CN201314238Y - Great mining height hydraulic bracket for top coal caving - Google Patents

Great mining height hydraulic bracket for top coal caving Download PDF

Info

Publication number
CN201314238Y
CN201314238Y CNU2008202270005U CN200820227000U CN201314238Y CN 201314238 Y CN201314238 Y CN 201314238Y CN U2008202270005 U CNU2008202270005 U CN U2008202270005U CN 200820227000 U CN200820227000 U CN 200820227000U CN 201314238 Y CN201314238 Y CN 201314238Y
Authority
CN
China
Prior art keywords
jack
caving
base
mining height
back timber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008202270005U
Other languages
Chinese (zh)
Inventor
蒋卫
王明南
林万令
李景恒
靖大鹏
刘宪亮
冀庆来
王永忠
张智勇
夏竞
李洪军
冯栋
郑伟
吴玉璇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Machinery Factory Of Zaozhuang Coal Mining (group) LLC
Original Assignee
Second Machinery Factory Of Zaozhuang Coal Mining (group) LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Machinery Factory Of Zaozhuang Coal Mining (group) LLC filed Critical Second Machinery Factory Of Zaozhuang Coal Mining (group) LLC
Priority to CNU2008202270005U priority Critical patent/CN201314238Y/en
Application granted granted Critical
Publication of CN201314238Y publication Critical patent/CN201314238Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

A great mining height hydraulic bracket for top coal caving comprises a base, upright posts, a top beam, a front beam, a shield beam, a tail beam and an inserting plate; the top beam is supported on the base through four upright posts, the front beam and the shield beam are hinged with the front end and the rear end of the top beam respectively, a connecting rod is also connected on the shield beam, a telescopic beam is arranged in the front of the front beam, the telescopic beam is connected with the front beam through a jack of the telescopic beam, the front end of the telescopic beam is hinged with the rear part of an upper protection plate, one end of the jack of the upper protection plate is connected with the telescopic beam, and the other end thereof is connected with the tail part of the upper protection plate; the front end of the tail beam is hinged with the shield beam, the other end of the tail beam is connected with the shield beam through the jack of the tail beam, and the inserting plate is positioned inside the tail beam. The great mining height hydraulic bracket for top coal caving has the advantages of great mining height and high working resistance, not only can realize the top coal caving , but also can realize the full mining height once when the coal thickness is 4.5m.

Description

Hydraulic support for large-mining height caving coal
Technical field
The utility model relates to mining support apparatus, relates in particular to a kind of hydraulic support for large-mining height caving coal.
Background technology
The essence of caving coal fully-mechanized mining is to arrange fully-mechanized mining working in the bottom of working seam, except that mining with normal three machines (coal-winning machine, conveyer and hydraulic support), also utilize mine pressure or be aided with artificial loosening method and make crushing voerhead coal on the work plane, and with the advance of the face, and forwardly or the rear emit or reclaim.Caving roof coal hydraulic support is as one of caving coal fully-mechanized mining most important equipment, and its performance and quality directly influence the development of caving coal fully-mechanized mining.Existing work plane low level is put its bottom of a coal hydraulic bracket for base, and back timber is supported by hydraulic vertical prop, and hydraulic support the place ahead is a front-axle beam, and front-axle beam and back timber are hinged and promote its motion by the front-axle beam jack.The rear of hydraulic support is hinged with caving shield, and the hinged tail boom that has plate at the caving shield rear portion by the loosening top of upper and lower swing tail boom coal, realizes putting coal.The sublevel caving hydrau lic support machine mining height degree of this structure is low, and it is too many only to adopt not unrestrained expense coal resources for 4~5m high seam, and the caving coal can cause dirt band, influences Coal Quality.
Summary of the invention
The utility model purpose provides a kind of hydraulic support for large-mining height caving coal, and it can realize the following coal seam of 4.5m full-seam mining, and the longwall top coal caving of 4.5m~10m high seam has been realized the economical rationality exploitation in coal seam preferably.
For achieving the above object, the technical solution adopted in the utility model is: a kind of hydraulic support for large-mining height caving coal, comprise described base, column, back timber, front-axle beam, caving shield, tail boom and plate, back timber is bearing on the base by four root posts, front-axle beam and caving shield are hinged with the rear and front end portion of back timber respectively, also be connected with connecting rod on the caving shield, the other end of connecting rod links to each other with base, the front-axle beam rear end is bearing on the back timber by the front-axle beam jack, it is characterized in that: the place ahead of front-axle beam is an extensible canopy, extensible canopy links to each other with front-axle beam by the extensible canopy jack, the extensible canopy front end is hinged with the rear portion of protecting nation's plate, protect nation's plate jack one end and link to each other with extensible canopy, the other end with protect nation's plate afterbody and link to each other; Tail boom front end and caving shield are hinged, and the tail boom other end links to each other with caving shield by the tail boom jack, and plate is in tail boom inside, and plate is linked to each other with tail boom by the plate jack.
Above-mentioned a kind of hydraulic support for large-mining height caving coal, be characterized in: connecting rod is divided into front rod and back link, and front rod is split type double link, and back link is whole single connecting rod, front rod, back link are hinged with caving shield, base respectively, form quadric chain jointly.
Above-mentioned a kind of hydraulic support for large-mining height caving coal, be characterized in: base is the split type base of rigidity, push rod is positioned at the home record of base, the front end of base is provided with bottom lifting device, be connected with the vertical end jack of lifting, the centre is connected with horizontal passing jack, lifts end jack and pass the jack other end to act on the push rod respectively.One end of push rod links to each other with conveyer by connector, and the other end links to each other with base by passing jack.
Above-mentioned a kind of hydraulic support for large-mining height caving coal is characterized in: back timber has the bilateral activity side guard board, and caving shield also has the bilateral activity side guard board; The thruster jack that side guard board is played traction all is installed on back timber and the caving shield.
Above-mentioned a kind of hydraulic support for large-mining height caving coal is characterized in: a side of hydraulic support for large-mining height caving coal is provided with draws back slide jack, and the accent frame jack of firm effect has been installed between back timber and the back timber.
The utility model advantage is big mining height, high workload resistance, can realizes the caving coal, again can be when the thick 4.5m of coal the hydraulic support of full-seam mining.Big mining height is the abbreviation of big mining height comprehensive mechanized coal mining method, is a kind of coal-mining method with world lead level.The utility model maximum support height reaches 4.7m, and working resistance reaches 7000kN.Effect is the supported face top board, the working space of shielding coal-winning machine, conveyer, make coal-winning machine once adopt face height, and the coal under will being adopted by conveyer transports, respectively by coal cutting, move operations such as frame, pushing and sliding and form work cycle, the realization comprehensive mining machineryization is produced continuously, has the effect of caving coal simultaneously.Its major advantage is presented as:
1, support mining height scope is big.4.5m~10m high seam adopts longwall top coal caving, 3.8m~4.5m high seam is made common hydraulic support and is used full-seam mining;
2, working resistance is big;
When 3, using as sublevel caving hydrau lic support, it is low to put the coal position, puts coal rate of extraction height, and coal dust is little when putting coal;
4, do not put the coal dead angle, handling capacity is big, is difficult for blocking up, and drawing effectiveness is good; Plate can be controlled the coal amount of putting, the cutting coarse coal; Adopt two conveyers to make coal cutting put coal and do not disturb mutually, but parallel operations;
5, the coal machine is stressed little;
6, tail boom can swing up and down, and the coarse coal of inbreak is played fragmentation;
7, compliance is strong, reliability is high, compact conformation, support capacity is big, easy to operate, advancing velocity is fast.
Hydraulic support for large-mining height caving coal described in the utility model especially adapts to thick or super high seam fully-mechanized mining working use in gentle dip.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
The specific embodiment
Embodiment 1
As shown in Figure 1, hydraulic support for large-mining height caving coal described in the utility model, comprise described base 1, column 2, back timber 9, front-axle beam 13 and caving shield 7, tail boom 6 and plate 5, back timber 9 is bearing on the base 1 by four root posts 2, the column setting replaces non retern valve, realize chain control, avoid killing support.Base 1 is the split type base of rigidity, push rod 3 is positioned at the home record of base, the front end of base is provided with bottom lifting device, be connected with the vertical end jack 11 of lifting, bottom lifting device is the critical component that reduces base front end specific pressure, guarantees to move smoothly frame, be connected with horizontal passing jack 15 in the middle of the base, lift end jack 11 and act on respectively on the push rod 3 with passing jack 15 other ends.One end of push rod 3 links to each other with conveyer by connector, and the other end links to each other with base 1 by passing jack 15.Front-axle beam 13 and caving shield 7 are hinged with the rear and front end portion of back timber 9 respectively, front-axle beam 13 other ends are bearing on the back timber by the front-axle beam jack, the place ahead of front-axle beam 13 is an extensible canopy 14, extensible canopy 14 links to each other with front-axle beam 13 by the extensible canopy jack, extensible canopy 14 front ends are with to protect nation's plate 12 rear portions hinged, protect nation's plate jack one end and link to each other with extensible canopy, the other end with protect nation's plate in, the rear portion links to each other; Also be connected with connecting rod 4 on the caving shield 7, connecting rod 4 is divided into front rod and back link, and front rod is split type double link, and back link is whole single connecting rod, and front rod, back link are hinged with caving shield 7, base 1 respectively, form quadric chain jointly.This structure is moved good stability after making the whole center of gravity of support.Tail boom 6 front ends and caving shield are hinged, and the caving shield other end links to each other with caving shield by the tail boom jack, and plate 5 is in tail boom 6 inside, and plate 5 is linked to each other with tail boom 6 by the plate jack.Back timber 9 has bilateral activity side guard board 10, and caving shield 7 also has bilateral activity side guard board 8; The thruster jack that side guard board is played traction all is installed on back timber 9 and the caving shield 7.Hydraulic support one side is provided with draws back slide jack, and the accent frame jack of firm effect has been installed between back timber and the back timber.

Claims (5)

1, a kind of hydraulic support for large-mining height caving coal, comprise described base (1), column (2), back timber (9), front-axle beam (13), caving shield (7), tail boom (6) and plate (5), back timber (9) is bearing on the base (1) by four root posts (2), front-axle beam (13) and caving shield (7) are hinged with the rear and front end portion of back timber (9) respectively, also be connected with connecting rod (4) on the caving shield (7), the other end of connecting rod (4) links to each other with base (1), front-axle beam (13) rear end is bearing on the back timber (9) by the front-axle beam jack, it is characterized in that: the place ahead of front-axle beam (13) is extensible canopy (14), extensible canopy (14) links to each other with front-axle beam (13) by the extensible canopy jack, extensible canopy (14) front end is hinged with the rear portion of protecting nation's plate (12), protect nation's plate jack one end and link to each other with extensible canopy, the other end with protect nation's plate afterbody and link to each other; Tail boom (6) front end and caving shield are hinged, and tail boom (6) other end links to each other with caving shield (7) by the tail boom jack, and plate (5) is in tail boom (6) inside, and plate (5) is linked to each other with tail boom (6) by the plate jack.
2, a kind of hydraulic support for large-mining height caving coal according to claim 1, it is characterized in that: connecting rod 4 is divided into front rod and back link, front rod is split type double link, back link is whole single connecting rod, front rod, back link are hinged with caving shield (7), base (1) respectively, form quadric chain jointly.
3, a kind of hydraulic support for large-mining height caving coal according to claim 1 and 2, it is characterized in that: base (1) is the split type base of rigidity, push rod (3) is positioned at the inboard of base, the front end of base is provided with bottom lifting device, the vertical end jack (11) of lifting is housed, the centre is connected with horizontal passing jack (15), lift end jack (11) and pass jack (15) other end and act on the push rod (3), one end of push rod (3) links to each other with conveyer by connector, and the other end links to each other with base (1) by passing jack (15).
4, a kind of hydraulic support for large-mining height caving coal according to claim 3 is characterized in that: back timber (9) has bilateral activity side guard board (10), and caving shield (7) also has bilateral activity side guard board (8); On back timber (9) and the caving shield (7) the thruster jack that side guard board is played traction is installed all.
5, a kind of hydraulic support for large-mining height caving coal according to claim 4 is characterized in that: a side of hydraulic support for large-mining height caving coal is provided with draws back slide jack, and the accent frame jack of firm effect has been installed between back timber and the back timber; Column (2) is provided with alternately non retern valve.
CNU2008202270005U 2008-12-11 2008-12-11 Great mining height hydraulic bracket for top coal caving Expired - Fee Related CN201314238Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008202270005U CN201314238Y (en) 2008-12-11 2008-12-11 Great mining height hydraulic bracket for top coal caving

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008202270005U CN201314238Y (en) 2008-12-11 2008-12-11 Great mining height hydraulic bracket for top coal caving

Publications (1)

Publication Number Publication Date
CN201314238Y true CN201314238Y (en) 2009-09-23

Family

ID=41126031

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008202270005U Expired - Fee Related CN201314238Y (en) 2008-12-11 2008-12-11 Great mining height hydraulic bracket for top coal caving

Country Status (1)

Country Link
CN (1) CN201314238Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102042024A (en) * 2010-11-13 2011-05-04 枣庄矿业(集团)有限责任公司第二机械厂 Advance support bracket for sliding top beam
CN105443152A (en) * 2015-12-21 2016-03-30 枣庄矿业集团高庄煤业有限公司 Light shielding frame for removing working face
CN106382126A (en) * 2016-11-15 2017-02-08 徐州工程学院 Support hydraulic device in high-flexibility mortar working face construction and working method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102042024A (en) * 2010-11-13 2011-05-04 枣庄矿业(集团)有限责任公司第二机械厂 Advance support bracket for sliding top beam
CN102042024B (en) * 2010-11-13 2012-11-07 枣庄矿业(集团)有限责任公司第二机械厂 Advanced support bracket for sliding top beam
CN105443152A (en) * 2015-12-21 2016-03-30 枣庄矿业集团高庄煤业有限公司 Light shielding frame for removing working face
CN106382126A (en) * 2016-11-15 2017-02-08 徐州工程学院 Support hydraulic device in high-flexibility mortar working face construction and working method thereof

Similar Documents

Publication Publication Date Title
CN101440711A (en) Large extraction high caving roof coal hydraulic support
CN200952403Y (en) Coal mine working face crossheading leading supporting hydraulic prop
CN101463729A (en) Hydraulic support for large-mining height caving coal
CN101105135A (en) Two column protected type hydraulic prop frame for low position blasting down the roof coal
CN101592035A (en) Big mining height shield type low caving coal hydraulic support
CN100371559C (en) Hydraulic supporter for end of widening working face
CN202047852U (en) Twin-station two-column low-position top coal caving hydraulic bracket
CN202391442U (en) Two-column shield type hydraulic support for filling and mining
CN201314238Y (en) Great mining height hydraulic bracket for top coal caving
CN202325590U (en) Filling hydraulic support frame for backfill of coal mine
CN203362199U (en) End-head hydraulic support for fully mechanized mining face
CN201391324Y (en) Comprehensive mining hydraulic support of complete top plate of light type thin coal seam
CN102373937B (en) Rhombic hydraulic support for pseudo-inclined down mining working surface of steep coal seam
CN102251790A (en) Mining and filling integrated hydraulic support enabling double top beams to be coaxially hinged with four connecting rods
CN210599053U (en) Two-frame one-set middle-placed type caving coal end support
CN201314239Y (en) End support for roadway caving
CN102003198A (en) Hydraulic support without tail beam
CN203383843U (en) Thin coal seam filling and coal mining bracket
CN201391321Y (en) Large-dig-angle low-level caving hydraulic support
CN102900450A (en) Caving coal hydraulic support with large swing beam structure
CN202914115U (en) Large dip angle lapping hydraulic support frame
CN201568067U (en) Integrated fully mechanized top-coal caving face end support frame
CN202181910U (en) Mining and filling integrated hydraulic support frame with double top beam and four-connecting rod coaxially-hinged
CN213116362U (en) Steep roadside hydraulic support group
CN2128308Y (en) Caving or network laying hydraulic chock

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090923

Termination date: 20100111