CN202215263U - Coal mine underground crossheading forepoling supporting frame - Google Patents
Coal mine underground crossheading forepoling supporting frame Download PDFInfo
- Publication number
- CN202215263U CN202215263U CN2011202738515U CN201120273851U CN202215263U CN 202215263 U CN202215263 U CN 202215263U CN 2011202738515 U CN2011202738515 U CN 2011202738515U CN 201120273851 U CN201120273851 U CN 201120273851U CN 202215263 U CN202215263 U CN 202215263U
- Authority
- CN
- China
- Prior art keywords
- frame
- base
- hinged
- hydraulic
- middle frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model relates to a coal mine underground crossheading forepoling supporting frame, which consists of a left frame body and a right frame body with the same structure, wherein each frame body consists of a front frame, a middle frame and a back frame which all consist of a top beam, a base and hydraulic upright posts; the middle frame is connected with the top beam between the front frame and the back frame and the base between the front frame and the back frame by using a hinged structure; the top beam and the base of the front frame are hinged with each other by using a hydraulic prop; the top beam and the base of the middle frame are hinged with each other by using a front hydraulic prop and a back hydraulic prop, and form a stabilizing mechanism by using a four bar mechanism; the top beam and the base of the back frame are hinged with each other by using a hydraulic prop; and finally, the left frame body and the right frame body are hinged into a whole by a hydraulic jack on the middle frame. The utility model has the advantages that: during advanced gallery supporting, the coal mine underground crossheading forepoling supporting frame is arranged on two sides of a working surface reversed loader to replace the original single prop so as to realize the functions of pushing the reversed loader and an end supporting frame.
Description
Technical field
The utility model relates to coal mine downhole crossheading and uses support apparatus, is specifically related to a kind of advanced support rack of coal mine downhole crossheading.
Background technology
In the coal mine downhole crossheading temporary lining at present, generally adopt individual prop to carry out temporary lining.Because the hydraulic support of individual prop and coal-face is mismatched, so labour intensity is big.
The utility model content
The purpose of the utility model is to propose a kind of advance support rack that is used in combination with the work plane fully-mechanized mining equipment.
A kind of advanced support rack of coal mine downhole crossheading; It by about two identical support bodys of structure form; Each support body is made up of side arm, middle frame and after-frame; Side arm, middle frame and after-frame all are made up of back timber, base and hydraulic vertical prop, and middle frame adopts articulated structure to be connected with back timber and middle frame between forward and backward with base between forward and backward; Wherein the back timber of side arm and base are hinged with a hydraulic prop; The back timber and the base of middle frame adopt forward and backward two hydraulic props hinged, and adopt quadric chain as stabilizing mechanism; The back timber of after-frame and base adopt a hydraulic prop hinged, last about two support bodys be hinged to one by the hydraulic jack on the middle frame.
Temporary lining when making somebody a mere figurehead the top for realizing moving, the back timber of side arm is the extensible canopy structure.
The utility model has the advantages that, when ultra roadway support, the utility model is arranged in work plane elevating conveyor both sides, replace original individual prop, realize passing the function of elevating conveyor and face end support.
Description of drawings
Fig. 1 is the front view of the utility model;
Fig. 2 is the lateral view of Fig. 1.
Label 1 is an extensible canopy in the accompanying drawing, and 2 is front-axle beam, and 3,4 is hydraulic vertical prop, and 5 is central sill, and 6 is quadric chain; 7,8 is hydraulic vertical prop, and 9 is the back rest, and 10 is rear base, and 11 is middle base; 12 is preceding base, and 13 is left half, and 14 is right half, and 15,16 is hydraulic jack.
The specific embodiment
With reference to Fig. 1, like Fig. 2 the utility model is further specified: as seen from the figure, it is made up of side arm, middle frame and after-frame three parts.Be made up of the identical left and right sides two parts of structure for every, as shown in Figure 1 is that left half also is right half, and left and right two parts utilize hydraulic jack 15 to fix with 16 or hinged respectively, constitute a frame integral body.Side arm is by extensible canopy 1, and front-axle beam 2, hydraulic vertical prop 3 and preceding base 12 are formed; Middle frame is made up of central sill 5, quadric chain 6, hydraulic vertical prop 4, hydraulic vertical prop 7 and middle base 11, and after-frame is made up of the back rest 9, hydraulic vertical prop 8 and rear base 10; All adopt articulated structure between every hydraulic vertical prop and the back timber base; In back timber and base between frame and forward and backward all adopt articulated structure.
Claims (2)
1. advanced support rack of coal mine downhole crossheading; It is characterized in that; It is made up of left and right two identical support bodys of structure; Each support body is made up of side arm, middle frame and after-frame, and side arm, middle frame and after-frame all are made up of back timber, base and hydraulic vertical prop, and middle frame adopts articulated structure to be connected with back timber and middle frame between forward and backward with base between forward and backward; Wherein the Xiang Liang of side arm and base are hinged with a hydraulic prop; The back timber and the base of middle frame adopt forward and backward two hydraulic props hinged, and adopt quadric chain as stabilizing mechanism; The back timber of after-frame and base adopt a hydraulic prop hinged, last about two support bodys be hinged to one by the hydraulic jack on the middle frame.
2. advanced support rack of coal mine downhole crossheading as claimed in claim 1 is characterized in that, described side arm back timber is the extensible canopy structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011202738515U CN202215263U (en) | 2011-07-30 | 2011-07-30 | Coal mine underground crossheading forepoling supporting frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011202738515U CN202215263U (en) | 2011-07-30 | 2011-07-30 | Coal mine underground crossheading forepoling supporting frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202215263U true CN202215263U (en) | 2012-05-09 |
Family
ID=46014523
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011202738515U Expired - Fee Related CN202215263U (en) | 2011-07-30 | 2011-07-30 | Coal mine underground crossheading forepoling supporting frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202215263U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103775117A (en) * | 2014-02-18 | 2014-05-07 | 陕西开拓建筑科技有限公司 | Waste-rock-blocking top-cutting mold-hanging gob-side entry retaining hydraulic bracket for mining working face |
CN113217048A (en) * | 2021-06-07 | 2021-08-06 | 四川华蓥山广能集团嘉华机械有限责任公司 | Roadside support bracket group for large-inclination gob-side entry retaining |
-
2011
- 2011-07-30 CN CN2011202738515U patent/CN202215263U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103775117A (en) * | 2014-02-18 | 2014-05-07 | 陕西开拓建筑科技有限公司 | Waste-rock-blocking top-cutting mold-hanging gob-side entry retaining hydraulic bracket for mining working face |
CN103775117B (en) * | 2014-02-18 | 2016-02-10 | 陕西开拓建筑科技有限公司 | Face gear cash is cut top and is hung mould gob side entry retaining hydraulic support |
CN113217048A (en) * | 2021-06-07 | 2021-08-06 | 四川华蓥山广能集团嘉华机械有限责任公司 | Roadside support bracket group for large-inclination gob-side entry retaining |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201460935U (en) | Filling timbering integrated hydraulic support | |
CN205047241U (en) | Tunnel quick travel formula advance support support | |
CN101440711A (en) | Large extraction high caving roof coal hydraulic support | |
CN202047852U (en) | Twin-station two-column low-position top coal caving hydraulic bracket | |
CN103410545A (en) | Hydraulic support capable of realizing top coal caving and filling operation | |
CN201714412U (en) | Hydraulic support for non-solid-filled working face | |
CN203362198U (en) | Track walking type immediate support device of fully-mechanized drivage roadway | |
CN201810325U (en) | Solid filling end bracket | |
CN202215263U (en) | Coal mine underground crossheading forepoling supporting frame | |
CN103362511B (en) | High-dipping medium-thickness seam step is without pillar working | |
CN109779666B (en) | Prevent empting safe formula hydraulic support | |
CN102322281B (en) | Tunnel quick-tunneling advance support integrated device | |
CN203383843U (en) | Thin coal seam filling and coal mining bracket | |
CN101413394A (en) | Advanced support rack of coal mine downhole crossheading | |
CN201460936U (en) | Filling timbering hydraulic support | |
CN103924994A (en) | Self-advancing roof bolter platform | |
CN210068218U (en) | Multipurpose roadway advance support hydraulic support | |
CN201301720Y (en) | Mine underground gate roadway advance shoring supporting frame | |
CN202250135U (en) | Low-position sublevel caving hydraulic support | |
CN202215273U (en) | Front-arranged single oscillating bar type end hydraulic support | |
CN201314238Y (en) | Great mining height hydraulic bracket for top coal caving | |
CN201794601U (en) | Direction-adjustable suspension top beam hydraulic support | |
CN203412607U (en) | Hydraulic support for realizing placing top coal and filling operation | |
CN205135686U (en) | Colliery is light -duty advance support hydraulic support in pit | |
CN202866848U (en) | Top coal caving support capable of preventing extensible beam from offsetting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120509 Termination date: 20130730 |