CN102183148A - Process for repairing thermal insulating layer in a pipeline of heating furnace - Google Patents

Process for repairing thermal insulating layer in a pipeline of heating furnace Download PDF

Info

Publication number
CN102183148A
CN102183148A CN 201110088980 CN201110088980A CN102183148A CN 102183148 A CN102183148 A CN 102183148A CN 201110088980 CN201110088980 CN 201110088980 CN 201110088980 A CN201110088980 A CN 201110088980A CN 102183148 A CN102183148 A CN 102183148A
Authority
CN
China
Prior art keywords
layer
steel
heating furnace
pipeline
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201110088980
Other languages
Chinese (zh)
Inventor
杨福瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Taigang Stainless Steel Co Ltd
Original Assignee
Shanxi Taigang Stainless Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Taigang Stainless Steel Co Ltd filed Critical Shanxi Taigang Stainless Steel Co Ltd
Priority to CN 201110088980 priority Critical patent/CN102183148A/en
Publication of CN102183148A publication Critical patent/CN102183148A/en
Pending legal-status Critical Current

Links

Landscapes

  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

加热炉管道内隔热层修复方法,属于冶金、炉业、热力管道的维修领域,主要用于加热炉空气、煤气管道内隔热层的维修,它包括下述步骤:ⅰ、拆除损坏部位;ⅱ、在金属管内壁上焊接安装Y型锚固钩;ⅲ、在金属管道内壁粘贴30mm厚的纤维毯进行隔热,并用塑料膜覆盖;ⅳ、最后用人工投射法将纤维浇注料整体浇注。本发明普通力工就可以施工,且施工工期明显缩短,尤其是在管道弯头及异型部位,采用本发明维修后的使用寿命由3年提高到10年以上。The method for repairing the heat insulation layer in the heating furnace pipeline belongs to the maintenance field of metallurgy, furnace industry and thermal pipeline, and is mainly used for the maintenance of the heat insulation layer in the air and gas pipeline of the heating furnace. It includes the following steps: ⅰ, removing the damaged part; ⅱ. Weld and install Y-shaped anchor hooks on the inner wall of the metal pipe; ⅳ. Paste a 30mm thick fiber blanket on the inner wall of the metal pipe for heat insulation and cover it with plastic film; ⅳ. Finally, pour the fiber castable as a whole by manual projection. The invention can be constructed by ordinary laborers, and the construction period is obviously shortened, especially in the pipe elbow and special-shaped parts, the service life after the maintenance of the invention is increased from 3 years to more than 10 years.

Description

加热炉管道内隔热层修复方法Repairing Method of Heat Insulation Layer in Heating Furnace Pipeline

技术领域technical field

本发明属于冶金、炉业、热力管道的维修领域,主要用于加热炉空气、煤气管道内隔热层的维修。The invention belongs to the field of metallurgy, furnace industry and maintenance of thermal pipelines, and is mainly used for maintenance of heat insulation layers in heating furnace air and gas pipelines.

背景技术Background technique

加热炉空气、煤气输送管道在运行过程中,时有发生管道内隔热层耐材局部脱落现象,尤其是在管道弯头部位。脱落的耐材被流动的空气或煤气带到烧嘴前的管道内,堵塞了烧嘴,造成烧嘴工作效率降低,严重者将烧嘴烧损,发生被迫停炉的重大事故发生。During the operation of the air and gas pipelines of the heating furnace, the refractory material of the heat insulation layer in the pipeline sometimes falls off, especially at the elbow of the pipeline. The shed refractory material is brought into the pipeline in front of the burner by the flowing air or gas, blocking the burner, resulting in a decrease in the working efficiency of the burner, and in severe cases, the burner is burned, and a major accident occurs that is forced to shut down the furnace.

传统的管道内隔热层修复方法是将损坏的输送管道内轻质隔热砖砌筑层,按照膨胀缝全面进行拆除,然后对损坏部位用轻质隔热砖再按照原来的砌筑方法进行砌筑恢复。The traditional method of repairing the heat insulation layer in the pipeline is to build the layer of light heat insulation bricks in the damaged pipeline, completely remove it according to the expansion joints, and then use light heat insulation bricks on the damaged parts according to the original masonry method. Masonry restored.

传统的施工方法施工工程量大、施工难度大、施工时间长、修复后的隔热层使用寿命短,并且需要高技术的瓦工和复杂的异型砖等技术要求。The traditional construction method has a large amount of construction work, great construction difficulty, long construction time, short service life of the repaired insulation layer, and requires technical requirements such as high-tech bricklayers and complex special-shaped bricks.

发明内容Contents of the invention

本发明提供施工时间短且修复后的隔热层使用寿命长的加热炉管道内隔热层修复方法。The invention provides a method for repairing the heat insulation layer in the heating furnace pipeline with short construction time and long service life of the repaired heat insulation layer.

本发明包括下述步骤:The present invention comprises the following steps:

1、拆除损坏部位;1. Remove the damaged part;

2、在金属管内壁上焊接安装Y型锚固钩;2. Weld and install Y-shaped anchor hooks on the inner wall of the metal pipe;

3、在金属管道内壁粘贴30mm厚的纤维毯进行隔热,并用塑料膜覆盖;3. Paste a 30mm thick fiber blanket on the inner wall of the metal pipe for heat insulation, and cover it with a plastic film;

4、最后用人工投射法将纤维浇注料整体浇注。4. Finally, pour the fiber castable as a whole by artificial projection method.

所述的Y形锚固钩用Φ8圆钢,材质为Q235,焊接成一根竖直钢和两根斜钢所构成的Y形,其中竖直钢与斜钢之间的夹角为135度,两根斜钢之间的夹角为90度,竖直钢的长度为40mm,两根斜钢的长度均为50mm。The Y-shaped anchor hook is made of Φ8 round steel made of Q235, which is welded into a Y shape formed by a vertical steel and two oblique steels, wherein the angle between the vertical steel and the oblique steel is 135 degrees, and the two The included angle between the root oblique steel is 90 degrees, the length of the vertical steel is 40mm, and the length of the two oblique steels is 50mm.

所述的人工投射法层层投射在作业面上,当投射厚度达到设计尺寸时,用噢抹子压实、抹光,每隔1.5-2米留设一条伸缩缝,伸缩缝的宽度为10-15mm,伸缩缝采用硅酸铝耐火纤维毯进行填充;其中竖直管道内衬层自下而上分层施工,每层厚度为700-1000mm,每层施工后自然养护3-4小时后可施工第二层;水平管道内隔热层施工,每层施工后自然养护3-4小时后可施工第二层。The artificial projection method is projected layer by layer on the work surface. When the projection thickness reaches the design size, compact and smooth it with a trowel, and leave an expansion joint every 1.5-2 meters. The width of the expansion joint is 10 -15mm, the expansion joints are filled with aluminum silicate refractory fiber blanket; the lining layer of the vertical pipeline is constructed in layers from bottom to top, and the thickness of each layer is 700-1000mm. Construction of the second layer; the construction of the heat insulation layer in the horizontal pipeline, and the second layer can be constructed after natural curing for 3-4 hours after the construction of each layer.

本发明普通力工就可以施工,且施工工期明显缩短,尤其是在管道弯头及异型部位,采用本发明维修后的使用寿命由3年提高到10年以上。The invention can be constructed by ordinary laborers, and the construction period is obviously shortened, especially in the pipe elbow and special-shaped parts, the service life after the maintenance of the invention is increased from 3 years to more than 10 years.

具体实施方式Detailed ways

实施例:Example:

1、制做Y形锚固钩、纤维板、纤维浇注料。1. Make Y-shaped anchor hooks, fiberboards, and fiber castables.

2、Y形锚固钩用Φ8圆钢,材质为Q235,焊接成Y形,其中竖直钢与斜钢之间的夹角为135度,两根斜钢之间的夹角为90度,竖直钢的长度为40mm,两根斜钢的长度均为50mm。2. The Y-shaped anchor hook is made of Φ8 round steel, the material is Q235, and it is welded into a Y shape. The angle between the vertical steel and the inclined steel is 135 degrees, and the angle between the two inclined steels is 90 degrees. The length of the straight steel is 40mm, and the length of the two oblique steels is 50mm.

3、在停炉煤气化验合格后,确认煤气管道盲板阀完全关闭,打开加热炉热空气、煤气输送管道损坏部位。3. After the gas test is qualified after the shutdown of the furnace, confirm that the blind valve of the gas pipeline is completely closed, and open the hot air of the heating furnace and the damaged part of the gas pipeline.

4、拆除管道损坏部位的耐火材料层,并清理干净。4. Remove the refractory material layer on the damaged part of the pipeline and clean it up.

5、管道损坏部位安装放线焊接安装Y型锚固钩。5. The damaged part of the pipeline is installed with setting-out welding and Y-shaped anchor hook.

6、按照管道内Y型锚固钩安装的位置尺寸对纤维板进行下料。6. Cut the fiberboard according to the size of the installation position of the Y-shaped anchor hook in the pipeline.

7、安装纤维板:要求纤维板对接缝宽度≤0.5mm,且纤维板必须用高温胶泥粘接牢固,纤维板平直度≤1.5 mm。7. Install fiberboard: the fiberboard joint width is required to be ≤0.5mm, and the fiberboard must be firmly bonded with high-temperature cement, and the straightness of the fiberboard is ≤1.5 mm.

8、纤维板表面覆盖一层塑料薄膜,防止与纤维浇注料直接接触。8. The surface of the fiberboard is covered with a layer of plastic film to prevent direct contact with the fiber castable.

9、将配制好的纤维浇注料加到搅拌机内加自来水,搅拌2-3分钟,即可出料;搅拌好的纤维浇注料在20分钟内用完,防止因间隔时间过长材料发生硬结影响施工质量;9. Add the prepared fiber castable to the mixer, add tap water, stir for 2-3 minutes, and the material can be discharged; the stirred fiber castable should be used up within 20 minutes to prevent the material from induration due to too long interval Construction Quality;

10、将搅拌好的纤维浇注料用人工投射法;层层投射在作业面上,当投射厚度达到设计尺寸时,用抹子压实、抹光,每隔1.5-2米留设一条伸缩缝,伸缩缝的宽度为10-15mm,伸缩缝采用硅酸铝耐火纤维毯进行填充;其中竖直管道内衬层自下而上分层施工,每层厚度为700-1000mm,每层施工后自然养护3-4小时后可施工第二层;水平管道内隔热层施工,每层施工后自然养护3-4小时后可施工第二层;10. Use the artificial projection method to mix the fiber castable; project it layer by layer on the working surface. When the projected thickness reaches the designed size, use a trowel to compact and smooth it, and leave an expansion joint every 1.5-2 meters , the width of the expansion joint is 10-15mm, and the expansion joint is filled with aluminum silicate refractory fiber blanket; the inner lining layer of the vertical pipeline is constructed in layers from bottom to top, and the thickness of each layer is 700-1000mm. The second layer can be constructed after curing for 3-4 hours; the heat insulation layer in the horizontal pipeline is constructed, and the second layer can be constructed after natural curing for 3-4 hours after the construction of each layer;

11、耐材养生24h11. Refractory material maintenance for 24 hours

12、点火烘炉:按照加热炉施工的烘炉曲线烘烤升温烘炉104h后,即可投运。12. Ignition oven: After heating up the oven for 104 hours according to the oven curve for heating furnace construction, it can be put into operation.

本实施例中的纤维浇注料制作原料为耐火纤维针刺毯,耐火纤维针刺毯用甩丝法生产、干法针刺成型,纤维直径小、纤维长、抗拉强度较高,无结合剂,不含任何添加剂。它有低温型LT-J,标准型RT-J,高温型RT,高纯型HP-J,高温型HT-J,超高温型HS-J,该纤维浇注料具有一定的承重能力,抗气流冲刷能力强,气密性好,使用寿命长等优点。The raw material for the fiber castable in this example is refractory fiber needle-punched blanket. The refractory fiber needle-punched blanket is produced by the spinning method and formed by dry needle punching. The fiber diameter is small, the fiber is long, the tensile strength is high, and there is no binder , does not contain any additives. It has low-temperature type LT-J, standard type RT-J, high-temperature type RT, high-purity type HP-J, high-temperature type HT-J, ultra-high temperature type HS-J, the fiber castable has a certain load-bearing capacity, anti-airflow Strong scouring ability, good air tightness, long service life and other advantages.

Claims (3)

1. heating furnace pipeline inner insulating layer restorative procedure is characterized in that comprising the steps:
ⅰ, dismounting damaged location;
ⅱ, on inner wall of metal tube welded and installed Y type anchoring hook;
ⅲ, paste the thick tapetum fibrosum of 30mm in metal pipe internal wall and carry out heat insulationly, and cover with plastic foil;
ⅳ, use artificial projective method that fibre castable is integrated poured at last.
2. heating furnace pipeline inner insulating layer restorative procedure according to claim 1, it is characterized in that described Y shape anchoring hook Φ 8 round steel, material is Q235, be welded into a vertical steel and two Y shapes that oblique steel constituted, wherein vertically the angle between steel and the oblique steel is 135 degree, angle between two oblique steel is 90 degree, and vertically the length of steel is 40mm, and the length of two oblique steel is 50mm.
3. heating furnace pipeline inner insulating layer restorative procedure according to claim 1, it is characterized in that described artificial projective method is incident upon on the scope of operation layer by layer, when projection thickness reaches design size, with trowel compacting, troweling, stay every 1.5-2 rice and to establish an expansion joint, the width at expansion joint is 10-15mm, and the expansion joint adopts alumina-silicate refractory fibre blanket to fill; Vertical pipeline inner liner construction in layer from bottom to top wherein, every layer thickness is 700-1000mm, the second layer of can constructing after natural curing 3-4 hour after every layer of construction; The construction of horizontal pipe inner insulating layer, the second layer of can constructing after natural curing 3-4 hour after every layer of construction.
CN 201110088980 2011-04-11 2011-04-11 Process for repairing thermal insulating layer in a pipeline of heating furnace Pending CN102183148A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110088980 CN102183148A (en) 2011-04-11 2011-04-11 Process for repairing thermal insulating layer in a pipeline of heating furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110088980 CN102183148A (en) 2011-04-11 2011-04-11 Process for repairing thermal insulating layer in a pipeline of heating furnace

Publications (1)

Publication Number Publication Date
CN102183148A true CN102183148A (en) 2011-09-14

Family

ID=44569400

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110088980 Pending CN102183148A (en) 2011-04-11 2011-04-11 Process for repairing thermal insulating layer in a pipeline of heating furnace

Country Status (1)

Country Link
CN (1) CN102183148A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102829634A (en) * 2012-09-19 2012-12-19 鞍钢集团矿业公司 Fire-resistant liner for warm air pipeline and paving method thereof
CN104034170A (en) * 2014-06-12 2014-09-10 山西太钢不锈钢股份有限公司 Maintenance method of insulation refractory material for horizontal beam of heating furnace
CN104154755A (en) * 2014-08-08 2014-11-19 山西太钢不锈钢股份有限公司 Thermal insulation construction method in hot gas pipelines
CN107305102A (en) * 2016-04-22 2017-10-31 上海梅山钢铁股份有限公司 A kind of construction method of stove channel bend inner lining refractory
CN108913218A (en) * 2018-08-31 2018-11-30 义马煤业综能新能源有限责任公司 A kind of u-gas gasification furnace castable furnace building material structure and its technique
CN110345772A (en) * 2019-06-06 2019-10-18 国家电投集团黄河上游水电开发有限责任公司 Rapid emergency repair method for high-temperature flue
CN112359155A (en) * 2020-10-30 2021-02-12 张家港宏昌钢板有限公司 Method for repairing local lining refractory falling of blast furnace top gas ascending pipeline
CN120115944A (en) * 2025-05-08 2025-06-10 山东瀛洲节能环保科技有限公司 A refractory material maintenance construction process for expansion joints of waste incinerators

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4835831A (en) * 1988-07-15 1989-06-06 Melton Sidney H Method of providing a refractory covering to a furnace wall
JPH06307776A (en) * 1993-04-26 1994-11-01 Nippon Steel Corp Heat insulation lining method for atmosphere furnace
JPH11130485A (en) * 1997-10-23 1999-05-18 Toshiba Ceramics Co Ltd Panel for cement kiln and method of construction
JP3464580B2 (en) * 1996-04-16 2003-11-10 サンゴバン・ティーエム株式会社 Insulation structure of furnace wall and method of construction
CN1945187A (en) * 2006-10-24 2007-04-11 山西太钢不锈钢股份有限公司 Step heating furnace beam and pole and its construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4835831A (en) * 1988-07-15 1989-06-06 Melton Sidney H Method of providing a refractory covering to a furnace wall
JPH06307776A (en) * 1993-04-26 1994-11-01 Nippon Steel Corp Heat insulation lining method for atmosphere furnace
JP3464580B2 (en) * 1996-04-16 2003-11-10 サンゴバン・ティーエム株式会社 Insulation structure of furnace wall and method of construction
JPH11130485A (en) * 1997-10-23 1999-05-18 Toshiba Ceramics Co Ltd Panel for cement kiln and method of construction
CN1945187A (en) * 2006-10-24 2007-04-11 山西太钢不锈钢股份有限公司 Step heating furnace beam and pole and its construction method

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102829634A (en) * 2012-09-19 2012-12-19 鞍钢集团矿业公司 Fire-resistant liner for warm air pipeline and paving method thereof
CN104034170A (en) * 2014-06-12 2014-09-10 山西太钢不锈钢股份有限公司 Maintenance method of insulation refractory material for horizontal beam of heating furnace
CN104034170B (en) * 2014-06-12 2015-09-23 山西太钢不锈钢股份有限公司 A kind of heat insulation repair and maintenance of the resistance to material method of heating furnace horizontal beam
CN104154755A (en) * 2014-08-08 2014-11-19 山西太钢不锈钢股份有限公司 Thermal insulation construction method in hot gas pipelines
CN107305102A (en) * 2016-04-22 2017-10-31 上海梅山钢铁股份有限公司 A kind of construction method of stove channel bend inner lining refractory
CN108913218A (en) * 2018-08-31 2018-11-30 义马煤业综能新能源有限责任公司 A kind of u-gas gasification furnace castable furnace building material structure and its technique
CN108913218B (en) * 2018-08-31 2024-04-02 义马煤业综能新能源有限责任公司 Furnace construction material structure of u-gas gasifier castable and process thereof
CN110345772A (en) * 2019-06-06 2019-10-18 国家电投集团黄河上游水电开发有限责任公司 Rapid emergency repair method for high-temperature flue
CN112359155A (en) * 2020-10-30 2021-02-12 张家港宏昌钢板有限公司 Method for repairing local lining refractory falling of blast furnace top gas ascending pipeline
CN120115944A (en) * 2025-05-08 2025-06-10 山东瀛洲节能环保科技有限公司 A refractory material maintenance construction process for expansion joints of waste incinerators
CN120115944B (en) * 2025-05-08 2025-07-18 山东瀛洲节能环保科技有限公司 A refractory material maintenance construction process for expansion joints of waste incinerators

Similar Documents

Publication Publication Date Title
CN102183148A (en) Process for repairing thermal insulating layer in a pipeline of heating furnace
CN102912051B (en) Method for exchanging cooling wall of blast furnace taphole online
CN204174222U (en) The repair structure of iron-making heat wind furnace hot air duct and repairing mould thereof
CN112113430A (en) Refractory material building method for smelting reduction furnace
CN102032788B (en) Furnace top repairing method for heating furnace
CN102424872A (en) Method for repairing damaged blast furnace hot air pipeline lining in thermal state
CN102382914A (en) Blast furnace superconducting cooling and waste heat power generation system
CN112390632B (en) Corundum-mullite low-cement self-flow castable and method for repairing hot air outlet of top combustion type hot air furnace by using same
CN108570524A (en) The blast funnace hot blast stove pipe lining checkout and diagnosis of resistance to material technique
CN108264907B (en) Blow-by gas gunning device for top layer of coke oven and pneumatic gunning method thereof
CN109000223A (en) A kind of material return device for circulating fluidized bed boiler part thermal insulation layer lining restorative procedure
JP7378584B2 (en) How to install fireproof fiber integrated module
CN101979188B (en) Method for building bottom of molten steel tank
CN103788966A (en) A CDQ high temperature resistant expansion joint
CN201215439Y (en) Wall repairing construction for step heating stove
CN114058760B (en) Method for quickly replacing local hot air pipeline on hot air pipe of blast furnace
CN102175085A (en) Method for pouring and constructing whole furnace wall of heating furnace with heat-accumulating-type nozzle
CN115386669B (en) A method of establishing a triple bottom hearth structure of a blast furnace
CN203754747U (en) Quick repair equipment for refractory brick falling off in hot air duct premix room
CN110643773A (en) A kind of blast furnace hot blast branch pipe port refractory repair method
CN207877645U (en) A kind of pneumatic mending device of oven top of coke oven layer blowby
CN104121428B (en) Flue gas line of return for bio-fuel device outside heat removing and preparation method thereof
CN104154755A (en) Thermal insulation construction method in hot gas pipelines
CN203938642U (en) A kind of coke oven peephole string leakage device of administering
CN114193583A (en) Method for quickly repairing collapsed refractory brick

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110914