CN202185568U - Novel double-flow slab continuous casting tundish flow control device - Google Patents

Novel double-flow slab continuous casting tundish flow control device Download PDF

Info

Publication number
CN202185568U
CN202185568U CN2011202242581U CN201120224258U CN202185568U CN 202185568 U CN202185568 U CN 202185568U CN 2011202242581 U CN2011202242581 U CN 2011202242581U CN 201120224258 U CN201120224258 U CN 201120224258U CN 202185568 U CN202185568 U CN 202185568U
Authority
CN
China
Prior art keywords
tundish
dam
slag
blocking wall
slag blocking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202242581U
Other languages
Chinese (zh)
Inventor
于海岐
王金辉
李超
张宏亮
吴亚新
龙山
吕志勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang Steel Co Ltd
Original Assignee
Angang Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Steel Co Ltd filed Critical Angang Steel Co Ltd
Priority to CN2011202242581U priority Critical patent/CN202185568U/en
Application granted granted Critical
Publication of CN202185568U publication Critical patent/CN202185568U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Continuous Casting (AREA)

Abstract

The utility model relates to a novel double-flow slab continuous casting tundish flow control device, which comprises a tundish, a turbulence controller, a slag dam and a slag wall, wherein the turbulence controller is of a truncated cone-shaped groove-shaped structure, and the inner bottom of the turbulence controller is provided with an annular corrugated convex layer; the top edge is equipped with inside bellied border, and the last overlength of slag wall and slag dam all is greater than the length of lower side, and the centre of tundish bottom is equipped with the turbulence controller, and the central bilateral symmetry is equipped with the slag wall in the tundish cover, and the slag wall sets up with the tundish cover is perpendicular, and the symmetry is equipped with the slag dam between the mouth of a river on tundish bottom center and both sides, and the slag dam sets up with the tundish bottom is perpendicular. The vertical distance L1 between the slag dam and the central line of the long nozzle is larger than the vertical distance L2 between the slag wall and the central line of the long nozzle. Compared with the prior art, the beneficial effects of the utility model are that: the device has simple structure and reasonable design, effectively prolongs the average residence time of the molten steel in the tundish and inhibits the turbulence degree of the molten steel.

Description

A kind of novel double-current sheet billet continuous casting tundish flow control device
Technical field
The utility model relates to the continuous casting technology field, particularly a kind of novel double-current sheet billet continuous casting tundish flow control device.
Background technology
Along with the fast development of tundish metallurgy technology, the performance of its metallurgical function directly influences the cleanliness factor of continuous casting steel, and even the production of final high-quality steel.Tundish has been not only and has been connected molten steel storage container between ladle and crystallizer, especially evenly liquid steel temperature, remove field trash to promote the effective means of molten steel cleanliness to greatest extent.And the flow control device of installing in the tundish is realized the effective ways of above-mentioned metallurgical function just; Through the flow control device of suitable construction is installed, can play stable and optimize molten steel flow state in the tundish, evenly liquid steel temperature and composition, the prolongation molten steel time of staying remove, prevent metallurgical effects such as secondary oxidation of steel pollution with the abundant come-up that promotes field trash.Is main and at present the flow control device in the tundish is many with single barricade or retaining dam, mainly has following drawback: 1) that the turbulent extent of MOLTEN STEEL FLOW in the tundish is suppressed effect is undesirable for ladle high speed beam; 2) can not fully prolong the mean residence time of molten steel in tundish; 3) undesirable for the effect of the dead band that reduces molten steel in the tundish, increase piston region; 4) can not remove with the effective come-up that promotes field trash by full and uniform liquid steel temperature; 5) can not effectively control the surplus that tundish stops watering the back molten steel.
Therefore, better bring into play and need a kind ofly suppress outstanding effect to the molten steel turbulent flow for the tundish metallurgy function, the time of staying prolongs in tundish to make molten steel, effectively reduces the device of interior molten steel dead band of tundish and increase piston region.
Summary of the invention
The purpose of the utility model provides a kind of novel double-current sheet billet continuous casting tundish flow control device, and this apparatus structure is simple, reasonable in design, effectively prolongs the mean residence time of molten steel in tundish and the turbulent extent that suppresses molten steel.
For realizing above-mentioned purpose, the utility model adopts following technical scheme to realize:
A kind of novel double-current sheet billet continuous casting tundish flow control device comprises tundish, turbulence inhibitor, dam, slag blocking wall, and described turbulence inhibitor is a truncated cone-shaped groove-like structure, and the inside bottom of turbulence inhibitor is provided with the protruding layer of annular wrinkle; Top is provided with inwardly protruded edge; Slag blocking wall is an isosceles trapezoidal structure, and dam is that the edge of going to the bottom is provided with the isosceles trapezoidal structure of several perforates, and the last length of side of slag blocking wall and dam is all greater than the length of side down; Described tundish bottom centre is provided with turbulence inhibitor; The center bilateral symmetry is provided with slag blocking wall in the middle clad, and slag blocking wall is provided with middle clad is vertical, is arranged with dam between tundish bottom centre and the both sides filling pipe end; And dam and tundish dolly directly are provided with, and the vertical range L1 of described dam and long nozzle center line is greater than the vertical range L2 of slag blocking wall and long nozzle center line.
Described turbulence inhibitor, slag blocking wall, dam all adopt refractory material to process.
Compared with prior art, the beneficial effect of the utility model is: 1) this device adopts the combination of turbulence inhibitor, slag blocking wall, dam, effectively eliminates splash and turbulent flow phenomenon that molten steel injects tundish, has reduced the tubulence energy of molten steel significantly; 2) this device effectively prolongs the mean residence time of molten steel at tundish, further promotes floating foreign to remove, and the liquid steel temperature in the tundish is distributed more uniformly; 3) this device adopts the turbulence inhibitor of truncated cone-shaped groove-like, has eliminated the floating problem in the steel pouring process; 4) this device adopts the dam of band bottom outlet can either make molten steel pass through tundish, can realize stopping watering effective control of residue molten steel amount in the process tundish again, reduces the surplus steel amount of tundish; 5) this device obviously alleviates middle water containing opening wadding flow process degree, and then the cleanliness factor of molten steel is improved.
Description of drawings
Fig. 1 is the cross-sectional view of the utility model.
Fig. 2 is the generalized section of the utility model turbulence inhibitor.
Fig. 3 is the structural representation of the utility model dam.
Fig. 4 is the structural representation of the utility model slag blocking wall.
Among the figure: 1-tundish 2-long nozzle 3-slag blocking wall 4-dam 5-turbulence inhibitor 6-filling pipe end
The specific embodiment
Describe in further detail below in conjunction with the specific embodiment of accompanying drawing the utility model.
See Fig. 1, Fig. 2, Fig. 3, Fig. 4; A kind of novel double-current sheet billet continuous casting tundish flow control device; Comprise tundish 1, turbulence inhibitor 5, dam 4, slag blocking wall 3, turbulence inhibitor 5 is a truncated cone-shaped groove-like structure, and the inside bottom of turbulence inhibitor 5 is provided with the protruding layer of annular wrinkle; The top of turbulence inhibitor 5 is provided with inwardly protruded edge; Slag blocking wall 3 is an isosceles trapezoidal structure; Dam 4 is provided with the isosceles trapezoidal structure of several perforates for the edge of going to the bottom, and the last length of side of slag blocking wall 3 and dam 4 is all greater than descending the length of side, and tundish 1 bottom centre is provided with turbulence inhibitor 5; The center bilateral symmetry is provided with slag blocking wall 3 in tundish 1 lid; And slag blocking wall 3 and the vertical setting of tundish 1 lid be arranged with dam 4 between tundish 1 bottom centre and the both sides filling pipe end 6, and dam 4 are provided with directly with tundish 1 dolly; Turbulence inhibitor 5, slag blocking wall 3, dam 4 all adopt refractory material to process, and the vertical range L1 of dam 4 and long nozzle 2 center lines is greater than the vertical range L2 of slag blocking wall 3 with long nozzle 2 center lines.
Embodiment one, and a kind of novel double-current sheet billet continuous casting tundish flow control device is like Fig. 1~shown in Figure 4; Comprise tundish 1, turbulence inhibitor 5, dam 4, slag blocking wall 3, turbulence inhibitor 5 is a truncated cone-shaped groove-like structure, and the bottom of turbulence inhibitor 5 is provided with the protruding layer of annular wrinkle; As shown in Figure 2, the protruding layer of the wrinkle of turbulence inhibitor 5 bottoms is a waveform, and the top of turbulence inhibitor 5 is provided with inwardly protruded edge; As shown in Figure 4, slag blocking wall 3 is isosceles trapezoidal structure, and is as shown in Figure 3; Dam 4 is provided with the isosceles trapezoidal structure of several perforates for the edge of going to the bottom, and the last length of side of slag blocking wall 3 and dam 4 is all greater than the set-up mode setting of descending the length of side, and tundish 1 bottom centre is provided with turbulence inhibitor 5; The center bilateral symmetry is provided with slag blocking wall 3 in tundish 1 lid, and slag blocking wall 3 and the vertical setting of tundish 1 lid, is arranged with dam 4 between tundish 1 bottom centre and the both sides filling pipe end 6; And dam 4 directly is provided with tundish 1 dolly; Turbulence inhibitor 5, slag blocking wall 3, dam 4 all adopt refractory material to process, and dam 4 is 1800mm with the vertical range L1 of long nozzle 21 bottom centre, and slag blocking wall 3 is 1500mm with the vertical range L2 at long nozzle 2 centers.
Embodiment two, and a kind of novel double-current sheet billet continuous casting tundish flow control device is like Fig. 1~shown in Figure 4; Comprise tundish 1, turbulence inhibitor 5, dam 4, slag blocking wall 3, turbulence inhibitor 5 is a truncated cone-shaped groove-like structure, and the bottom of turbulence inhibitor 5 is provided with the protruding layer of annular wrinkle; As shown in Figure 2, the protruding layer of the wrinkle of turbulence inhibitor 5 bottoms is a waveform, and the top of turbulence inhibitor 5 is provided with inwardly protruded edge; As shown in Figure 4, slag blocking wall 3 is isosceles trapezoidal structure, and is as shown in Figure 3; Dam 4 is provided with the isosceles trapezoidal structure of several perforates for the edge of going to the bottom, and the last length of side of slag blocking wall 3 and dam 4 is all greater than the set-up mode setting of descending the length of side, and tundish 1 bottom centre is provided with turbulence inhibitor 5; The center bilateral symmetry is provided with slag blocking wall 3 in tundish 1 lid, and slag blocking wall 3 and the vertical setting of tundish 1 lid, is arranged with dam 4 between tundish 1 bottom centre and the both sides filling pipe end 6; And dam 4 directly is provided with tundish 1 dolly; Turbulence inhibitor 5, slag blocking wall 3, dam 4 all adopt refractory material to process, and dam 4 is 1700mm with the vertical range L1 of long nozzle 2 center lines, and slag blocking wall 3 is 1300mm with the vertical range L2 of long nozzle 2 center lines.

Claims (2)

1. novel double-current sheet billet continuous casting tundish flow control device; It is characterized in that; Comprise tundish, turbulence inhibitor, dam, slag blocking wall, described turbulence inhibitor is a truncated cone-shaped groove-like structure, and the inside bottom of turbulence inhibitor is provided with the protruding layer of annular wrinkle; Top is provided with inwardly protruded edge; Slag blocking wall is an isosceles trapezoidal structure, and dam is that the edge of going to the bottom is provided with the isosceles trapezoidal structure of several perforates, and the last length of side of slag blocking wall and dam is all greater than the length of side down; Described tundish bottom centre is provided with turbulence inhibitor; The center bilateral symmetry is provided with slag blocking wall in the middle clad, and slag blocking wall is provided with middle clad is vertical, is arranged with dam between tundish bottom centre and the both sides filling pipe end; And dam and tundish dolly directly are provided with, and the vertical range L1 of described dam and long nozzle center line is greater than the vertical range L2 of slag blocking wall and long nozzle center line.
2. a kind of novel double-current sheet billet continuous casting tundish flow control device according to claim 1 is characterized in that described turbulence inhibitor, slag blocking wall, dam all adopt refractory material to process.
CN2011202242581U 2011-06-29 2011-06-29 Novel double-flow slab continuous casting tundish flow control device Expired - Fee Related CN202185568U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202242581U CN202185568U (en) 2011-06-29 2011-06-29 Novel double-flow slab continuous casting tundish flow control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202242581U CN202185568U (en) 2011-06-29 2011-06-29 Novel double-flow slab continuous casting tundish flow control device

Publications (1)

Publication Number Publication Date
CN202185568U true CN202185568U (en) 2012-04-11

Family

ID=45917041

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202242581U Expired - Fee Related CN202185568U (en) 2011-06-29 2011-06-29 Novel double-flow slab continuous casting tundish flow control device

Country Status (1)

Country Link
CN (1) CN202185568U (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102744393A (en) * 2012-07-26 2012-10-24 莱芜钢铁集团有限公司 Tundish flow control device for slab casting machine, preparation method thereof and slagging method using tundish flow control device
CN102744394A (en) * 2012-07-26 2012-10-24 莱芜钢铁集团有限公司 Flow control device for tundish of slab continuous caster and deslagging method thereof
CN103240406A (en) * 2013-04-28 2013-08-14 首钢总公司 Continuous casting tundish and continuous casting tundish casting control method
CN110253006A (en) * 2019-07-19 2019-09-20 马鞍山钢铁股份有限公司 Continuous casting production, the device and method that remaining cutting quantity is cast for reducing continuous casting production
CN110315060A (en) * 2018-03-30 2019-10-11 宝山钢铁股份有限公司 A kind of flow control formula tundish structure may filter that the field trash in molten steel
CN110328356A (en) * 2019-08-28 2019-10-15 庄小梅 A kind of dry materials liner in dundish of reserved weir plate slot is with releasing the explosion-proof pipe mold of slag
CN110614350A (en) * 2019-10-11 2019-12-27 马鞍山钢铁股份有限公司 Method for reducing casting residue of tundish of 2-machine 2-flow slab continuous casting machine
CN111136252A (en) * 2019-12-30 2020-05-12 山东钢铁集团日照有限公司 Continuous casting tundish slag dam
CN111872366A (en) * 2020-09-03 2020-11-03 苏强 Steel pouring tundish
CN112191835A (en) * 2020-10-12 2021-01-08 武汉科技大学 "Dujiang weir" type multistage bottom cyclone type current stabilizer
CN114734031A (en) * 2022-04-11 2022-07-12 成都先进金属材料产业技术研究院股份有限公司 Pouring chute of vacuum induction furnace and pouring method of vacuum induction smelting

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102744393A (en) * 2012-07-26 2012-10-24 莱芜钢铁集团有限公司 Tundish flow control device for slab casting machine, preparation method thereof and slagging method using tundish flow control device
CN102744394A (en) * 2012-07-26 2012-10-24 莱芜钢铁集团有限公司 Flow control device for tundish of slab continuous caster and deslagging method thereof
CN102744394B (en) * 2012-07-26 2014-04-30 莱芜钢铁集团有限公司 Flow control device for tundish of slab continuous caster and deslagging method thereof
CN103240406A (en) * 2013-04-28 2013-08-14 首钢总公司 Continuous casting tundish and continuous casting tundish casting control method
CN103240406B (en) * 2013-04-28 2015-05-27 首钢总公司 Continuous casting tundish and continuous casting tundish casting control method
CN110315060A (en) * 2018-03-30 2019-10-11 宝山钢铁股份有限公司 A kind of flow control formula tundish structure may filter that the field trash in molten steel
CN110253006A (en) * 2019-07-19 2019-09-20 马鞍山钢铁股份有限公司 Continuous casting production, the device and method that remaining cutting quantity is cast for reducing continuous casting production
CN110328356A (en) * 2019-08-28 2019-10-15 庄小梅 A kind of dry materials liner in dundish of reserved weir plate slot is with releasing the explosion-proof pipe mold of slag
CN110614350A (en) * 2019-10-11 2019-12-27 马鞍山钢铁股份有限公司 Method for reducing casting residue of tundish of 2-machine 2-flow slab continuous casting machine
CN111136252A (en) * 2019-12-30 2020-05-12 山东钢铁集团日照有限公司 Continuous casting tundish slag dam
CN111872366A (en) * 2020-09-03 2020-11-03 苏强 Steel pouring tundish
CN112191835A (en) * 2020-10-12 2021-01-08 武汉科技大学 "Dujiang weir" type multistage bottom cyclone type current stabilizer
CN112191835B (en) * 2020-10-12 2024-04-19 武汉科技大学 Multi-stage bottom swirling type current stabilizer
CN114734031A (en) * 2022-04-11 2022-07-12 成都先进金属材料产业技术研究院股份有限公司 Pouring chute of vacuum induction furnace and pouring method of vacuum induction smelting
CN114734031B (en) * 2022-04-11 2023-12-15 成都先进金属材料产业技术研究院股份有限公司 Pouring launder of vacuum induction furnace and pouring method of vacuum induction smelting

Similar Documents

Publication Publication Date Title
CN202185568U (en) Novel double-flow slab continuous casting tundish flow control device
CN202845761U (en) Novel tundish for highly purified liquid steel
CN206622605U (en) A kind of three machines three stream slab CC tundish
CN208528079U (en) A kind of continuous casting production dam
CN204842961U (en) Get rid of immersion nozzle of inclusion
CN102825229A (en) Flow control structure for preventing vortexes from being generated in tundish
CN208628416U (en) A kind of double fluid slab tundish flow control element
CN202377519U (en) Slag blocking dam with right-angled flow baffles for flow control in slab tundish
CN203778726U (en) 12-strand conticaster tundish with reasonable flow-dividing function
CN201565600U (en) Immersion type water opening used for thin plate blank continuous casting crystallizer
CN203956040U (en) A kind of two lobe formula submersed nozzle electromagnetic eddy flow device and bracing or strutting arrangements thereof
CN202701364U (en) Long nozzle continuous casting tundish
CN201988711U (en) Novel continuous casting tundish turbulence controller
CN202527694U (en) Tundish structure capable of reducing blank casting inclusions
CN204953892U (en) A inclusion trapping apparatus for continuous casting crystallizer
CN203209684U (en) Six-hole submerged nozzle for pouring large square blank
CN201442088U (en) Deflection casting combined device for large square billet water gap
CN103252465B (en) A kind of turbulence inhibitor for asymmetric continuous casting production
CN201677027U (en) Turbulent flow suppressor for continuous casting tundish
CN209998333U (en) Filtering flow divider for tundish
CN203292440U (en) Continuous casting submerged nozzle capable of reducing molten steel impact
CN208628417U (en) A kind of list flowing plate base tundish flow control element
CN203495207U (en) Slag blocking wall of tundish for square billet continuous casting
CN202377504U (en) Double-layer type current regulator for continuous casting tundish
CN202701326U (en) An improved tundish and improved flow stabilizers for a billet caster

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120411

Termination date: 20170629

CF01 Termination of patent right due to non-payment of annual fee