 广东电网有限责任公司 | Joint junction box and electric energy metering device |
-
2011
- 2011-09-23 CN CN2011203589607U patent/CN202231192U/en not_active Expired - Lifetime
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9385445B2 (en) | 2012-09-13 | 2016-07-05 | State Grid Corporation Of China (Sgcc) | Composite intelligent terminal wiring device and plug device |
WO2014040523A3 (en) * | 2012-09-13 | 2014-05-08 | 国家电网公司 | Composite intelligent terminal wiring device and plug device |
WO2014040523A2 (en) * | 2012-09-13 | 2014-03-20 | 国家电网公司 | Composite intelligent terminal wiring device and plug device |
CN103698733A (en) * | 2013-09-18 | 2014-04-02 | 国家电网公司 | Test wiring terminal component for metering electric energy |
CN103698733B (en) * | 2013-09-18 | 2016-08-17 | 国家电网公司 | A kind of test connection terminal assemblies for electric energy metrical |
CN103904455A (en) * | 2014-03-30 | 2014-07-02 | 华北电力大学(保定) | Ampere meter series-connection access device |
CN104934749A (en) * | 2015-07-05 | 2015-09-23 | 西安科技大学 | An ammeter series access apparatus |
CN104934749B (en) * | 2015-07-05 | 2017-09-05 | 西安科技大学 | A kind of ammeter series connection access device |
CN107390159A (en) * | 2017-07-31 | 2017-11-24 | 国网山东省电力公司青州市供电公司 | Tester for electric energy meter and its application method |
CN107390159B (en) * | 2017-07-31 | 2022-08-23 | 国网山东省电力公司青州市供电公司 | Electric energy meter calibration device and use method thereof |
CN108429179A (en) * | 2018-05-11 | 2018-08-21 | 马鞍山钢铁股份有限公司 | A kind of high-pressure system relay protection pedestal and the method for building protective relaying device |
CN111505353A (en) * | 2020-06-18 | 2020-08-07 | 中国人民解放军91286部队航空仪器计量站 | Electrical detection instrument and method |
CN111650411A (en) * | 2020-07-16 | 2020-09-11 | 广东电网有限责任公司 | Joint junction box and electric energy metering device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202231192U (en) | Quick connector for measuring and checking current secondary loop | |
CN103698733B (en) | A kind of test connection terminal assemblies for electric energy metrical | |
CN205120909U (en) | General type multigrid line battery piece test probes row | |
CN203025343U (en) | Compound type intelligent terminal junction device | |
CN202094403U (en) | Combined metering socket | |
CN202903924U (en) | On-line metering device with carrier communication function | |
CN212111482U (en) | Conversion operation box | |
CN202651556U (en) | In-line collection device with integration of current monitoring | |
CN204832412U (en) | Novel combined instrument transformer polarity test appearance | |
CN207780219U (en) | A kind of voltage transformer no-load loss comprehensive tester | |
CN206387863U (en) | A kind of intelligent electric energy meter transformer detection means | |
CN202494712U (en) | Portable metering device for electricity utilization of unit | |
CN205317876U (en) | Device is checked to cable core | |
CN201289915Y (en) | Secondary circuit pressure-drop measuring access kit of voltage transformator | |
CN205005019U (en) | A test device for distributed photovoltaic power generation and network system | |
CN212301655U (en) | Uninterrupted meter replacing device | |
CN208443900U (en) | A kind of DC current transformer | |
CN201655528U (en) | Multi-purpose CT secondary short-circuited terminal | |
CN202676807U (en) | A ground resistance measuring device | |
CN208568897U (en) | A kind of DC voltage transformer | |
CN203025342U (en) | Integrated smart connecting plug for checkout | |
CN203479896U (en) | Directly access type high voltage electric energy metering system | |
CN202940137U (en) | Insulating operating rod provided with electroscope | |
CN202995025U (en) | Composite type intelligent terminal junction box | |
CN204440776U (en) | New-type circuit teaching experiment board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20120523 |