CN202194365U - Hydraulic self-climbing type discharging platform - Google Patents
Hydraulic self-climbing type discharging platform Download PDFInfo
- Publication number
- CN202194365U CN202194365U CN2011202708581U CN201120270858U CN202194365U CN 202194365 U CN202194365 U CN 202194365U CN 2011202708581 U CN2011202708581 U CN 2011202708581U CN 201120270858 U CN201120270858 U CN 201120270858U CN 202194365 U CN202194365 U CN 202194365U
- Authority
- CN
- China
- Prior art keywords
- discharging
- platform
- hydraulic
- main platform
- climbing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model provides a hydraulic self-climbing type discharging platform, which comprises a discharging main platform connected with building members, and edge-adjacent guardrails arranged on the two lateral edges and the outboard edges of the discharging main platform. The building members comprise preembedded right-angle-type embedded pieces and preembedded rings. The inner side edges of the discharging main platform are in a cooperation connection with a hydraulic climbing frame. The hydraulic climbing frame is in a cooperation connection with the right-angle-type embedded piece. A quick adjusting arranged between the discharging main platform and the hydraulic climbing frame is also connected with the discharging main platform and the hydraulic climbing frame. The upper end of the quick adjusting screw is hinged to the hydraulic climbing frame and the lower end of the quick adjusting screw is hinged to the discharging main platform. A safety wire rope arranged between the discharging main platform and the preembedded rings is connected with the discharging main platform and the preembedded rings. The discharging platform can be climbed up along the structure of a building, so that the number of discharging platforms at a construction site is reduced. The utilization efficiency of discharging platforms is also improved. Meanwhile, since the number of discharging platforms at a construction site is reduced, a large amount of time and manpower is saved for a project. The construction cost is reduced.
Description
Technical field
The utility model relates to the discharging platform that is used for the circulation material allocation and transportation in the building operations.
Background technology
At present, in building construction process, traditional discharging platform has following some shortcoming.1,, needs to drop into very many installation personnels, so construction cost is too high because the input quantity of discharging platform is many.2, discharging platform installation in position difficulty is big and length consuming time is installed, and can take big machinery long time such as tower crane when mounted.3, discharging platform has inconvenient operation and the big shortcoming of safety guarantee difficulty in lifting and use.
The utility model content
The purpose of the utility model provides a kind of hydraulic pressure self-climbing discharging platform, solve the too high technical problem of discharging platform construction cost; And it is big and the problem of length consuming time is installed to solve discharging platform installation in position difficulty; Also to solve discharging platform inconvenient operation and the big problem of safety guarantee difficulty.
For realizing above-mentioned purpose; The utility model adopts following technical scheme: a kind of hydraulic pressure self-climbing discharging platform; Comprise and face the frontier defense guardrail on the discharging master platform that is connected on the building member and dual-side that is arranged on discharging master platform and the outer side edges; It is characterized in that: be embedded with perpendicular type built-in fitting and pre-buried ring in the said building member, the inner side edge and the hydraulic climbing scaffold of said discharging master platform are connected, and hydraulic climbing scaffold is connected with the perpendicular type built-in fitting again; Also be connected with the quick adjustment leading screw between discharging master platform and the hydraulic climbing scaffold, wherein the upper end of quick adjustment leading screw and hydraulic climbing scaffold are articulated and connected, and the lower end of quick adjustment leading screw and discharging master platform are articulated and connected; Be connected with insurance steel cable between discharging master platform and the pre-buried ring.
Said building member is frame column, floor or cylindrical shell.
The hinged inside of said discharging master platform is connected with collapsible middle part turnover panel, and this collapsible middle part turnover panel is taken and is placed on the building member.
Said the facing on the frontier defense guardrail of both sides that is positioned at main platform has been welded to connect steel hoop, slidely connects the telescopic protective guard that can extend on the building member in the steel hoop again.
Compared with prior art the utlity model has following characteristics and beneficial effect: the utility model has utilized the principle of climbing of ripe hydraulic climbing scaffold; Can on fabric structure, climb; So reduced the input quantity of the discharging platform of job site, improve the utilization ratio of discharging platform, and since the input quantity of the discharging platform of job site reduced; Institute thinks that project practiced thrift great amount of time and manpower, has reduced construction construction cost.In addition; Owing to utilized the principle of climbing of ripe hydraulic climbing scaffold; Also utilize the quick adjustment leading screw fast with discharging master platform erection simultaneously; So operation is very easy for the utility model, can accomplish the turnover and the installation in position of discharging master platform efficiently, reduced the service time of the big machinery such as input and tower crane of installation personnel.
The practical application effect highly significant of the utility model; Can accomplish agent structure and each item work in finishing stage smoothly; Wherein telescopic protective guard can form the monolithic protection system fast with the frontier defense guardrail that faces of periphery, and collapsible middle part turnover panel can seal the slit between discharging master platform and the building member rapidly, prevents that material from falling; These 2 safeties that improvement has all improved discharging platform, the safety of assurance personnel operation.In addition, described perpendicular type built-in fitting can use on multiple structures such as frame column, floor, cylindrical shell, so enlarged the scope of application of the utility model.
Description of drawings
Below in conjunction with accompanying drawing the utility model is done further detailed explanation.
Fig. 1 is the schematic perspective view of the utility model.
Fig. 2 is the enlarged diagram at I place among Fig. 1.
Fig. 3 is that the master of perpendicular type built-in fitting looks sketch map.
Fig. 4 is the elevational schematic view of Fig. 2.
Fig. 5 is the sketch map that discharging master platform is connected with the quick adjustment leading screw.
Fig. 6 is the enlarged diagram at II place among Fig. 5.
Fig. 7 is that discharging master platform is looked sketch map with the master that collapsible middle part turnover panel is connected.
Fig. 8 is the schematic top plan view of Fig. 7.
Fig. 9 is the process of the climbing sketch map of the utility model.
Reference numeral: 1-perpendicular type built-in fitting, 2-quick adjustment leading screw, 3-face frontier defense guardrail, the collapsible middle part of 4-turnover panel, 5-hydraulic climbing scaffold, 6-discharging master platform, the pre-buried ring of 7-, 8-insurance steel cable, 9-building member, 10-steel hoop, the telescopic protective guard of 11-.
The specific embodiment
Embodiment is referring to shown in Figure 1; This hydraulic pressure self-climbing discharging platform; Comprise and face frontier defense guardrail 3 on the discharging master platform that is connected on the building member 96 and dual-side that is arranged on discharging master platform 6 and the outer side edges; Said building member 9 is frame column, floor or cylindrical shell, is floor in the present embodiment.
Referring to Fig. 1, Fig. 3, Fig. 4; Be embedded with perpendicular type built-in fitting 1 and pre-buried ring 7 in the said building member 9; The inner side edge and the hydraulic climbing scaffold 5 of said discharging master platform 6 are connected; Hydraulic climbing scaffold 5 is connected with perpendicular type built-in fitting 1 again, is connected with insurance steel cable 8 between discharging master platform 6 and the pre-buried ring 7.
Referring to Fig. 1, Fig. 5, Fig. 6, also be connected with quick adjustment leading screw 2 between discharging master platform 6 and the hydraulic climbing scaffold 5, wherein the upper end of quick adjustment leading screw 2 and hydraulic climbing scaffold 5 are articulated and connected, and the lower end of quick adjustment leading screw 2 and discharging master platform 6 are articulated and connected.
Referring to Fig. 1, Fig. 7, Fig. 8, the hinged inside of said discharging master platform 6 is connected with collapsible middle part turnover panel 4, and this collapsible middle part turnover panel 4 is taken and is placed on the building member 9.
Referring to Fig. 1, Fig. 2, said the facing of both sides that is positioned at main platform 6 has been welded to connect steel hoop 10 on the frontier defense guardrail 3, slidely connect the telescopic protective guard 11 that can extend on the building member 9 in the steel hoop 10 again.
The installation first of the utility model: during structure construction, perpendicular type built-in fitting 1,7 installations of pre-buried ring are accomplished, regained telescopic protective guard; Erect collapsible middle part turnover panel 4, discharging master platform 6 is sling, hydraulic climbing scaffold 5 is installed and is fixed with angle type built-in fitting with tower crane; Utilize tower crane that platform is preliminary fastening in place, utilize the quick adjustment leading screw with platform erection, the installation insurance wire rope; Pull out telescopic protective guard, realize and the handing-over that frontier defense is protected of facing of periphery, form the monolithic protection system; Set level collapsible middle part turnover panel, the slit between closed platform and the building.
Referring to Fig. 1, Fig. 9, the use of the utility model: need before the automatic climbing perpendicular type built-in fitting 1,7 installations of pre-buried ring to be accomplished, regain telescopic protective guard at the predetermined structure position; Erect collapsible middle part turnover panel 4, unload insurance steel cable 8, utilize the principle of climbing of hydraulic climbing scaffold 5 then; Make discharging master platform 6 rise to the precalculated position, install, regulate insurance steel cable 8 fastening putting in place again, pull out telescopic protective guard along hydraulic climbing scaffold; Realize the handing-over that frontier defense is protected of facing with periphery; Form the monolithic protection system, set level collapsible middle part turnover panel, the slit between closed platform and the building.
Claims (4)
1. hydraulic pressure self-climbing discharging platform; Comprise and face frontier defense guardrail (3) on the discharging master platform (6) that is connected on the building member (9) and dual-side that is arranged on discharging master platform (6) and the outer side edges; It is characterized in that: be embedded with perpendicular type built-in fitting (1) and pre-buried ring (7) in the said building member (9); The inner side edge of said discharging master platform (6) and hydraulic climbing scaffold (5) are connected, and hydraulic climbing scaffold (5) is connected with perpendicular type built-in fitting (1) again; Also be connected with quick adjustment leading screw (2) between discharging master platform (6) and the hydraulic climbing scaffold (5); Wherein the upper end of quick adjustment leading screw (2) and hydraulic climbing scaffold (5) are articulated and connected, and the lower end of quick adjustment leading screw (2) and discharging master platform (6) are articulated and connected; Be connected with insurance steel cable (8) between discharging master platform (6) and the pre-buried ring (7).
2. hydraulic pressure self-climbing discharging platform according to claim 1 is characterized in that: said building member (9) is frame column, floor or cylindrical shell.
3. hydraulic pressure self-climbing discharging platform according to claim 1 and 2; It is characterized in that: the hinged inside of said discharging master platform (6) is connected with collapsible middle part turnover panel (4), and this collapsible middle part turnover panel (4) is taken and is placed on the building member (9).
4. hydraulic pressure self-climbing discharging platform according to claim 1 and 2; It is characterized in that: said the facing of both sides that is positioned at main platform (6) has been welded to connect steel hoop (10) on the frontier defense guardrail (3), slidely connect the telescopic protective guard (11) that can extend on the building member (9) in the steel hoop (10) again.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011202708581U CN202194365U (en) | 2011-07-28 | 2011-07-28 | Hydraulic self-climbing type discharging platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011202708581U CN202194365U (en) | 2011-07-28 | 2011-07-28 | Hydraulic self-climbing type discharging platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202194365U true CN202194365U (en) | 2012-04-18 |
Family
ID=45949282
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011202708581U Expired - Lifetime CN202194365U (en) | 2011-07-28 | 2011-07-28 | Hydraulic self-climbing type discharging platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202194365U (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102704664A (en) * | 2012-05-30 | 2012-10-03 | 深圳市特辰科技股份有限公司 | Self-lifting quick transferring platform |
CN103466518A (en) * | 2013-08-15 | 2013-12-25 | 中建钢构有限公司 | Steel structure construction platform and large gradient self-climbing system and telescopic platform system thereof |
CN104060812A (en) * | 2014-07-03 | 2014-09-24 | 武汉天蝎建筑装备有限公司 | Conveyance type automatically climbing material platform |
CN104234402A (en) * | 2014-07-18 | 2014-12-24 | 武汉天蝎建筑装备有限公司 | Openable/closeable suspension bridge frame |
CN106088569A (en) * | 2016-08-12 | 2016-11-09 | 天力博达科技有限公司 | Collapsible material platform on construction scaffold |
CN106927344A (en) * | 2017-04-19 | 2017-07-07 | 中建四局第三建筑工程有限公司 | Turnover plate type elevator door and preparation method thereof |
CN108612298A (en) * | 2018-06-07 | 2018-10-02 | 重庆工业职业技术学院 | A kind of building outside climbing type CONSTRUCTION OPERATIONS platform |
CN108678355A (en) * | 2018-05-24 | 2018-10-19 | 中交第二航务工程局有限公司 | The changeable alien invasion of high-rise building once climbs outrigger system |
CN109339430A (en) * | 2018-09-27 | 2019-02-15 | 鼎宸建设管理有限公司 | A kind of climbing frame reverses safeguard construction to external extension |
CN111663788A (en) * | 2020-06-16 | 2020-09-15 | 北京欧斯度科技有限公司 | Platform of unloading convenient to accomodate |
-
2011
- 2011-07-28 CN CN2011202708581U patent/CN202194365U/en not_active Expired - Lifetime
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102704664A (en) * | 2012-05-30 | 2012-10-03 | 深圳市特辰科技股份有限公司 | Self-lifting quick transferring platform |
CN103466518A (en) * | 2013-08-15 | 2013-12-25 | 中建钢构有限公司 | Steel structure construction platform and large gradient self-climbing system and telescopic platform system thereof |
CN103466518B (en) * | 2013-08-15 | 2016-02-17 | 中建钢构有限公司 | Construction of Steel Structure platform and large gradient thereof are from climbing system and retractable platform system |
CN104060812A (en) * | 2014-07-03 | 2014-09-24 | 武汉天蝎建筑装备有限公司 | Conveyance type automatically climbing material platform |
CN104060812B (en) * | 2014-07-03 | 2016-05-25 | 武汉天蝎建筑装备有限公司 | Transport formula automatic climbing material platform |
CN104234402A (en) * | 2014-07-18 | 2014-12-24 | 武汉天蝎建筑装备有限公司 | Openable/closeable suspension bridge frame |
CN106088569A (en) * | 2016-08-12 | 2016-11-09 | 天力博达科技有限公司 | Collapsible material platform on construction scaffold |
CN106927344A (en) * | 2017-04-19 | 2017-07-07 | 中建四局第三建筑工程有限公司 | Turnover plate type elevator door and preparation method thereof |
CN108678355A (en) * | 2018-05-24 | 2018-10-19 | 中交第二航务工程局有限公司 | The changeable alien invasion of high-rise building once climbs outrigger system |
CN108678355B (en) * | 2018-05-24 | 2023-05-26 | 中交第二航务工程局有限公司 | Multi-change outer elevation one-step climbing outer frame system of super high-rise building |
CN108612298A (en) * | 2018-06-07 | 2018-10-02 | 重庆工业职业技术学院 | A kind of building outside climbing type CONSTRUCTION OPERATIONS platform |
CN109339430A (en) * | 2018-09-27 | 2019-02-15 | 鼎宸建设管理有限公司 | A kind of climbing frame reverses safeguard construction to external extension |
CN111663788A (en) * | 2020-06-16 | 2020-09-15 | 北京欧斯度科技有限公司 | Platform of unloading convenient to accomodate |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202194365U (en) | Hydraulic self-climbing type discharging platform | |
CN207144449U (en) | A kind of hoistway operation platform | |
CN102337782B (en) | Lift system for constructing truss platform on top of tall and large space | |
CN202450762U (en) | Construction lifting platform | |
CN103967263B (en) | Hydraulic automatic jumping discharging platform | |
CN203173644U (en) | Multifunctional lifting shaft working platform system | |
CN202785351U (en) | Tower cranes attached operating platform | |
CN207728025U (en) | A kind of safety climbing ladder for bridge construction | |
CN203947758U (en) | Novel hydraulic automatic climbing discharging platform | |
CN213015280U (en) | Movable material loading platform | |
CN107795133B (en) | Integral protective frame platform and construction method thereof | |
CN209011528U (en) | A kind of all steel attachment type raise scaffold | |
CN110552495A (en) | assembled building combined tool type outer protective frame system and construction method thereof | |
CN202208696U (en) | Construction platform used for dry quenching furnace | |
CN205935746U (en) | Simple and easy terraced barreled is put | |
CN205617771U (en) | Construction operation platform and pipe -line transportation integrated device in high residential building elevartor shaft | |
CN210655915U (en) | Connecting device for climbing frame and tower crane | |
CN210563531U (en) | Steel structure support for building protection | |
CN211286808U (en) | Dry powder mortar stirring station protection canopy | |
CN112392245A (en) | Assembly type cantilever I-shaped steel beam operation device capable of being turned over without wall penetration and operation method thereof | |
CN209482687U (en) | A kind of Super High exterior frame column construction operation platform | |
CN104947925A (en) | Elevator shaft protecting operation platform | |
CN202672694U (en) | Shaft construction circulation operating platform | |
CN105735663A (en) | Prefabricated assembled building skirt type protecting net and mounting method | |
CN202745354U (en) | Toolized discharging steel platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20120418 |
|
CX01 | Expiry of patent term |