CN202107709U - Hot splashing slag box system - Google Patents

Hot splashing slag box system Download PDF

Info

Publication number
CN202107709U
CN202107709U CN2011201328462U CN201120132846U CN202107709U CN 202107709 U CN202107709 U CN 202107709U CN 2011201328462 U CN2011201328462 U CN 2011201328462U CN 201120132846 U CN201120132846 U CN 201120132846U CN 202107709 U CN202107709 U CN 202107709U
Authority
CN
China
Prior art keywords
hot application
slag case
application slag
hot
concrete partition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201328462U
Other languages
Chinese (zh)
Inventor
王皎月
江善明
李元廷
谢华强
范尚东
宋建华
张华�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dazhou Iron and Steel Group Co Ltd
Original Assignee
Dazhou Iron and Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dazhou Iron and Steel Group Co Ltd filed Critical Dazhou Iron and Steel Group Co Ltd
Priority to CN2011201328462U priority Critical patent/CN202107709U/en
Application granted granted Critical
Publication of CN202107709U publication Critical patent/CN202107709U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B2400/00Treatment of slags originating from iron or steel processes
    • C21B2400/02Physical or chemical treatment of slags
    • C21B2400/022Methods of cooling or quenching molten slag
    • C21B2400/026Methods of cooling or quenching molten slag using air, inert gases or removable conductive bodies
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B2400/00Treatment of slags originating from iron or steel processes
    • C21B2400/05Apparatus features
    • C21B2400/066Receptacle features where the slag is treated
    • C21B2400/072Tanks to collect the slag, e.g. water tank
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies

Landscapes

  • Manufacture Of Iron (AREA)

Abstract

The utility model relates to the field of steelmaking equipment, in particular to a hot splashing slag box system which comprises joint supports, a concrete partition wall and a hot splashing slag box arranged on the ground, wherein the joint supports are fixed with the outer wall of the hot splashing slag box and the outer wall of the concrete partition wall through bolts. In the hot splashing slag box system provided by the embodiment of the utility model, the hot splashing slag box and the joint supports as well as the joint supports and the concrete partition wall are fixed through bolts, so that the phenomenon of weld joint bursting due to huge expansion force generated by chemical reaction and saturated steam expansion force is avoided, which effectively prolongs the service life of the hot splashing slag box system.

Description

A kind of hot application slag case system
Technical field
The utility model relates to the steelmaking equipment field, more particularly, relates to a kind of hot application slag case system.
Background technology
The output of the hot application slag in the converter steelmaking system is bigger, and usually those skilled in the art adopt hot application slag case system that the hot application slag is handled, below the brief account structure of hot application slag case system once.
Hot application slag case of the prior art system comprises hot application slag case, connects support, concrete partition and refractory brick; Wherein the height of hot application slag case is 4000mm, and thickness is 25mm, and the sidewall of hot application slag case is welded in the connection support; Connect to support and then be welded on the built-in fitting of concrete partition; In order to make the thermal shock resistance of hot application slag system better, often build refractory brick by laying bricks or stones in the gap between the outer side wall of concrete partition and hot application slag case; Also be provided with a water vent in the bottom of hot application slag case, so that water coolant is discharged smoothly.
The working process of above-mentioned hot application slag case system handles hot application slag is following: the hot application slag in the converter is poured in the hot application slag case; Then, in hot application slag case, spray water, make pyritous hot application slag be cooled to 300~800 ℃, produced a large amount of saturation steams; Simultaneously, following chemical reaction takes place with water in free calcium oxide (f-CaO) in the hot application slag and free magnesium (f-MgO):
F-CaO+H 2O → Ca (OH) 2Volumetric expansion 97.8%
F-MgO+H 2O → Mg (OH) 2Volumetric expansion 148%
Because the huge bulging force that produces in the above-mentioned chemical reaction process, and then make the hot application slag produce cracking, efflorescence and the isolating phenomenon of slag iron.
Because the huge bulging force that the bulging force of above-mentioned saturation steam and chemical reaction produce acts on the inwall of hot application slag case; Cause hot application slag case and be connected the weld seam between supporting and connect the phenomenon that bursting appears in the weld seam between support and the built-in fitting, thereby make that the life-span of hot application slag case system is shorter.
Therefore, how to make hot application slag case system life-span length be those skilled in the art's technical issues that need to address.
The utility model content
The purpose of the utility model provides a kind of hot application slag case system, to prolong the life-span of hot application slag case system.
For realizing above-mentioned technical problem, the utility model offers following technical scheme:
A kind of hot application slag case system comprises the hot application slag case that connects support, concrete partition and be positioned over ground, and outer wall and said concrete partition that said connection is supported all with said hot application slag case pass through bolt.
Preferably, said concrete partition has the connecting hole that connects along thickness direction, and bolt passes said connecting hole one end and the said support fixation that is connected, the shim that the other end is outer with being stuck in said connecting hole.
Preferably, said connection is supported for joist steel, and two flange plates that said connection is supported are fixed with said hot application slag case and said concrete partition respectively.
Preferably, build refractory brick by laying bricks or stones in the gap between said hot application slag case outer side wall and the said concrete partition.
Preferably, said hot application slag case height is 500mm.
Preferably, the thickness of said hot application slag case sidewall is 50mm.
Preferably, the gradient of said hot application slag case bottom interior surface is 0.03.
Preferably, have at least two water vents bottom the said hot application slag case.
Preferably, ground, said hot application slag case bottom is compacting ground, and the pre-buried steel billet in bottom on said compacting ground.
Preferably, be filled with pebbles between said ground and the said hot application slag case.
Can find out from technique scheme; Outer wall and concrete partition that the utility model embodiment provides the connection of hot application slag case system to support all with hot application slag case pass through bolt; Cause the phenomenon that weld seam bursts with regard to having avoided because saturation steam bulging force and chemical reaction produce the effect of huge bulging force like this, thereby prolonged the life-span of hot application slag case system effectively.
Description of drawings
The structural representation of the hot application slag case system that Fig. 1 is provided for the utility model embodiment.
Embodiment
The purpose of the utility model provides a kind of hot application slag case system, to prolong the life-span of hot application slag case system.
To combine the accompanying drawing among the utility model embodiment below, the technical scheme among the utility model embodiment is carried out clear, complete description, obviously, described embodiment only is the utility model part embodiment, rather than whole embodiment.Based on the embodiment in the utility model, all other embodiment that those of ordinary skills are obtained under the prerequisite of not making creative work belong to the protection domain of the utility model.
Please refer to Fig. 1, the structural representation of the hot application slag case system that Fig. 1 is provided for the utility model embodiment.
The hot application slag case system that the utility model provides comprises the hot application slag case 1 that connects support 2, concrete partition 4 and be positioned over ground; Wherein hot application slag case 1 normally is welded by heat-resisting steel sheet and plate; Can certainly adopt other material, can under hot environment, work as long as guarantee hot application slag case 1; Connect to support 2 and all pass through bolt with the outer wall and the concrete partition 4 of hot application slag case 1.Since adopt in the hot application slag case system that provided of the utility model embodiment bolt connect respectively with hot application slag case 1 with is connected support 2 be connected support 2 and concrete partition 4 is fixed; Therefore this causes the phenomenon that weld seam bursts with regard to having been avoided because saturation steam bulging force and chemical reaction produce the effect of huge bulging force, thereby has prolonged the life-span of hot application slag case system effectively.
In order to make that bolt is easy to connect between connection support 2 and the concrete partition 4; The connecting hole that connects along thickness direction can be set on concrete partition 4; Bolt passes connecting hole, and an end is fixed with being connected support 2, and the other end backing plate 5 outer with being stuck in connecting hole fixed.Normal conditions; Those skilled in the art can make backing plate 5 fasten connecting hole fully; So make connect support 2 with concrete partition 4 between is connected stablely, reliably, can certainly be that backing plate 5 not exclusively fastens connecting hole, need only and can realize identical technique effect.
In addition, those skilled in the art select for use joist steel to support 2 as connecting usually, the preferred I25a that uses in the present embodiment, and two flange plates that will connect support 2 like this are fixing with concrete partition 4 with hot application slag case 1 respectively.
In order to improve the thermal shock resistance of hot application slag system, build refractory brick 3 by laying bricks or stones in the preferred gap between the outer side wall of concrete partition 4 and hot application slag case 1 among the utility model embodiment, can certainly fill other lagging material.
Because the area of the steel plate of hot application slag case 1 sidewall makes that than conference the distortion of hot application slag case 1 is comparatively serious; Thereby make that the life-span of hot application slag case system is lower; Therefore in order further to prolong the life-span of hot application slag case system; Those skilled in the art can hot application slag case 1 height be set to less value, preferably be set to 500mm among the utility model embodiment.Also can be on the basis of the foregoing description that the sidewall thickness setting of hot application slag case 1 is thicker; The wall thickness increase also can slow down the distortion of hot application slag case 1 effectively; Improve the life-span of hot application slag case system, the sidewall thickness of preferred hot application slag case 1 is set to be 50mm among the utility model embodiment.Certainly the height that also is not limited to hot application slag case 1 is set to 500mm, and wall thickness is set to 50mm, as long as can slow down 1 distortion of hot application slag case.
Smooth and easy in order to make that water coolant refluxes, the gradient of bottom interior surface that can hot application slag case 1 is set to 0.03.Water coolant just can flow out comparatively smoothly like this, occurs the accident of setting off firecrackers thereby slowed down high temperature hot application slag because of ponding, has improved hot application slag processing security.
In addition, can also at least two water vents be set in the bottom of hot application slag case 1, with respect to water vent in the prior art, the quantity that increases water vent can be so that water coolant refluxes more smooth and easy; 50 water vents preferably are set among the utility model embodiment; Can also drainage channel be set on water vent, make cooling-water flowing, mediation district and filtration unit can also be set on drainage channel, prevent that drainage channel from stopping up, and prevents that also water coolant from effluxing contaminate environment to preposition.
Usually those skilled in the art can also tamp the ground of hot application slag case 1 bottom, because the ground of hot application slag case 1 bottom is compacting ground, and the pre-buried steel billet in bottom on compacting ground.Thereby damage the ground of hot application slag case 1 bottom when in hot application slag treating processes, avoiding installing slagging-off, and then make the water coolant water exhaust system remain state comparatively smoothly.In the utility model embodiment, the steel billet that section is 150mm * 150mm preferably is set, can certainly adopt the steel billet of other model, as long as can reach identical technique effect.Certainly in the utility model embodiment, can also between the ground of hot application slag case 1 bottom and hot application slag case, fill pebbles.
To the above-mentioned explanation of the disclosed embodiments, be that this area professional and technical personnel can realize or use the utility model.Multiple modification to these embodiment will be conspicuous concerning those skilled in the art, and defined General Principle can realize under the situation of spirit that does not break away from the utility model or scope in other embodiments among this paper.Therefore, the utility model will can not be restricted to these embodiment shown in this paper, but will accord with principle disclosed herein and features of novelty the wideest corresponding to scope.

Claims (10)

1. hot application slag case system comprises connecting the hot application slag case (1) that supports (2), concrete partition (4) and be positioned over ground, it is characterized in that, said connection support (2) is all passed through bolt with the outer wall and the said concrete partition (4) of said hot application slag case (1).
2. hot application slag case as claimed in claim 1 system; It is characterized in that; Said concrete partition (4) has the connecting hole that connects along thickness direction, and bolt passes said connecting hole one end and said to be connected supports (2) fixing, and the other end is fixed with the backing plate (5) that is stuck in outside the said connecting hole.
3. hot application slag case as claimed in claim 2 system is characterized in that, (2) are supported in said connection be joist steel, and two flange plates that (2) are supported in said connection are fixed with said hot application slag case (1) and said concrete partition (4) respectively.
4. like each described hot application slag case system of claim 1 to 3, it is characterized in that, build refractory brick (3) by laying bricks or stones in the gap between said hot application slag case (1) outer side wall and the said concrete partition (4).
5. like each described hot application slag case system of claim 1 to 3, it is characterized in that said hot application slag case (1) highly is 500mm.
6. hot application slag case as claimed in claim 5 system is characterized in that the thickness of said hot application slag case (1) sidewall is 50mm.
7. like each described hot application slag case system of claim 1 to 3, it is characterized in that the gradient of said hot application slag case (1) bottom interior surface is 0.03.
8. like each described hot application slag case system of claim 1 to 3, it is characterized in that said hot application slag case (1) bottom has at least two water vents.
9. like each described hot application slag case system of claim 1 to 3, it is characterized in that ground, said hot application slag case (1) bottom is compacting ground, and the pre-buried steel billet in bottom on said compacting ground.
10. hot application slag case as claimed in claim 9 system is characterized in that, is filled with pebbles between said ground and the said hot application slag case (1).
CN2011201328462U 2011-04-29 2011-04-29 Hot splashing slag box system Expired - Fee Related CN202107709U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201328462U CN202107709U (en) 2011-04-29 2011-04-29 Hot splashing slag box system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201328462U CN202107709U (en) 2011-04-29 2011-04-29 Hot splashing slag box system

Publications (1)

Publication Number Publication Date
CN202107709U true CN202107709U (en) 2012-01-11

Family

ID=45433151

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201328462U Expired - Fee Related CN202107709U (en) 2011-04-29 2011-04-29 Hot splashing slag box system

Country Status (1)

Country Link
CN (1) CN202107709U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110714105A (en) * 2019-10-29 2020-01-21 宣化钢铁集团有限责任公司 Long-life converter liquid steel slag retaining wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110714105A (en) * 2019-10-29 2020-01-21 宣化钢铁集团有限责任公司 Long-life converter liquid steel slag retaining wall
CN110714105B (en) * 2019-10-29 2024-03-01 宣化钢铁集团有限责任公司 Liquid steel slag retaining wall of converter with long service life

Similar Documents

Publication Publication Date Title
CN103628680B (en) Large steel space truss hanging layer construction method
CN201648409U (en) Tank for disintegrating steel-making high-temperature furnace slag
CN103276130A (en) Maintenance method for air leakage from pipeline of hot-air system of blast furnace
CN201746572U (en) Composite sliding brick for sliding steel outlet of converter
CN101205566B (en) Mechanical sealing device for movable smoke hood of converter vaporization cooling system
CN202107709U (en) Hot splashing slag box system
CN102183148A (en) Process for repairing thermal insulating layer in a pipeline of heating furnace
CN206052060U (en) The heat-insulated hot splashing slag railway carriage or compartment of overhead type
CN212720899U (en) Furnace body structure of ore-smelting electric furnace
CN201288197Y (en) Blast furnace cyclone dust extractor
CN108396961B (en) Construction joint formwork erection method between a kind of dual wall
CN105349716A (en) Fixation device for plate blanks of slag-disintegrating pit
CN202849448U (en) Slag pit billet fixing device
CN201386113Y (en) Cantilever type smoke baffle wall
CN208072929U (en) Scaffold wall connecting piece
CN205242407U (en) A cluster pipe, chute combination system for deep basal pit concrete placement
CN204459585U (en) Non-metal expansion joint
CN206418507U (en) A kind of attachment structure of tie-rod and steel pipe support
CN210089395U (en) Water-cooled furnace cover of submerged arc furnace
CN205223285U (en) Novel hydro -cylinder of converter pushing off slag mechanism
CN201102937Y (en) Equipment for heat treatment of melted steel scoria
CN202808559U (en) Novel bottom structure for tank furnace
CN206539019U (en) The trapezoidal reserved cartridge of aluminum alloy pattern plate tool-type
CN220686520U (en) Waterproof construction is exempted from to wear by roofing slag layer blast pipe
CN201136878Y (en) Mechanical sealing device for movable smoke hood of converter vaporization cooling system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120111

Termination date: 20150429

EXPY Termination of patent right or utility model