CN202120463U - 10kV microcomputer comprehensive protection installation and debugging training device - Google Patents

10kV microcomputer comprehensive protection installation and debugging training device Download PDF

Info

Publication number
CN202120463U
CN202120463U CN2010206689053U CN201020668905U CN202120463U CN 202120463 U CN202120463 U CN 202120463U CN 2010206689053 U CN2010206689053 U CN 2010206689053U CN 201020668905 U CN201020668905 U CN 201020668905U CN 202120463 U CN202120463 U CN 202120463U
Authority
CN
China
Prior art keywords
cabinet
cabinet body
installation
body door
training
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206689053U
Other languages
Chinese (zh)
Inventor
崔作让
杨宇松
于雨
曹义广
梁云英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DATONG POWER ADVANCED MECHANIC SCHOOL
Original Assignee
DATONG POWER ADVANCED MECHANIC SCHOOL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DATONG POWER ADVANCED MECHANIC SCHOOL filed Critical DATONG POWER ADVANCED MECHANIC SCHOOL
Priority to CN2010206689053U priority Critical patent/CN202120463U/en
Application granted granted Critical
Publication of CN202120463U publication Critical patent/CN202120463U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

A 10kV microcomputer comprehensive protection installation and debugging training device is provided. The training device comprises a simulation control cabinet which adopts a on-site universal KYN 28A-12 type practical cabinet body structure design, and five sets of detachable and replaceable simulation cabinet body doors are arranged on the front of the simulation control cabinet body according to cabinet body requirements of a wire-inletting cabinet, a wire-outgoing cabinet, a metering cabinet, a PT cabinet, and a bus couple cabinet respectively. A movable mesh plate for installing components is arranged inside the cabinet body, and the movable mesh plate is movably arranged on the inner side wall of the cabinet body through a hinge. The training device also comprises a device cabinet for storing training devices and the cabinet body doors. In the device, various training operation functions, such as microcomputer protection, operation, installation, debugging, and overhauling are integrated, the visual feature and the operability are strong, the installation of first and secondary side devices of a 10 kV electric power system, the wiring, and the installation, debugging and fault overhauling operations of comprehensive protection devices can be realized, the structure of the combined type cabinet body is flexible and changeable, the land occupation area is small, and the use is convenient. The device is suitable for the training of the training ability of electric power technical personnel.

Description

10kV computer integrated protection Installation and Debugging actual training device
Technical field
The utility model belongs to and the power technology personnel are carried out the training skill training uses the teaching equipment technical field; Relate to a kind of 10KV primary side and control the actual training device of simulation training; This device integrates real standard such as Microcomputer Protection, operation, installation, debugging, maintenance operating function; Can realize the training skill training to the power technology personnel, the supply voltage of device is 380V, and power supply mode is the Three-phase five-wire formula.
Background technology
Power technology personnel carry out actual technical training and practice at pre-job needs, and real equipment voltage is high, danger is very big, can cause grid power blackout and personal injury accidentally in the operation.And the handling of similar emulation practice equipment is poor, and what have biases toward controlling of primary equipment, and what have biases toward controlling of secondary device, and the form rate of exchange are single, and equipment volume is big heavy.So, researched and developed this real standard equipment in order to satisfy the needs of modern power industry technician actual operational capacity training.
The utility model content
The utility model purpose is that to solve the handling of existing electric analog practice equipment poor, and the form rate of exchange are single, and the big and heavy problem of equipment volume, and a kind of 10KV computer integrated protection system Installation and Debugging actual training device is provided.
The 10KV computer integrated protection system Installation and Debugging actual training device that the utility model provides; Comprise and adopt the emulation of the actual cabinet operating structure design of the general KYN28A-12 type in power industry scene to control cabinet; Emulation is controlled cabinet cabinet front and is provided with five cover removable and replaceable formula emulation cabinet body doors; Be respectively incoming line cabinet cabinet body door, outlet cabinet cabinet body door, metering cabinet cabinet body door, PT cabinet cabinet body door and female cabinet cabinet body door that joins; Be provided with the movable mesh plate that is used for installation elements in the cabinet, this activity mesh plate is movably arranged on (centre of described movable mesh plate can also install a combined page additional processes two fan doubling formula activity mesh plates) on the cabinet madial wall through hinge; This actual training device also comprises a device cabinet that is used to store real standard device and cabinet body door; This device cabinet set inside becomes element storeroom and cabinet body door storeroom two parts; Be separated into little compartment again according to institute's memory element kind in the element storeroom; Size according to cabinet body door in the cabinet body door storeroom is provided with a component dividing plate, is provided with ball slideway between the adjacent separator plates.
The whole cabinet that cabinet and device cabinet can be processed a disjunctor is controlled in described emulation, and the device cabinet is arranged at the back side that cabinet is controlled in emulation.
Advantage of the utility model and good effect:
The utility model integrates real standard such as Microcomputer Protection, operation, installation, debugging, maintenance operating function; Intuitive and strong operability; Can realize device installation, the wiring of first and second side of 10KV electric system, the Installation and Debugging and the trouble hunting operation of comprehensive protector; The combined type cabinet body structure is flexible and changeable, and floor area is little, and is easy to use.Be applicable to the training of power technology personnel's real standard technical ability.
This actual training device is controlled cabinet by a simulation training and is become with a device group; Because simulation training is controlled the replaceable and allotment property of the panel and the cabinet inner structure device of cabinet; Make one to control the manipulation function that cabinet can be accomplished incoming line cabinet, outlet cabinet, metering cabinet, PT cabinet, five kinds of different cabinets of female couplet cabinet; And can control and the trouble hunting operation training installation, wiring, debugging, the low pressure simulation of device and microcomputer protecting device that every kind of cabinet carries out first and second loop of 10KV system, have following characteristics:
1, structurally:
(1) same cabinet can be realized incoming line cabinet, outlet cabinet, metering cabinet, PT cabinet, female five kinds of different cabinet functions of cabinet that join; Because of different components and parts position of opening is arranged on the different cabinet body doors; So design five cover (9) detachable cabinet body doors; Need the cabinet body door of assembling to be contained on the cabinet this real standard when instructing in fact, all the other cabinet doors can vertically be placed on the cabinet door of cabinet side band ball slideway and store in a warehouse indoor.
(2) device in the cabinet need be contained on the mesh plate at cabinet rear; Because the cabinet depth size is installation elements operating difficulties on mesh plate more directly; So designed the movable half tone of forming by twice hinge system in the cabinet; Can in cabinet, move freely upset, move web plate to cabinet the place ahead when installation elements and wiring, can push web plate to the rear side normal position behind the installation work on the completion mesh plate.
There is the element storeroom that is used for storing components and parts at the cabinet rear portion; Screens is equipped with according to the shape of different elements in its inside; Various elements can only be placed on the label that can not misplace and before screens, have this element title in the screens that conforms to its appearance profile, have greatly made things convenient for the management of components and parts.
Floor area is little, is beneficial to transportation and arrangement.
2, on circuit:
(1) device of 10KV primary side is identical with real equipment from function and kind; And have detachability and a replaceability; Can be accompanied by the change of cabinet kind and realize that control requires and real standard operation requirement, its outside leading-out terminal is convenient to wiring, debugging and maintenance.
(2) have perfect comprehensive Microcomputer Protection function, adopted circuit microcomputer protecting device, PT microcomputer protecting device, prepared auto restart and segmentation microcomputer protecting device in the circuit, make the entire circuit system have the excellent protection performance.And these microcomputer protecting devices all can be realized the real standard function of operations such as installation, wiring, debugging, maintenance.
(3) adopt mechanical interlocking device and intelligence behaviour to show device the grid switching operation of system is improved with reliable more, make system have the function of " five is anti-".
(4) system perfecting of circuit can constitute dual power supply prepared auto restart system by nine cabinets.
(5) instrument of secondary side, part category are complete, all can follow the control of primary side to require dismounting arbitrarily and transposing.And can realize the real standard functions of operation such as the distinguishing of instrument, device, installation, wiring, debugging, maintenance to secondary side.
(6) no matter be that primary side or secondary side all can carry out the investigation maintenance that real hardwire trouble hunting and parameter are provided with mistake, truly realized soft, the real standard of hardware inspection operation of electric system most common failure.
Description of drawings
Fig. 1 is that 10KV computer integrated protection system Installation and Debugging actual training device one-piece construction is launched synoptic diagram.
Fig. 2 is that cabinet cabinet body door layout synoptic diagram is controlled in five kinds of emulation, A incoming line cabinet, B metering cabinet, C PT cabinet, D outlet cabinet, female cabinet or the title contact cabinet of joining of E;
Fig. 3 is a device cabinet inner structure synoptic diagram;
Fig. 4 is that movable mesh plate is installed and structural representation;
Fig. 5 is the installation and the wiring external reference synoptic diagram of electric power incoming line cabinet primary side circuit;
Fig. 6 is the installation and the inner synoptic diagram that is connected of wiring of incoming line cabinet primary side circuit;
Fig. 7 is an A portion enlarged drawing among Fig. 5;
Fig. 8 is an A portion auxiliary contact synoptic diagram among Fig. 5;
Fig. 9 is the installation and the wiring external reference synoptic diagram of electric power incoming line cabinet secondary side circuit;
Figure 10 is a B portion enlarged diagram among Fig. 9;
Figure 11 is the inner enlarged diagram of B portion among Fig. 9;
Figure 12 is the installation and the wiring external reference synoptic diagram of metering cabinet primary side circuit;
Figure 13 is the inner synoptic diagram that connects of C portion among Figure 12;
Figure 14 is the installation and the wiring external reference synoptic diagram of PT cabinet primary side circuit;
Figure 15 is the inner synoptic diagram that connects of D portion among Figure 14;
Figure 16 is the installation and the wiring external reference synoptic diagram of outlet cabinet primary side circuit;
Figure 17 is the inner synoptic diagram that connects of E portion among Figure 16;
Figure 18 is an E portion enlarged diagram among Figure 16.
Among the figure, cabinet is controlled in 1 emulation, 2 device cabinets, 3 element storerooms, the little compartment of 3-1,4 cabinet body door storerooms; The 4-1 demarcation strip, 4-2 ball slideway, 5 cabinet body doors, device installation room in the 6 movable mesh plates, 7 cabinets; 7-1 device installation room inwall, 7-2 hinge, 8 incoming line cabinets, 8-1 mimic-disconnecting switch assembly, 8-2 JS type mechanical locking device; 8-3 analog current transformer component, 8-4 simulates switch component, 8-5 zero sequence current mutual inductor assembly, 8-6 analogue ground switch module, 8-7 simulates lightning arrester assembly; 9 metering cabinets, 10 PT cabinets, 11 outlet cabinets, 11-1 mimic-disconnecting switch assembly, 11-2 JS type mechanical locking device; 11-3 analog current transformer component, 11-4 simulates switch component, 11-5 zero sequence current mutual inductor assembly, 11-6 analogue ground switch module, 11-7 simulates lightning arrester assembly.
Specify the connection and the use of this Installation and Debugging actual training device below in conjunction with accompanying drawing.
Embodiment
Embodiment 1:
As shown in Figure 1; The 10KV computer integrated protection system Installation and Debugging actual training device that the utility model provides; Comprise and adopt the emulation of the actual cabinet operating structure design of the general KYN28A-12 type in power industry scene to control cabinet 1; Emulation is controlled cabinet cabinet front and is required to be provided with five cover (referring to Fig. 2) removable and replaceable formula emulation cabinet body doors 5 according to incoming line cabinet, outlet cabinet, metering cabinet, PT cabinet and female cabinet that joins cabinet respectively; In the cabinet is device installation room 7; Be provided with the movable mesh plate 6 that is used for installation elements in the device installation room, this activity mesh plate is gone up (centre of described movable mesh plate can also install a combined page additional processes two fan doubling formula activity mesh plates, referring to Fig. 4) through the inwall 7-1 that hinge 7-2 is movably arranged on device installation room in the cabinet; This actual training device also comprises a device cabinet 2 that is used to store real standard device and cabinet body door; This device cabinet set inside becomes element storeroom 3 and cabinet body door storeroom 4 two parts (referring to Fig. 3); Be separated into little compartment 3-1 again according to institute's memory element kind in the element storeroom; Size according to cabinet body door in the cabinet body door storeroom is provided with a component dividing plate 4-1, is provided with ball slideway 4-2 between the adjacent separator plates.
The whole cabinet that cabinet and device cabinet can be processed a disjunctor is controlled in described emulation, and the device cabinet is arranged at the back side that cabinet is controlled in emulation.
Need the cabinet body door of assembling to be contained in emulation this real standard during real the standard and control on the cabinet cabinet, all the other cabinet body doors can vertically be placed on emulation and control in the cabinet body door storeroom in the device cabinet of the cabinet back side.Its inside of device cabinet can be provided with corresponding screens in that septulum is indoor according to the shape of different elements; Various elements can only be placed on the label that can not misplace and before screens, have this element title in the screens that conforms to its appearance profile, have greatly made things convenient for the management of components and parts.
The concrete connection reference diagram of Installation and Debugging actual training device is following:
One, incoming line cabinet
The installation of primary side circuit and wiring, with reference to figure 5 to Fig. 8, wherein; Fig. 5 is outside synoptic diagram, and Fig. 6 is the inner synoptic diagram that connects, and Fig. 7 is an A portion enlarged drawing among Fig. 5; Fig. 8 is an A portion auxiliary contact synoptic diagram among Fig. 5, and Sba is the disconnector auxiliary contact, and SBb is the grounding switch auxiliary contact.
The installation of secondary side circuit and wiring, to Figure 11, wherein Fig. 9 is outside synoptic diagram with reference to figure 9, and Figure 10 is a B portion enlarged diagram among Fig. 9, and Figure 11 is the inner enlarged diagram of B portion among Fig. 9.
Two, metering cabinet
The installation of primary side circuit and wiring are the inner synoptic diagram that connects of C portion among Figure 12 with reference to the outside synoptic diagram of Figure 12, Figure 13.
Three, PT cabinet
The installation of primary side circuit and wiring are the inner synoptic diagram that connects of D portion among Figure 14 with reference to the outside synoptic diagram of Figure 14, Figure 15.
Four, outlet cabinet
The installation of primary side circuit and wiring are the inner synoptic diagram that connects of E portion among Figure 16 with reference to the outside synoptic diagram of Figure 16, Figure 17, and Figure 18 is an E portion enlarged diagram among Figure 16.

Claims (3)

1. 10KV computer integrated protection system Installation and Debugging actual training device; It is characterized in that this actual training device comprises that the emulation of adopting the on-the-spot general actual cabinet operating structure of KYN28A-12 type of power industry to design controls cabinet; Emulation is controlled cabinet cabinet front and is provided with five cover removable and replaceable formula emulation cabinet body doors; Be respectively incoming line cabinet cabinet body door, outlet cabinet cabinet body door, metering cabinet cabinet body door, PT cabinet cabinet body door and female cabinet cabinet body door that joins; Be provided with the movable mesh plate that is used for installation elements in the cabinet, this activity mesh plate is movably arranged on the cabinet madial wall through hinge; This actual training device also comprises a device cabinet that is used to store real standard device and cabinet body door; This device cabinet set inside becomes element storeroom and cabinet body door storeroom two parts; Be separated into little compartment again according to institute's memory element kind in the element storeroom; Size according to cabinet body door in the cabinet body door storeroom is provided with a component dividing plate, is provided with ball slideway between the adjacent separator plates.
2. 10KV computer integrated protection according to claim 1 system Installation and Debugging actual training device is characterized in that described emulation controls the whole cabinet that cabinet and device cabinet are processed a disjunctor, and the device cabinet is arranged at the back side that cabinet is controlled in emulation.
3. 10KV computer integrated protection according to claim 1 and 2 system Installation and Debugging actual training device, the centre that it is characterized in that described movable mesh plate adds a combined page and processes two fan doubling formula activity mesh plates.
CN2010206689053U 2010-12-20 2010-12-20 10kV microcomputer comprehensive protection installation and debugging training device Expired - Fee Related CN202120463U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206689053U CN202120463U (en) 2010-12-20 2010-12-20 10kV microcomputer comprehensive protection installation and debugging training device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206689053U CN202120463U (en) 2010-12-20 2010-12-20 10kV microcomputer comprehensive protection installation and debugging training device

Publications (1)

Publication Number Publication Date
CN202120463U true CN202120463U (en) 2012-01-18

Family

ID=45461511

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206689053U Expired - Fee Related CN202120463U (en) 2010-12-20 2010-12-20 10kV microcomputer comprehensive protection installation and debugging training device

Country Status (1)

Country Link
CN (1) CN202120463U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106683527A (en) * 2017-01-06 2017-05-17 广西电网有限责任公司桂林供电局 Multifunctional installation and wiring training device for electric energy meter and mutual inductor

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106683527A (en) * 2017-01-06 2017-05-17 广西电网有限责任公司桂林供电局 Multifunctional installation and wiring training device for electric energy meter and mutual inductor

Similar Documents

Publication Publication Date Title
CN201673222U (en) Portable power system fault recorder
CN204630594U (en) A kind of data-adjustable harvester
CN202120463U (en) 10kV microcomputer comprehensive protection installation and debugging training device
CN110400501A (en) A kind of relay protection teaching and training system
CN201590683U (en) Distributed local control structure of control and protection system of converter station
CN103077631B (en) Training device for three-phase circuit breaker spring operation mechanism
CN202978733U (en) Power distribution network device
CN207884086U (en) A kind of movable low-pressure power distribution cabinet
CN203747263U (en) Lithium battery backup power supply cabinet
CN106194686A (en) The double Frequency Drive Control all-in-one of a kind of air compressor machine
CN111682404A (en) 10kV power system neutral point movable small resistor complete grounding device
CN106685088A (en) Anti-misoperation system for secondary plate pressing of electric protection device
CN201382998Y (en) Online monitoring screen for electric energy error of multi-loop electric energy meter
DE102009008806A1 (en) Portable electronic device and adapter for it
CN205486932U (en) Real standard machine of track traffic subway power supply relay protection teaching
CN207719690U (en) Pressure relieving cooling type movable type Double-electric source automatic switching box
CN203871677U (en) Integrated 2U central office terminal cabinet
CN201528135U (en) Low-voltage fixed-interval switch cabinet
CN209786583U (en) Box-type substation
CN201289967Y (en) Distribution box for base station
CN216564143U (en) Portable variable voltage power box special for test
CN104201741A (en) Back type emergency power supply
CN204835222U (en) A exchange first cabinet of row for communication
CN107835596B (en) Portable send out and become group protection backstage management industrial computer device
CN207038952U (en) A kind of High-Voltage Electrical Appliances cabinet being easily installed

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120118

Termination date: 20141220

EXPY Termination of patent right or utility model