CN203495207U - Slag blocking wall of tundish for square billet continuous casting - Google Patents

Slag blocking wall of tundish for square billet continuous casting Download PDF

Info

Publication number
CN203495207U
CN203495207U CN201320642357.0U CN201320642357U CN203495207U CN 203495207 U CN203495207 U CN 203495207U CN 201320642357 U CN201320642357 U CN 201320642357U CN 203495207 U CN203495207 U CN 203495207U
Authority
CN
China
Prior art keywords
wall
wall body
slag
plane body
slag blocking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320642357.0U
Other languages
Chinese (zh)
Inventor
肖小华
朱永军
汪正峰
颜浩
李洪波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI LIRR REFRACTORY CO Ltd
Original Assignee
SHANGHAI LIRR REFRACTORY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI LIRR REFRACTORY CO Ltd filed Critical SHANGHAI LIRR REFRACTORY CO Ltd
Priority to CN201320642357.0U priority Critical patent/CN203495207U/en
Application granted granted Critical
Publication of CN203495207U publication Critical patent/CN203495207U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Casting Support Devices, Ladles, And Melt Control Thereby (AREA)

Abstract

The utility model mainly relates to a slag blocking wall of a tundish for square billet continuous casting. The slag blocking wall of the tundish for square billet continuous casting comprises a planar wall body and an oblique wall body which is arranged on one side of the planar wall body, liquid steel holes are formed in the planar wall body and the oblique wall body respectively, one end of the oblique wall body is connected with one end of the planar wall body, so that an L-shaped structure is formed, and a thickening layer which protrudes out of wall surfaces is arranged on the position of a slag line, above the liquid steel holes, on the wall surfaces of the planar wall body and the oblique wall body. According to the slag blocking wall of the tundish for square billet continuous casting, due to the fact that the slag blocking wall is of the L-shaped structure, a flow field of liquid steel can be more stable, furnace slag can be separated from the liquid steel conveniently, and the cleanliness of the liquid steel is improved; due to the fact that the corner position where the planer wall body is connected with the oblique wall body is of an arc structure, scouring of eddies to the corner position is effectively reduced, and the overall scouring resistance of the slag blocking wall is improved; due to the fact that the thickening layer is arranged on the position of the slag line of the slag blocking wall, corrosion of the liquid steel to the planar wall body and the oblique wall body is effectively relieved, and the overall corrosion resistance of the slag blocking wall is improved.

Description

A kind of billet continuous casting tundish slag wall
Technical field
The utility model relates to tundish metallurgy refractory for continuous casting, is specifically related to a kind of billet continuous casting tundish slag wall.
Background technology
Along with the progress of Technology of Tundish Metallurgy, to improve centered by the cleanliness factor of molten steel, from improving MOLTEN STEEL FLOW state, take, reach that to reduce molten steel slag inclusion thing be object, slag blocking wall is set in tundish.Slag blocking wall is divided into two by tundish and had not only connected each other but also separate region: impact zone and beam district.The effect of slag blocking wall on tundish metallurgy is as follows: 1, become the movement locus that steel flows, extend the time of staying of steel stream in tundish, make the field trash in molten steel have sufficient time collision, assemble, float, purify hot metal.2, the molten steel fluidised form changing in tundish distributes, and makes molten steel flow field reach optimum state.3, reduce stagnant area, expand current stabilization district.4, steel is flow to reach the time at each shunting mouth of a river of tundish basic identical, with even temperature of each stream, reduce bleedout and stopper bonding phenomenon.At present tundish slag wall is traditionally arranged to be U-shaped, V-arrangement, the structure such as trapezoidal, continuous casting is opened while watering molten steel in ladle and is injected fast tundish, forms strong eddy current and turbulent flow in tundish impact area, and the flow regime of molten steel is more disorderly, slag is easily involved in molten steel, affects the cleanliness factor of molten steel; The eddy current simultaneously forming, washes away seriously the resistance to material of slag blocking wall slag lining, and along with the increase of pouring furnace number, slag blocking wall slag lining corrodes and aggravates, and easily causes the slag blocking wall slag lining phenomenon that even slag line comes off with upper part integral body of boring a hole.
Utility model content
The purpose of this utility model is to provide a kind of billet continuous casting tundish slag wall, and this slag blocking wall is simple in structure, is conducive to the separated of slag and molten steel, and erosion resistibility and resistance to erosiveness are strong, and whole service life is long.
The utility model is for solving the problems of the technologies described above, the technical scheme providing is: a kind of billet continuous casting tundish slag wall, comprise plane body of wall and the inclined-plane body of wall that is arranged on plane body of wall one side, on plane body of wall and inclined-plane body of wall, be provided with steel outlet hole, described inclined-plane body of wall and one end of plane body of wall join and form L shaped structure, and on the metope of plane body of wall and inclined-plane body of wall, the slag lining that is positioned at steel outlet hole top is provided with the thickening layer that protrudes from metope.
Described plane body of wall and the junction of inclined-plane body of wall are arc transition.
The thickness of described thickening layer is 30mm.
beneficial effect
1, L shaped slag blocking wall structure of the present utility model can make molten steel flow field more stable, is conducive to the separated of slag and molten steel, has improved the cleanliness factor of molten steel simultaneously.
2, slag blocking wall of the present utility model is arcuate structure in the junction, turning of plane body of wall and inclined-plane body of wall, has effectively cut down eddy current to the washing away of this position, and has improved the whole erosion resistibility of slag blocking wall.
3, slag blocking wall of the present utility model arranges thickening layer at slag lining place, has effectively slowed down the erosion of molten steel to plane body of wall and inclined-plane body of wall, has improved the whole corrosion-resistant property of slag blocking wall.
Accompanying drawing explanation
Fig. 1 is the front view of the utility model structural representation; Fig. 2 is the top view of the utility model structural representation; Fig. 3 is along the sectional structure schematic diagram of A-A direction in Fig. 2; Fig. 4 is along the sectional structure schematic diagram of B-B direction in Fig. 2;
Reference numeral: 1, plane body of wall, 2, inclined-plane body of wall, 3, thickening layer, 4, steel outlet hole.
The specific embodiment
A kind of billet continuous casting tundish slag wall, comprise plane body of wall 1 and the inclined-plane body of wall 2 that is arranged on plane body of wall 1 one sides, on plane body of wall 1 and inclined-plane body of wall 2, be provided with steel outlet hole 4, described inclined-plane body of wall 2 joins and forms L shaped structure with one end of plane body of wall 1, and on the metope of plane body of wall 1 and inclined-plane body of wall 2, the slag lining that is positioned at steel outlet hole 4 tops is provided with the thickening layer 3 that protrudes from metope.Described plane body of wall 1 and the junction of inclined-plane body of wall 2 are arc transition.The thickness of described thickening layer 3 is 30mm.As shown in Figure 1, 2, the utility model in use, because plane body of wall 1, inclined-plane body of wall 2 connect into L shapedly, makes molten steel flow field in tundish stable, is conducive to the separated of slag and molten steel, has improved the cleanliness factor of molten steel.The curved structure in junction of plane body of wall 1 and inclined-plane body of wall 2, has effectively cut down eddy current to the washing away of this position, and has improved the whole erosion resistibility of slag blocking wall.As shown in Figure 3,4, the utility model, because the slag lining place at plane body of wall 1 and inclined-plane body of wall 2 is provided with thickening layer 3, has effectively slowed down the erosion of molten steel to plane body of wall 1 and inclined-plane body of wall 2, has improved the whole corrosion-resistant property of slag blocking wall.

Claims (3)

1. a billet continuous casting tundish slag wall, comprise plane body of wall (1) and be arranged on the inclined-plane body of wall (2) of plane body of wall (1) one side, on plane body of wall (1) and inclined-plane body of wall (2), be provided with steel outlet hole (4), it is characterized in that: described inclined-plane body of wall (2) joins and forms L shaped structure with one end of plane body of wall (1), and on the metope of plane body of wall (1) and inclined-plane body of wall (2), the slag lining that is positioned at steel outlet hole (4) top is provided with the thickening layer (3) that protrudes from metope.
2. a kind of billet continuous casting tundish slag wall as claimed in claim 1, is characterized in that: described plane body of wall (1) and the junction of inclined-plane body of wall (2) are arc transition.
3. a kind of billet continuous casting tundish slag wall as claimed in claim 1, is characterized in that: the thickness of described thickening layer (3) is 30mm.
CN201320642357.0U 2013-10-18 2013-10-18 Slag blocking wall of tundish for square billet continuous casting Expired - Lifetime CN203495207U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320642357.0U CN203495207U (en) 2013-10-18 2013-10-18 Slag blocking wall of tundish for square billet continuous casting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320642357.0U CN203495207U (en) 2013-10-18 2013-10-18 Slag blocking wall of tundish for square billet continuous casting

Publications (1)

Publication Number Publication Date
CN203495207U true CN203495207U (en) 2014-03-26

Family

ID=50326214

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320642357.0U Expired - Lifetime CN203495207U (en) 2013-10-18 2013-10-18 Slag blocking wall of tundish for square billet continuous casting

Country Status (1)

Country Link
CN (1) CN203495207U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106001526A (en) * 2016-06-27 2016-10-12 宜兴市龙宸炉料有限公司 Composite type tundish slag retaining wall
CN106378442A (en) * 2016-08-30 2017-02-08 洛阳利尔耐火材料有限公司 Preparation method for slag wall of tundish

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106001526A (en) * 2016-06-27 2016-10-12 宜兴市龙宸炉料有限公司 Composite type tundish slag retaining wall
CN106378442A (en) * 2016-08-30 2017-02-08 洛阳利尔耐火材料有限公司 Preparation method for slag wall of tundish

Similar Documents

Publication Publication Date Title
CN202845761U (en) Novel tundish for highly purified liquid steel
CN203495207U (en) Slag blocking wall of tundish for square billet continuous casting
CN209598184U (en) A kind of tundish integral current stabilizer
CN208628416U (en) A kind of double fluid slab tundish flow control element
CN204912747U (en) Crystallizer vortex immersion nozzle
CN104107905A (en) Slab continuous casting tundish
CN204770627U (en) Packing is put in middle of single current passageway formula induction heating bend pipe type passageway
CN203778726U (en) 12-strand conticaster tundish with reasonable flow-dividing function
CN202684001U (en) Tundish slag blocking wall of billet continuous casting machine
CN203610667U (en) Flow-stabilizing and residue-blocking device for continuous casting molten steel tundish
CN206794743U (en) M type slag blocking walls for continuous casting production
CN204094086U (en) A kind of continuous casting production slag blocking wall
CN203578742U (en) Continuous casting tundish confluent vortex suppressor and continuous casting tundish
CN102950275B (en) Multi-hole continuous-casting submersed nozzle for square and round billets
CN202506836U (en) Large-flux steel tapping wholly-submersed nozzle for continuously cast grade rectangular steel billet
CN205869450U (en) Slag retaining wall of metallurgical usefulness
CN208628417U (en) A kind of list flowing plate base tundish flow control element
CN102764865B (en) Submersed nozzle for high-casting-speed continuous casting crystallizer
CN201755651U (en) Tundish slag wall
CN101972845B (en) Steel ladle without vortexes and working method thereof
CN202701364U (en) Long nozzle continuous casting tundish
CN202613985U (en) Launder device for copper casting liquid furnace shifting process
CN203343395U (en) High pulling speed continuous casting submerged nozzle with liquid steel buffering
CN207076960U (en) A kind of stainless steel continuous casting tundish
CN102642017B (en) Ladle bottom structure of continuous casting ladle

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140326