CN202108648U - Hydraulic power generation system with water channel paved in the middle of riverbed - Google Patents

Hydraulic power generation system with water channel paved in the middle of riverbed Download PDF

Info

Publication number
CN202108648U
CN202108648U CN2011202383626U CN201120238362U CN202108648U CN 202108648 U CN202108648 U CN 202108648U CN 2011202383626 U CN2011202383626 U CN 2011202383626U CN 201120238362 U CN201120238362 U CN 201120238362U CN 202108648 U CN202108648 U CN 202108648U
Authority
CN
China
Prior art keywords
water
water channel
waterwheel
riverbed
driving belt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202383626U
Other languages
Chinese (zh)
Inventor
蒋明刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011202383626U priority Critical patent/CN202108648U/en
Application granted granted Critical
Publication of CN202108648U publication Critical patent/CN202108648U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Hydraulic Turbines (AREA)
  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)

Abstract

The utility model discloses a hydraulic power generation system with a water channel paved in the middle of a riverbed. The water channel is paved in the middle of the riverbed surface, water-storage and flood-discharge gates are arranged on two sides of the water channel, two pairs of generator sets with speed changing devices are arranged at the upper end of the water channel and the lower end of the water channel from front to back, and generator set fixing piles are distributed and fixed on two sides of the water channel. A transmission support is arranged between the two pairs of generator sets, the two pairs of generator sets are connected with the transmission support through a driving belt, and a sensing device is arranged on one side of the water channel. A water cart enters the water channel to be fixed through a water cart fixing plate, a water cart clamping hand clamps the driving belt, water blocking plates on two sides of the water cart and the bottom surface of the water cart are opened, and the water cart drives the driving belt to slide to the position of the sensing device at the downstream. A water cart sensing receiver is started, the water cart clamping hand is loosened, and simultaneously another water cart enters and slides towards the downstream. The hydraulic power generation system with the water channel paved in the middle of the riverbed solves the problems of water level rising, migration relocation and land submergence caused by damming and water storage for hydraulic power generation, is reasonable in design and layout, and cannot cause water level rising to migrate and submerge land.

Description

Laid water channel road hydroelectric power system in the middle of the riverbed
Technical field
The utility model relates to the power generation system technical field, specifically belongs to the middle water channel road hydroelectric power system of laying in riverbed.
Background technique
With the growth of main electricity needs, the expansion of electric energy application area, the needs of producing electricity increase rapidly.The approach of existing generating is a lot, mainly contains fire coal or oil and drives turbine generation, leans on hydroelectric power, and also some leans on solar energy, wind energy and tidal power generation to utilize the kinetic energy of current and the small hydropower station that potential energy produces electric energy.The dam retaining need be built in existing water-energy generating electricity station, causes water level to rise, migrates resettlement, floods the soil, has potential safety hazard.
The model utility content
The purpose of the utility model was laid water channel road hydroelectric power system in the middle of providing the riverbed; Solved the problem that water generating constructs a dam to store water and causes water level to rise, migrate resettlement, flood the soil; Layout is reasonable; Break through traditional water conservancy generating notion, can not cause water level to rise and migrate and flood the soil.
The technological scheme that the utility model adopts is following:
Laid water channel road hydroelectric power system in the middle of the riverbed, this system is located on the big or small riverbed, is chosen on 1000 meters to 2000 meters of the riverbed straightways; The water channel road was laid by described this system in the middle of the face in the riverbed, cross both sides, water channel road the retaining floodgate is set, and went up water contraction passing through water channel road, whole piece river course as far as possible and flowed out; Form power source, cross the upper reaches, water channel road and be provided with filter screen, cross the generator set that water channel road upper/lower terminal is provided with the two pairs of band speed change gears in front and back; Generator set is fixed on the unit fixing stake, and the unit fixing stake distributes and was fixed in both sides, water channel road, is provided with channel between the homonymy generator set fixing stake and adds high-wall; Be provided with transmission bracket between two pairs of generator set, two pairs of generator set are connected through driving belt with transmission bracket, cross water channel road one side behind the generator set of band speed change gear and are provided with induction installation; Front end generator set fixing stake is provided with the waterwheel fixed plate, and waterwheel got into the water channel road through the waterwheel fixed plate and fixes, and waterwheel driving belt draft arm tong clamps driving belt; Waterwheel both sides and bottom surface water resistant plate are opened; Waterwheel drives driving belt and slides into induction installation position, downstream, and the waterwheel inducing receiver starts, and driving belt draft arm tong folder unclamps; Another waterwheel of the upper reaches begins to slide simultaneously, drives driving belt power is provided continuously.
Described waterwheel both sides and bottom surface are provided with contractile water resistant plate; The waterwheel rear end is movably installed with the driving belt draft arm; Driving belt draft arm upper end has the hydraulic control tong, and the back segment both sides of waterwheel are installed with the waterwheel fixed arm, and waterwheel fixed arm upper end has the hydraulic control tong; Be provided with inducing receiver after being against the waterwheel fixed arm, the waterwheel vehicle body absorbs water more than 2/3rds.
Described transmission bracket is provided with drive regulating.
Described channel adds and evenly is distributed with a plurality of reinforcings stake on the high-wall.
Compared with present technology, the beneficial effect of the utility model is following:
The utility model compare existing hydroelectric system, needn't be busy at putting up installations, construct a dam to store water, can obtain clean energy resource through water conservancy.Can not cause water level too much to rise, need not migrate, the downstream, riverbed are not produced harm, safe and reliable.
Description of drawings
Fig. 1 is the plan structure schematic representation of the utility model;
Fig. 2 is the side-looking structural representation of the utility model;
Fig. 3 is the waterwheel structural representation of the utility model.
Embodiment
Referring to accompanying drawing, laid water channel road hydroelectric power system in the middle of the riverbed, this system is located on the big or small riverbed; Be chosen on 1000 meters to 2000 meters of the riverbed straightways, water channel road 1 was laid by this system in the middle of the face in the riverbed, cross 1 both sides, water channel road retaining floodgate 2 is set; Cross 1 upper reaches, water channel road and be provided with filter screen 3, the generator set 4 of two pairs of band speed change gears before and after being provided with behind the retaining floodgate 2, generator set 4 is fixed on the unit fixing stake 5; Unit fixing stake 5 distributes and was fixed in 1 both sides, water channel road, is provided with channel between homonymy generator set 4 fixing stakes and adds high-wall 6, and channel adds and evenly is distributed with a plurality of reinforcing 7 on the high-wall 6; Be provided with transmission bracket 8 between two pairs of generator set 4, transmission bracket 8 is provided with 9, two pairs of generator set 4 of drive regulating and is connected through driving belt 10 with transmission bracket 8; Generator set 4 backs of band speed change gear are crossed water channel road one side and are provided with induction installation 11; Front end generator set fixing stake is provided with waterwheel fixed plate 12, and it is fixing fixing by waterwheel fixed arm 14 that waterwheel 13 got into the water channel road through waterwheel fixed plate 13, and waterwheel driving belt draft arm 15 tongs clamp driving belt 10; Waterwheel both sides and bottom surface water resistant plate 16 are opened; Waterwheel drives driving belt 10 and slides into downstream induction installation 11 positions, and waterwheel inducing receiver 17 starts, and driving belt draft arm 15 tongs folder unclamps; Another waterwheel of the upper reaches begins to slide simultaneously, drives driving belt power is provided continuously.Waterwheel pulling driving belt drives speed change gear, through the conversion of speed change gear, for generator set provides needed motion speed, produces electric energy.Can open the retaining floodgate in rainy season and discharge water, shut the retaining floodgate during dry season water collection at the upper reaches is passed through through a narrower water channel road of crossing.

Claims (4)

1. laid water channel road hydroelectric power system in the middle of the riverbed, this system is located on the big or small riverbed, is chosen on 1000 meters to 2000 meters of the riverbed straightways; It is characterized in that: the water channel road was laid by described this system in the middle of the face in the riverbed, cross both sides, water channel road the retaining floodgate is set, and crossed the upper reaches, water channel road and was provided with filter screen; Cross the generator set that water channel road upper/lower terminal is provided with the two pairs of band speed change gears in front and back, generator set is fixed on the unit fixing stake, and the unit fixing stake distributes and was fixed in both sides, water channel road; Be provided with channel between the homonymy generator set fixing stake and add high-wall, be provided with transmission bracket between two pairs of generator set, two pairs of generator set are connected through driving belt with transmission bracket; Cross water channel road one side behind the generator set of band speed change gear and be provided with induction installation; Front end generator set fixing stake is provided with the waterwheel fixed plate, and waterwheel got into the water channel road through the waterwheel fixed plate and fixes, and waterwheel driving belt draft arm tong clamps driving belt; Waterwheel both sides and bottom surface water resistant plate are opened; Waterwheel drives driving belt and slides into induction installation position, downstream, and the waterwheel inducing receiver starts, and driving belt draft arm tong folder unclamps; Another waterwheel begins to be slided downstream by the upper reaches simultaneously, drives driving belt power is provided continuously.
2. according to laying water channel road hydroelectric power system in the middle of the said riverbed of claim 1; It is characterized in that: described waterwheel both sides and bottom surface are provided with contractile water resistant plate; The waterwheel rear end is movably installed with the driving belt draft arm, and driving belt draft arm upper end has the hydraulic control tong, and the back segment both sides of waterwheel are installed with the waterwheel fixed arm; Waterwheel fixed arm upper end has the hydraulic control tong, is provided with inducing receiver after being against the waterwheel fixed arm.
3. according to laying water channel road hydroelectric power system in the middle of the said riverbed of claim 1, it is characterized in that: described transmission bracket is provided with drive regulating.
4. according to laying water channel road hydroelectric power system in the middle of the said riverbed of claim 1, it is characterized in that: described channel adds and evenly is distributed with a plurality of reinforcing on the high-wall.
CN2011202383626U 2011-07-06 2011-07-06 Hydraulic power generation system with water channel paved in the middle of riverbed Expired - Fee Related CN202108648U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202383626U CN202108648U (en) 2011-07-06 2011-07-06 Hydraulic power generation system with water channel paved in the middle of riverbed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202383626U CN202108648U (en) 2011-07-06 2011-07-06 Hydraulic power generation system with water channel paved in the middle of riverbed

Publications (1)

Publication Number Publication Date
CN202108648U true CN202108648U (en) 2012-01-11

Family

ID=45434085

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202383626U Expired - Fee Related CN202108648U (en) 2011-07-06 2011-07-06 Hydraulic power generation system with water channel paved in the middle of riverbed

Country Status (1)

Country Link
CN (1) CN202108648U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296579A (en) * 2011-07-06 2011-12-28 蒋明刚 Hydroelectric power generation system with water channel paved in middle of riverbed
CN115262501A (en) * 2022-07-03 2022-11-01 庞宏强 Water channel type dam-building-free hydroelectric generation system capable of expanding capacity as required

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296579A (en) * 2011-07-06 2011-12-28 蒋明刚 Hydroelectric power generation system with water channel paved in middle of riverbed
CN115262501A (en) * 2022-07-03 2022-11-01 庞宏强 Water channel type dam-building-free hydroelectric generation system capable of expanding capacity as required

Similar Documents

Publication Publication Date Title
CN101649813B (en) Integrated system for generating electricity by current, sea wave as well as tide kinetic energy and wind and solar energy
CN204578439U (en) A kind of hydroelectric station device of solar generating
CN101932823A (en) Complex ocean power system combining sluice power and ocean current power
CN201502481U (en) Cycling water pumping energy-storage power generating device
CN202323895U (en) Tail water channel structure for stepped hydro-junction
CN202140234U (en) Symmetrical rotation type wave energy generating system
CN202108648U (en) Hydraulic power generation system with water channel paved in the middle of riverbed
CN104265549A (en) Water wheel type generator set and power station
CN204877766U (en) Automatic paddle that opens and shuts of hydraulic turbine
CN204612186U (en) A kind of power station anti-icing equipment
WO2023087815A1 (en) Marine water storage and tidal water storage dual-purpose power station
CN104653388A (en) Floating waterwheel generating device
CN102296579A (en) Hydroelectric power generation system with water channel paved in middle of riverbed
CN202284515U (en) Pipeline type hydropower station
CN205036497U (en) Middle -size and small -size river power generation facility
CN201678985U (en) Sustained utilizing device for running water resources of seasonal river
CN103114955B (en) A kind of giant caterpillar formula river closure generating ship
CN202323893U (en) Hydroelectric power station capable of being built densely
TW201741549A (en) Tidal power generation device characterized by using the change of tide to generate different flow speeds so as to adjust the force area of the water wheel module, thereby stabilizing the power generation efficiency of the power generator
CN102691282B (en) Non-dam high-power power generation system in big river
CN204253260U (en) Flow type hydraulic power generation device
CN101021196A (en) Gantry frame type non-dam scoop blade rotary wheel hydraulic power generator
CN203584671U (en) Wave power generation device
CN103161142A (en) Two-way underwater power generation gate dam established in water of existing reservoir area
CN202531341U (en) Hydroelectric generator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120111

Termination date: 20140706

EXPY Termination of patent right or utility model