CN202194365U - Hydraulic self-climbing type discharging platform - Google Patents

Hydraulic self-climbing type discharging platform Download PDF

Info

Publication number
CN202194365U
CN202194365U CN2011202708581U CN201120270858U CN202194365U CN 202194365 U CN202194365 U CN 202194365U CN 2011202708581 U CN2011202708581 U CN 2011202708581U CN 201120270858 U CN201120270858 U CN 201120270858U CN 202194365 U CN202194365 U CN 202194365U
Authority
CN
China
Prior art keywords
discharging
platform
building
hydraulic
climbing
Prior art date
Application number
CN2011202708581U
Other languages
Chinese (zh)
Inventor
杨晓毅
高俊峰
侯本才
王瑞堂
袁梅
张涛
肖遥
王鹏龙
李丽娜
傅释莹
魏健
徐萍
赵静
肖文凤
Original Assignee
中建一局集团建设发展有限公司
中国建筑股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中建一局集团建设发展有限公司, 中国建筑股份有限公司 filed Critical 中建一局集团建设发展有限公司
Priority to CN2011202708581U priority Critical patent/CN202194365U/en
Application granted granted Critical
Publication of CN202194365U publication Critical patent/CN202194365U/en

Links

Abstract

The utility model provides a hydraulic self-climbing type discharging platform, which comprises a discharging main platform connected with building members, and edge-adjacent guardrails arranged on the two lateral edges and the outboard edges of the discharging main platform. The building members comprise preembedded right-angle-type embedded pieces and preembedded rings. The inner side edges of the discharging main platform are in a cooperation connection with a hydraulic climbing frame. The hydraulic climbing frame is in a cooperation connection with the right-angle-type embedded piece. A quick adjusting arranged between the discharging main platform and the hydraulic climbing frame is also connected with the discharging main platform and the hydraulic climbing frame. The upper end of the quick adjusting screw is hinged to the hydraulic climbing frame and the lower end of the quick adjusting screw is hinged to the discharging main platform. A safety wire rope arranged between the discharging main platform and the preembedded rings is connected with the discharging main platform and the preembedded rings. The discharging platform can be climbed up along the structure of a building, so that the number of discharging platforms at a construction site is reduced. The utilization efficiency of discharging platforms is also improved. Meanwhile, since the number of discharging platforms at a construction site is reduced, a large amount of time and manpower is saved for a project. The construction cost is reduced.

Description

Hydraulic pressure self-climbing discharging platform

Technical field

The utility model relates to the discharging platform that is used for the circulation material allocation and transportation in the building operations.

Background technology

At present, in building construction process, traditional discharging platform has following some shortcoming.1,, needs to drop into very many installation personnels, so construction cost is too high because the input quantity of discharging platform is many.2, discharging platform installation in position difficulty is big and length consuming time is installed, and can take big machinery long time such as tower crane when mounted.3, discharging platform has inconvenient operation and the big shortcoming of safety guarantee difficulty in lifting and use.

The utility model content

The purpose of the utility model provides a kind of hydraulic pressure self-climbing discharging platform, solve the too high technical problem of discharging platform construction cost; And it is big and the problem of length consuming time is installed to solve discharging platform installation in position difficulty; Also to solve discharging platform inconvenient operation and the big problem of safety guarantee difficulty.

For realizing above-mentioned purpose; The utility model adopts following technical scheme: a kind of hydraulic pressure self-climbing discharging platform; Comprise and face the frontier defense guardrail on the discharging master platform that is connected on the building member and dual-side that is arranged on discharging master platform and the outer side edges; It is characterized in that: be embedded with perpendicular type built-in fitting and pre-buried ring in the said building member, the inner side edge and the hydraulic climbing scaffold of said discharging master platform are connected, and hydraulic climbing scaffold is connected with the perpendicular type built-in fitting again; Also be connected with the quick adjustment leading screw between discharging master platform and the hydraulic climbing scaffold, wherein the upper end of quick adjustment leading screw and hydraulic climbing scaffold are articulated and connected, and the lower end of quick adjustment leading screw and discharging master platform are articulated and connected; Be connected with insurance steel cable between discharging master platform and the pre-buried ring.

Said building member is frame column, floor or cylindrical shell.

The hinged inside of said discharging master platform is connected with collapsible middle part turnover panel, and this collapsible middle part turnover panel is taken and is placed on the building member.

Said the facing on the frontier defense guardrail of both sides that is positioned at main platform has been welded to connect steel hoop, slidely connects the telescopic protective guard that can extend on the building member in the steel hoop again.

Compared with prior art the utlity model has following characteristics and beneficial effect: the utility model has utilized the principle of climbing of ripe hydraulic climbing scaffold; Can on fabric structure, climb; So reduced the input quantity of the discharging platform of job site, improve the utilization ratio of discharging platform, and since the input quantity of the discharging platform of job site reduced; Institute thinks that project practiced thrift great amount of time and manpower, has reduced construction construction cost.In addition; Owing to utilized the principle of climbing of ripe hydraulic climbing scaffold; Also utilize the quick adjustment leading screw fast with discharging master platform erection simultaneously; So operation is very easy for the utility model, can accomplish the turnover and the installation in position of discharging master platform efficiently, reduced the service time of the big machinery such as input and tower crane of installation personnel.

The practical application effect highly significant of the utility model; Can accomplish agent structure and each item work in finishing stage smoothly; Wherein telescopic protective guard can form the monolithic protection system fast with the frontier defense guardrail that faces of periphery, and collapsible middle part turnover panel can seal the slit between discharging master platform and the building member rapidly, prevents that material from falling; These 2 safeties that improvement has all improved discharging platform, the safety of assurance personnel operation.In addition, described perpendicular type built-in fitting can use on multiple structures such as frame column, floor, cylindrical shell, so enlarged the scope of application of the utility model.

Description of drawings

Below in conjunction with accompanying drawing the utility model is done further detailed explanation.

Fig. 1 is the schematic perspective view of the utility model.

Fig. 2 is the enlarged diagram at I place among Fig. 1.

Fig. 3 is that the master of perpendicular type built-in fitting looks sketch map.

Fig. 4 is the elevational schematic view of Fig. 2.

Fig. 5 is the sketch map that discharging master platform is connected with the quick adjustment leading screw.

Fig. 6 is the enlarged diagram at II place among Fig. 5.

Fig. 7 is that discharging master platform is looked sketch map with the master that collapsible middle part turnover panel is connected.

Fig. 8 is the schematic top plan view of Fig. 7.

Fig. 9 is the process of the climbing sketch map of the utility model.

Reference numeral: 1-perpendicular type built-in fitting, 2-quick adjustment leading screw, 3-face frontier defense guardrail, the collapsible middle part of 4-turnover panel, 5-hydraulic climbing scaffold, 6-discharging master platform, the pre-buried ring of 7-, 8-insurance steel cable, 9-building member, 10-steel hoop, the telescopic protective guard of 11-.

The specific embodiment

Embodiment is referring to shown in Figure 1; This hydraulic pressure self-climbing discharging platform; Comprise and face frontier defense guardrail 3 on the discharging master platform that is connected on the building member 96 and dual-side that is arranged on discharging master platform 6 and the outer side edges; Said building member 9 is frame column, floor or cylindrical shell, is floor in the present embodiment.

Referring to Fig. 1, Fig. 3, Fig. 4; Be embedded with perpendicular type built-in fitting 1 and pre-buried ring 7 in the said building member 9; The inner side edge and the hydraulic climbing scaffold 5 of said discharging master platform 6 are connected; Hydraulic climbing scaffold 5 is connected with perpendicular type built-in fitting 1 again, is connected with insurance steel cable 8 between discharging master platform 6 and the pre-buried ring 7.

Referring to Fig. 1, Fig. 5, Fig. 6, also be connected with quick adjustment leading screw 2 between discharging master platform 6 and the hydraulic climbing scaffold 5, wherein the upper end of quick adjustment leading screw 2 and hydraulic climbing scaffold 5 are articulated and connected, and the lower end of quick adjustment leading screw 2 and discharging master platform 6 are articulated and connected.

Referring to Fig. 1, Fig. 7, Fig. 8, the hinged inside of said discharging master platform 6 is connected with collapsible middle part turnover panel 4, and this collapsible middle part turnover panel 4 is taken and is placed on the building member 9.

Referring to Fig. 1, Fig. 2, said the facing of both sides that is positioned at main platform 6 has been welded to connect steel hoop 10 on the frontier defense guardrail 3, slidely connect the telescopic protective guard 11 that can extend on the building member 9 in the steel hoop 10 again.

The installation first of the utility model: during structure construction, perpendicular type built-in fitting 1,7 installations of pre-buried ring are accomplished, regained telescopic protective guard; Erect collapsible middle part turnover panel 4, discharging master platform 6 is sling, hydraulic climbing scaffold 5 is installed and is fixed with angle type built-in fitting with tower crane; Utilize tower crane that platform is preliminary fastening in place, utilize the quick adjustment leading screw with platform erection, the installation insurance wire rope; Pull out telescopic protective guard, realize and the handing-over that frontier defense is protected of facing of periphery, form the monolithic protection system; Set level collapsible middle part turnover panel, the slit between closed platform and the building.

Referring to Fig. 1, Fig. 9, the use of the utility model: need before the automatic climbing perpendicular type built-in fitting 1,7 installations of pre-buried ring to be accomplished, regain telescopic protective guard at the predetermined structure position; Erect collapsible middle part turnover panel 4, unload insurance steel cable 8, utilize the principle of climbing of hydraulic climbing scaffold 5 then; Make discharging master platform 6 rise to the precalculated position, install, regulate insurance steel cable 8 fastening putting in place again, pull out telescopic protective guard along hydraulic climbing scaffold; Realize the handing-over that frontier defense is protected of facing with periphery; Form the monolithic protection system, set level collapsible middle part turnover panel, the slit between closed platform and the building.

Claims (4)

1. hydraulic pressure self-climbing discharging platform; Comprise and face frontier defense guardrail (3) on the discharging master platform (6) that is connected on the building member (9) and dual-side that is arranged on discharging master platform (6) and the outer side edges; It is characterized in that: be embedded with perpendicular type built-in fitting (1) and pre-buried ring (7) in the said building member (9); The inner side edge of said discharging master platform (6) and hydraulic climbing scaffold (5) are connected, and hydraulic climbing scaffold (5) is connected with perpendicular type built-in fitting (1) again; Also be connected with quick adjustment leading screw (2) between discharging master platform (6) and the hydraulic climbing scaffold (5); Wherein the upper end of quick adjustment leading screw (2) and hydraulic climbing scaffold (5) are articulated and connected, and the lower end of quick adjustment leading screw (2) and discharging master platform (6) are articulated and connected; Be connected with insurance steel cable (8) between discharging master platform (6) and the pre-buried ring (7).
2. hydraulic pressure self-climbing discharging platform according to claim 1 is characterized in that: said building member (9) is frame column, floor or cylindrical shell.
3. hydraulic pressure self-climbing discharging platform according to claim 1 and 2; It is characterized in that: the hinged inside of said discharging master platform (6) is connected with collapsible middle part turnover panel (4), and this collapsible middle part turnover panel (4) is taken and is placed on the building member (9).
4. hydraulic pressure self-climbing discharging platform according to claim 1 and 2; It is characterized in that: said the facing of both sides that is positioned at main platform (6) has been welded to connect steel hoop (10) on the frontier defense guardrail (3), slidely connect the telescopic protective guard (11) that can extend on the building member (9) in the steel hoop (10) again.
CN2011202708581U 2011-07-28 2011-07-28 Hydraulic self-climbing type discharging platform CN202194365U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202708581U CN202194365U (en) 2011-07-28 2011-07-28 Hydraulic self-climbing type discharging platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202708581U CN202194365U (en) 2011-07-28 2011-07-28 Hydraulic self-climbing type discharging platform

Publications (1)

Publication Number Publication Date
CN202194365U true CN202194365U (en) 2012-04-18

Family

ID=45949282

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202708581U CN202194365U (en) 2011-07-28 2011-07-28 Hydraulic self-climbing type discharging platform

Country Status (1)

Country Link
CN (1) CN202194365U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704664A (en) * 2012-05-30 2012-10-03 深圳市特辰科技股份有限公司 Self-lifting quick transferring platform
CN103466518A (en) * 2013-08-15 2013-12-25 中建钢构有限公司 Steel structure construction platform and large gradient self-climbing system and telescopic platform system thereof
CN104060812A (en) * 2014-07-03 2014-09-24 武汉天蝎建筑装备有限公司 Conveyance type automatically climbing material platform
CN104234402A (en) * 2014-07-18 2014-12-24 武汉天蝎建筑装备有限公司 Openable/closeable suspension bridge frame
CN106088569A (en) * 2016-08-12 2016-11-09 天力博达科技有限公司 Collapsible material platform on construction scaffold
CN106927344A (en) * 2017-04-19 2017-07-07 中建四局第三建筑工程有限公司 Turnover plate type elevator door and preparation method thereof
CN108612298A (en) * 2018-06-07 2018-10-02 重庆工业职业技术学院 A kind of building outside climbing type CONSTRUCTION OPERATIONS platform
CN109339430A (en) * 2018-09-27 2019-02-15 鼎宸建设管理有限公司 A kind of climbing frame reverses safeguard construction to external extension

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704664A (en) * 2012-05-30 2012-10-03 深圳市特辰科技股份有限公司 Self-lifting quick transferring platform
CN103466518A (en) * 2013-08-15 2013-12-25 中建钢构有限公司 Steel structure construction platform and large gradient self-climbing system and telescopic platform system thereof
CN103466518B (en) * 2013-08-15 2016-02-17 中建钢构有限公司 Construction of Steel Structure platform and large gradient thereof are from climbing system and retractable platform system
CN104060812A (en) * 2014-07-03 2014-09-24 武汉天蝎建筑装备有限公司 Conveyance type automatically climbing material platform
CN104060812B (en) * 2014-07-03 2016-05-25 武汉天蝎建筑装备有限公司 Transport formula automatic climbing material platform
CN104234402A (en) * 2014-07-18 2014-12-24 武汉天蝎建筑装备有限公司 Openable/closeable suspension bridge frame
CN106088569A (en) * 2016-08-12 2016-11-09 天力博达科技有限公司 Collapsible material platform on construction scaffold
CN106927344A (en) * 2017-04-19 2017-07-07 中建四局第三建筑工程有限公司 Turnover plate type elevator door and preparation method thereof
CN108612298A (en) * 2018-06-07 2018-10-02 重庆工业职业技术学院 A kind of building outside climbing type CONSTRUCTION OPERATIONS platform
CN109339430A (en) * 2018-09-27 2019-02-15 鼎宸建设管理有限公司 A kind of climbing frame reverses safeguard construction to external extension

Similar Documents

Publication Publication Date Title
US10329781B2 (en) Safety barrier netting system
CN102383588B (en) Lifting platform for protecting safety of high-level construction
CN201158933Y (en) High-rise maintaining scaffold device with extruding structure
CN201670702U (en) Manual lifting operation equipment
US9016025B2 (en) Constructing method for concrete cylinder of construction steel bar of high-rise steel structure
CN201826525U (en) Climbing shuttering system device for buildings
WO2014066705A1 (en) Hoisting platform system
CN201635379U (en) Safety platform for installation and construction of roof contour plate hang ceiling
CN101775907A (en) Space truss structure aerial pairing integral slide installation method
CN206408952U (en) A kind of construction adhesion type lifts discharging platform
US9528285B2 (en) Safety barrier netting system with rigid panel net supports and stopper mechanisms
CN201598820U (en) Single point suspension external hanging bracket
CN102650261A (en) Segmental lifting method for impeller of high-power wind driven generator
CN202508804U (en) Gantry derrick hoisting system
CN202530769U (en) Large span steel structure high-altitude subsection hoisting support system
CN101725271A (en) Rapid construction method of reinforced concrete chimney
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN105672678A (en) Method for mounting overall steel protective shed cantilever frame
CN107700719A (en) A kind of hanging method of high-rise building glass curtain wall
CN106437130A (en) Inner roof external climbing type formwork construction platform for super high-rise building construction
JP2000053387A (en) Safety fence for building construction
CN102852344B (en) Construction method for dismounting high-rise cast-in-place concrete building
CN101734560B (en) High-altitude dismantling method of inside-climbing tower crane for towering structure construction
CN108265977B (en) Large-span space latticed shell assembly jig frame construction method under complex working condition
CN103982040B (en) A kind of construction of super highrise building vertical multi-transportation device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant