CN202137826U CN201120037563U CN201120037563U CN202137826U CN 202137826 U CN202137826 U CN 202137826U CN 201120037563 U CN201120037563 U CN 201120037563U CN 201120037563 U CN201120037563 U CN 201120037563U CN 202137826 U CN202137826 U CN 202137826U
Authority
CN
China
Prior art keywords
flue gas
gas channel
template
mouldboards
mold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120037563U
Other languages
Chinese (zh)
Inventor
赵永强
耿佳伟
陈文龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi University of Technology
Original Assignee
Shaanxi University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi University of Technology filed Critical Shaanxi University of Technology
Priority to CN201120037563U priority Critical patent/CN202137826U/en
Application granted granted Critical
Publication of CN202137826U publication Critical patent/CN202137826U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Treating Waste Gases (AREA)

Abstract

The utility model relates to a flue gas channel precasting and moulding pouring machine which is used for precasting and moulding of a flue gas channel in a building, and is convenient for precasting section types of the flue gas channel outside a construction site specified in national standards. The integral machine is divided into an inner mould and an outer mould, wherein the outer mould consists of three mouldboards; the inner mould consists of an inner mould bracket, six mouldboards and a connecting rod; and a space between the inner mould and the outer mould is a concrete filling space. The six mouldboards which form the inner mould are connected end to end through hinges to form a sealed frame; the mouldboards at the left side and the right side can contract through a spring, and the mouldboards at the upper side and the lower side can contract through a connecting rod mechanism; and the outer mould can slide axially along guide rails on a base. After a flue is poured and solidified, the inner mould contracts first, then the outer mouldboards and the poured flue are pushed to leave the pouring position, so that manufacture of a section of flue gas channel can be completed. The flue gas channel precasting and moulding pouring machine has the characteristics that the structure is simple, the operation is convenient, the quality of the produced flue gas channel is stable, the production efficiency is high, etc.

Description

The pre-formed casting machine of gas flue
Technical field
The utility model relates to the pre-formed casting machine of a kind of gas flue.This device is used for building the pre-formed of used gas flue, and is convenient prefabricated for carrying out in the precast plant of flue section form outside the building site that stipulates in the GB, afterwards prefabricated flue is installed within the building.
Background technology
The at present main model manual mode of operation that adopts of the production of used gas flue in the building, a kind of mode is that four sides of single-unit gas flue are prefabricated respectively, then the fixedly demoulding after the maintenance; This method implements easy easily; But the production cycle is long, and efficient is low, and the production site area occupied is big.Another kind of mode is to adopt special-purpose gas flue mould, and mould is by base plate, side plate and seal up a door and forms, has certain practicality, but still manual operations when producing can't realize High-efficient Production, moreover Mold Making cost height, and production efficiency is low.
Summary of the invention
How to realize gas flue Integratively formed be the key that improves the prefabricated production efficiency of gas flue, the utility model will adopt a kind of application specific architecture form to realize the quick prefabricated moulding of gas flue, realize efficiently, production efficiently.
The utility model relates to the pre-formed casting machine of a kind of gas flue; Complete machine is divided into internal mold and external mold two parts, and external mold is made up of three templates, is respectively two blocks of side plates (6) and a base plate (12); Upside opens wide, and two blocks of side plates (6) pass through hinge links on base plate (12); Internal mold is made up of interior mould holder (7), six templates and connecting rod (1,15), and the space between internal mold and the external mold is the concrete packing space.
Six templates forming internal mold connect with hinge successively from beginning to end, form the shaped as frame of a sealing, each template of and arranged on left and right sides wherein, and each is made up of upper and lower both sides two Divide Template; The and arranged on left and right sides template is shunk through spring (2); Upper and lower side template tightens up through connecting rod (1) and intermediate draw bar (15); Intermediate draw bar (15) is realized moving axially through the screw-nut body (14) that is positioned at the left side, and connecting rod (1) shrinks upper and lower template after the run-off the straight thereupon; When feed screw nut oppositely moves, make incline link (1) be in vertical position, upper and lower side template returns to smooth position.
Internal mold is fixed together together with interior mould holder (7) and base, and nut in the rotational lead screw nut body (14), leading screw drag intermediate draw bar (15) and move the contraction that makes internal mold vertically, and external mold can carry out axial slip along the guide rail on the base.
The left side of mold bottom plate is connected with the V-type roller, and the right side is connected with circle roller, and the V-type roller is placed on the epirelief V-type rail in left side, and circle roller is placed on the closed slide, is undertaken spacing by positive stop (13).
Description of drawings
The pre-formed casting machine structural front view of Fig. 1 gas flue.
The pre-formed casting machine structure side of Fig. 2 gas flue view
In Fig. 1 and Fig. 2, the 1st, the pull bar between upper and lower side plate of internal mold and the intermediate connecting rod; The 2nd, the returning spring of internal mold and arranged on left and right sides template; The 3rd, half of the upper and lower side template of internal mold; The 4th, the and arranged on left and right sides side plate of internal mold; The 5th, the concrete filler; The 6th, the external mold biside plate; The 7th, interior mould holder; The 8th, tapered roller; The 9th, left downside V-type lower guideway; The 10th, the lower right side flat guide; The 11st, the right circles roller; The 12nd, mold bottom plate; The 13rd, the positive stop of roller; The 14th, screw-nut body; The 15th, intermediate draw bar, an end is connected with screw-nut body.
The specific embodiment
The utility model relates to the pre-formed casting machine of a kind of gas flue, and is convenient prefabricated for carrying out in the precast plant of flue section form outside the building site that stipulates in the GB, afterwards prefabricated flue is installed within the building.
During prefabricated gas flue, the external mold of complete machine is moved to and internal mold overlaps the position along guide rail.The biside plate of external mold is packed up, and the rotational lead screw nut body makes the upper and lower side template of inner formword be in straight position, and the biside plate of internal mold also can be in extreme position farthest simultaneously.
At this moment, fill concrete material from the gap of external mold upside open surface between internal mold and external mold is tamped with shock club or dull and stereotyped jarring machine in the time of filling, waits all face compactings to carry out the coagulation forming that leaves standstill of certain hour afterwards.
After flue is built and is solidified well; Backward rotation screw-nut body (14); Screw-nut body 14 drives intermediate draw bar 15 and oppositely moves; Pull bar 1 between 15 drive upper and lower side plates of internal mold and the intermediate connecting rod is toppled over, and makes the upper and lower side template 3 of inner formword be in obliquity, and the biside plate 4 of internal mold also can be in nearest extreme position simultaneously.At this moment; Internal mold shrinks; The flue that promotes exterior sheathing biside plate 6 and base plate 12 and build moves to from interior die body place farthest along guide rail 9,10 together; Open external mold biside plate 6 again, the flue of building is upwards lifted the base plate 12 that leaves exterior sheathing, the new gas flue of such joint will be built successfully.

Claims (4)

1. the pre-formed casting machine of gas flue is characterized in that complete machine is divided into internal mold and external mold two parts, and external mold is made up of three templates, is respectively two blocks of side plates (6) and a base plate (12), and upside opens wide, and biside plate (6) passes through hinge links on base plate (12); Internal mold is made up of interior mould holder (7), six templates and connecting rod, and the space between internal mold and the external mold is the concrete packing space.
2. the pre-formed casting machine of gas flue according to claim 1; It is characterized in that six templates forming internal mold connect with hinge successively from beginning to end; The shaped as frame of forming a sealing, each template of and arranged on left and right sides wherein, each is made up of upper and lower both sides two Divide Template; The and arranged on left and right sides template is shunk through spring (2); Upper and lower side template tightens up through connecting rod (1) and intermediate draw bar (15); Intermediate draw bar (15) is realized moving axially through the screw-nut body (14) that is positioned at the left side, and connecting rod (1) shrinks upper and lower template after the run-off the straight thereupon; When feed screw nut oppositely moves, make incline link (1) be in vertical position, upper and lower side template returns to smooth position.
3. the pre-formed casting machine of gas flue according to claim 1; It is characterized in that internal mold is fixed together together with interior mould holder (7) and base; Nut in the rotational lead screw nut body (14); Leading screw drags intermediate draw bar (15) and moves the contraction that makes internal mold vertically, and external mold can carry out axial slip along the guide rail on the base.
4. the pre-formed casting machine of gas flue according to claim 1; The left side that it is characterized in that mold bottom plate is connected with the V-type roller, and the right side is connected with circle roller, and the V-type roller is placed on the epirelief V-type rail in left side; Circle roller is placed on the closed slide, is undertaken spacing by positive stop (13).
CN201120037563U 2011-01-28 2011-01-28 Flue gas channel precasting and moulding pouring machine Expired - Fee Related CN202137826U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120037563U CN202137826U (en) 2011-01-28 2011-01-28 Flue gas channel precasting and moulding pouring machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120037563U CN202137826U (en) 2011-01-28 2011-01-28 Flue gas channel precasting and moulding pouring machine

Publications (1)

Publication Number Publication Date
CN202137826U true CN202137826U (en) 2012-02-08

Family

ID=45548902

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120037563U Expired - Fee Related CN202137826U (en) 2011-01-28 2011-01-28 Flue gas channel precasting and moulding pouring machine

Country Status (1)

Country Link
CN (1) CN202137826U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103847023A (en) * 2014-03-19 2014-06-11 朱德红 Improved fume channel vibration casting machine
CN106142332A (en) * 2015-11-11 2016-11-23 朱志强 Two panels scalable interior mould gas flue shake casting machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103847023A (en) * 2014-03-19 2014-06-11 朱德红 Improved fume channel vibration casting machine
CN106142332A (en) * 2015-11-11 2016-11-23 朱志强 Two panels scalable interior mould gas flue shake casting machine

Similar Documents

Publication Publication Date Title
CN113021563A (en) Forming method of high-strength bridge concrete prefabricated part
CN210308385U (en) Automatic pouring device for cement precast block
CN207206694U (en) Building materials are molded moulding box
CN202137826U (en) Flue gas channel precasting and moulding pouring machine
CN116175747A (en) Vertical forming device for prefabricated box culvert and application method of vertical forming device
CN105196498A (en) Corrugated large-bend pipe fitting rotary core pulling injection molding die
CN112895085B (en) Bridge concrete prefabricated component preparation forming die
CN201157884Y (en) Stamping die machine of sand core for assisting grinding ball die making
CN213352849U (en) Precast beam preparation mould
CN206326096U (en) Sandbox production equipment and box moulding device
CN205969435U (en) Piping lane mould is assembled in horizontal many storehouses
CN210500730U (en) Hydraulic horizontal die for urban comprehensive pipe gallery
CN212266153U (en) Prefabricated rail top air duct component mould
CN107790646A (en) A kind of two-way compacting casting sand type formative method
CN202934693U (en) Mould opening shear mechanism for opening vertical mould machine side partition plate
CN113021933A (en) Resin-based composite material and processing technology and application thereof
CN203245339U (en) Steel ball casting device
CN206529794U (en) The prefabricated digitlization city integrated piping lane industrialization system Tool and Die Technology platform of multi-mode
CN218965721U (en) Forming die of bathroom wallboard
CN206662201U (en) Charge air cooler dextrad air chamber casting mould
CN214866799U (en) High-precision steel structure assembly type die
CN216992401U (en) Special-shaped wallboard production forming die
CN105216095A (en) A kind of concrete prefabricated building block multimode cavity forming machine
CN217290314U (en) Body cavity probe outer die convenient for demoulding for metal product
CN212266154U (en) A mould for bank protection brick make-up machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120208

Termination date: 20130128

CF01 Termination of patent right due to non-payment of annual fee