CN202100032U - 一种直接空冷汽轮发电机组系统 - Google Patents

一种直接空冷汽轮发电机组系统 Download PDF

Info

Publication number
CN202100032U
CN202100032U CN2011201704719U CN201120170471U CN202100032U CN 202100032 U CN202100032 U CN 202100032U CN 2011201704719 U CN2011201704719 U CN 2011201704719U CN 201120170471 U CN201120170471 U CN 201120170471U CN 202100032 U CN202100032 U CN 202100032U
Authority
CN
China
Prior art keywords
steam turbine
generator set
turbo
direct air
bay
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011201704719U
Other languages
English (en)
Inventor
孙锐
柴靖宇
王盾
Original Assignee
China Power Engineering Consulting Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Power Engineering Consulting Group Corp filed Critical China Power Engineering Consulting Group Corp
Priority to CN2011201704719U priority Critical patent/CN202100032U/zh
Application granted granted Critical
Publication of CN202100032U publication Critical patent/CN202100032U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

本实用新型提供一种直接空冷汽轮发电机组系统,包括:锅炉、煤仓间、除氧间、汽机房、汽轮发电机组和空冷凝汽器,所述汽机房设置于所述煤仓间和除氧间的上部;所述汽轮发电机组,布置在所述汽机房运转层平台上;本实用新型减少了排气管道的阻力,从而降低了机组的煤耗,同时,减少了高温管道的用量,在高温管道价格昂贵的情况下,可降低机组的建造成本。

Description

一种直接空冷汽轮发电机组系统
技术领域
本实用新型涉及火力发电技术领域,特别是一种直接空冷汽轮发电机组系统。
背景技术
直接空冷汽轮发电机组在我国北方缺水地区得到了广泛应用,最大的单机容量已达到1000MW级,截止2010年底,我国已经建成投产上百台直接空冷机组,总容量超过7000万千瓦。
如图1所示,目前的直接空冷汽轮发电机组系统包括:锅炉1、煤仓间2、除氧间3、汽机房4、空冷凝汽器5、汽轮发电机组6、高温蒸汽管道7和排汽管道8,其中汽轮发电机组6布置在汽机房4的运转层平台上,该汽轮发电机组6通过高温蒸汽管道7与锅炉的蒸汽出口连接,通过锅炉输出的高温高压水蒸汽推动汽轮发电机组6进行发电,而汽轮发电机组6的排汽口通过排汽管道8与空冷凝汽器5连接,汽轮发电机组6的排汽通过排汽管道8直接进入空冷凝汽器5凝结成水,然后由凝结水泵将凝结水送入汽轮机组6的回热系统。
空冷汽轮机的背压由空冷凝汽器5的压力与排气管道8的阻力两部分之和构成,因此,通过减少排气管道8的阻力可以降低空冷汽轮机的背压,从而降低机组的煤耗。如图1所示,现有的空冷汽轮发电机组系统中,排气管道8的长度很长,同时,拐弯较多,这都加大了排气管道的阻力。
另一方面,随着汽轮发电机组初参数的提高,对高温蒸汽管道的材质和性能要求越来越高,材料价格也越来越高,高温蒸汽管道7的投资所占比重随之上升。如图1所示,现有的直接空冷汽轮发电机组系统中,锅炉1的蒸汽出口与汽轮发电机组6之间的距离很长,高温蒸汽管道7的用量很大。
实用新型内容
本实用新型的目的是提供一种直接空冷汽轮发电机组系统,减少排气管道的阻力,降低机组的煤耗;同时,减少高温管道的材料消耗量,降低工程投资成本。
为了实现上述目的,本实用新型实施例提供了一种直接空冷汽轮发电机组系统,包括:
锅炉、煤仓间、除氧间、汽机房、空冷凝汽器、汽轮发电机组、高温蒸汽管道和排汽管道;
所述的汽机房设置于所述煤仓间和除氧间的上部;
所述的汽轮发电机组,布置在所述汽机房的运转层平台上。
优选地,上述的直接空冷汽轮发电机组系统,锅炉、煤仓间、除氧间和汽机房为整体联合框架支撑结构体系。
优选地,上述的直接空冷汽轮发电机组系统,所述汽轮发电机组安装在弹簧隔振基座上。
优选地,上述直接空冷汽轮发电机组系统,所述汽轮发电机组包括高压缸、中压缸、低压缸和发电机,全部设置于所述汽机房运转层平台上。
本实用新型实施例具有以下的有益效果:
1)本实用新型实施例中,由于汽轮发电机组位置的抬高,汽轮机排气管道的标高更加接近于空冷凝汽器的进口管道标高,因此,排汽管道的长度和拐弯都随之减小,减少了排气管道的阻力,降低了空冷机组的背压,从而,降低了机组煤耗,也降低了排气管道的建造成本。
2)由于汽轮发电机组位置的抬高,且向锅炉一侧靠近,使得汽轮发电机组与锅炉的蒸汽出口之间的距离在垂直方向和水平方向均大大缩短,高温管道的长度也随之减小,在高温管道价格昂贵的情况下,能够降低机组的建造成本,而随着高温管道长度的减少,其带来的蒸汽阻力也随之降低,提高了系统的效率。
3)由于汽机房设置于煤仓间和除氧间的共同支撑结构体系之上,不再单独占用地面的面积,因此减少了整个直接空冷汽轮发电机组系统的占地面积。
附图说明
图1为现有汽轮发电机组常规布置示意图;
图2为本实用新型汽轮发电机组高位布置示意图。
图1和图2中的设备编号说明如下:
1 锅炉  2 煤仓间  3 除氧间    4 汽机房    5 空冷凝汽器
6 汽轮发电机组    7 高温管道  8 排汽管道  9 辅助设备间
具体实施方式
为使本实用新型实施例的目的、技术方案和优点更加清楚,下面将结合附图对具体实施例进行详细描述。
如图2所示,本实用新型实施例的直接空冷汽轮发电机组系统包括:
锅炉1;煤仓间2;除氧间3;汽机房4;空冷凝汽器5;汽轮发电机组6;高温蒸汽管道7和排汽管道8;
从图2可见,本实用新型将汽机房4设置于煤仓间2和除氧间3的上部,而汽轮发电机组6,布置在汽机房4的运转层平台上。
所述汽轮发电机组6通过高温管道7与锅炉的蒸汽出口连接,通过锅炉输出的高温高压水蒸汽推动汽轮发电机组6进行发电,而汽轮发电机组6的排汽口通过排汽管道8与空冷凝汽器5连接,汽轮发电机组6的排汽通过排汽管道8直接进入空冷凝汽器5形成凝结水,然后由凝结水泵送入汽轮机组6的回热系统。
由于将汽机房4设置于煤仓间2和除氧间3的上部,会导致汽轮发电机组6的安装标高有较大的提高,在汽轮发电机组6和锅炉1各自采用独立支撑结构体系的情况下,在受到外力(如地震、风力等)作用时,汽轮发电机组6与锅炉1之间的相对水平位移加大,使得连接锅炉1和汽轮机发电组6的管道系统承受了巨大的外力,因此,为了保证管道系统的安全性,在本实用新型的具体实施例中,锅炉1、煤仓间2、除氧间3和汽机房4采用整体联合框架支撑结构体系,消除了锅炉1与汽轮发电机组6之间由于外力作用带来的相对水平位移,提高了系统的安全性。
由于将汽机房4设置于煤仓间2和除氧间3的上部,汽轮发电机组6布置在汽机房4的运转层平台上,汽轮发电机组6在工作的过程中产生的震动会直接传递到支撑结构体系上,为了消除这种震动对框架支撑结构体系的不利影响,在本实用新型的具体实施例中,汽轮发电机组6的基座采取了已经得到广泛应用的弹簧隔振措施,同时可以避免高烈度地震区域,地震作用对汽轮发电机组6带来的不利影响。
在本实用新型具体实施例中,高温管道7虽然在图中是一根线表示,但实际上这是一个管道系统,其中包括主蒸汽管道和再热蒸汽管道,其数量与汽轮发电机组6的型式相关。排气管道8虽然在图中是一根线表示,但实际上这是一个管道系统。
直接空冷汽轮发电机组系统非常复杂,其组成包括但不限于上述的各个部分,在本实用新型具体实施例中,由于对直接空冷发电机组系统的工作流程并不作改进,而其工作组成部分和工作过程为本领域技术人员所熟知,因此,在此不作详细描述,仅列出与本实用新型改进点相关的部件,以及具体的改进点。
同时,在本实用新型的具体实施例中,该汽轮发电机组可以是一次再热机组,也可以是二次再热机组,都可以适用本实用新型的方案。
上述直接空冷汽轮发电机组系统,所述汽轮发电机组包括高压缸、中压缸、低压缸和发电机,全部设置于所述汽机房运转层平台上。
汽轮发电机组汽缸的数量与汽轮机的初参数、再热的级数和结构设计等多种因素有关,在本实用新型的具体实施例中,不管汽轮发电机组的具体结构如何,都将整个汽轮发电机组的汽缸和发电机全部移到汽机房4的运转层平台上,因此不管是高压缸、还是中压缸,其与锅炉蒸汽出口之间的距离都会明显缩短,最大程度的节省了高温管道的用量;低压缸排气口与空冷凝汽器之间的距离同样缩短,并减少了拐弯,从而减少了排气管道的阻力,降低了汽轮机的背压。
在本实用新型的具体实施例中,由于汽机房4设置于煤仓间2和除氧间3的上部,常规汽机房中布置的一些设备,并不适合布置到位置提高后的汽机房中,因此,在本实用新型的具体实施例中,如图2所示,还设置一辅助设备间9,用于存放不适合布置到位置提高后的汽机房的设备,该辅助设备间9与所述整体联合框架支撑结构体系相邻。
本实用新型实施例至少存在以下技术效果:
本实用新型实施例的直接空冷发电机系统与现有的直接空冷发电机系统相比,由于汽轮发电机组6位置的抬高,汽轮机排气管道8的标高更加接近于空冷凝汽器的进口管道标高,因此,排汽管道的长度和拐弯都随之减小,减少了排气管道的阻力,降低了空冷机组的背压,从而,降低了机组煤耗,也降低了排气管道的建造成本。
同时,由于汽轮发电机组6位置的抬高,且向锅炉1一侧靠近,使得汽轮发电机组与锅炉的蒸汽出口之间的距离在垂直方向和水平方向均大大缩短,所需的高温管道7的长度也随之减小,在高温管道价格昂贵的情况下,能够降低机组的建造成本,而随着高温管道长度的减少,其带来的蒸汽阻力也随之降低,提高了系统的效率。
同时,由于汽机房4设置于煤仓间2和除氧间3的共同支撑结构体系之上,不再单独占用地面的面积,因此减少了整个直接空冷汽轮发电机组系统的占地面积。
以上所述仅是本实用新型的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以作出若干改进,这些改进也应视为本实用新型的保护范围。

Claims (4)

1.一种直接空冷汽轮发电机组系统,包括:锅炉(1)、煤仓间(2)、除氧间(3)、汽机房(4)、空冷凝汽器(5)、汽轮发电机组(6)、高温蒸汽管道(7)和排汽管道(8);其特征在于:
所述汽机房(4)设置于所述煤仓间(2)和除氧间(3)的上部;
汽轮发电机组(6),布置在所述汽机房(4)的运转层平台上。
2.根据权利要求1所述的直接空冷汽轮发电机组系统,其特征在于,
所述锅炉(1)、煤仓间(2)、除氧间(3)和汽机房(4)为整体联合框架支撑结构体系。
3.根据权利要求1所述的直接空冷汽轮发电机组系统,其特征在于,
所述汽轮发电机组(6)安装在弹簧隔振基座上。
4.根据权利要求1所述的直接空冷汽轮发电机组系统,其特征在于,
所述汽轮发电机组(6)包括高压缸、中压缸、低压缸和发电机,全部设置于所述汽机房运转层平台上。
CN2011201704719U 2011-05-25 2011-05-25 一种直接空冷汽轮发电机组系统 Expired - Lifetime CN202100032U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201704719U CN202100032U (zh) 2011-05-25 2011-05-25 一种直接空冷汽轮发电机组系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201704719U CN202100032U (zh) 2011-05-25 2011-05-25 一种直接空冷汽轮发电机组系统

Publications (1)

Publication Number Publication Date
CN202100032U true CN202100032U (zh) 2012-01-04

Family

ID=45386050

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201704719U Expired - Lifetime CN202100032U (zh) 2011-05-25 2011-05-25 一种直接空冷汽轮发电机组系统

Country Status (1)

Country Link
CN (1) CN202100032U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103346499A (zh) * 2013-07-30 2013-10-09 中国电力工程顾问集团东北电力设计院 大型空冷火电机组空冷岛与高压配电装置的布置结构
CN104563553A (zh) * 2015-01-21 2015-04-29 中国电力工程顾问集团华东电力设计院有限公司 一种与脱硝钢结构合并高位布置的前置汽轮发电机房
CN104563552A (zh) * 2015-01-20 2015-04-29 中国电力工程顾问集团华东电力设计院有限公司 一种与侧煤仓合并高位布置的前置汽轮发电机房
CN108087047A (zh) * 2017-12-28 2018-05-29 江苏金通灵流体机械科技股份有限公司 汽轮机发电机组及其发电方法

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103346499A (zh) * 2013-07-30 2013-10-09 中国电力工程顾问集团东北电力设计院 大型空冷火电机组空冷岛与高压配电装置的布置结构
CN103346499B (zh) * 2013-07-30 2016-05-11 中国电力工程顾问集团东北电力设计院有限公司 大型空冷火电机组空冷岛与高压配电装置的布置结构
CN104563552A (zh) * 2015-01-20 2015-04-29 中国电力工程顾问集团华东电力设计院有限公司 一种与侧煤仓合并高位布置的前置汽轮发电机房
CN104563553A (zh) * 2015-01-21 2015-04-29 中国电力工程顾问集团华东电力设计院有限公司 一种与脱硝钢结构合并高位布置的前置汽轮发电机房
CN104563553B (zh) * 2015-01-21 2017-02-22 中国电力工程顾问集团华东电力设计院有限公司 一种与脱硝钢结构合并高位布置的前置汽轮发电机房
CN108087047A (zh) * 2017-12-28 2018-05-29 江苏金通灵流体机械科技股份有限公司 汽轮机发电机组及其发电方法

Similar Documents

Publication Publication Date Title
CN102352696B (zh) 火力发电厂1000mw级机组汽轮发电机组横向结构及布置方法
CN202100032U (zh) 一种直接空冷汽轮发电机组系统
CN102980417B (zh) 塔式直接空冷凝汽器及其塔式直接干冷系统
CN102094744A (zh) 热电厂、核电站、冷凝水、冷却水再发电装置
CN101852105A (zh) 直接空冷机组给水泵汽轮机的乏汽直排系统
CN203203020U (zh) 一种纸加工用蒸汽余热水回收与循环利用装置
CN204716319U (zh) 一种发电厂空冷岛汇集下降管剩余能量利用装置
CN202187745U (zh) 一种用于矿井井口防冻及地表防冻的新能源空调系统
CN201723259U (zh) 发电厂全负荷高效回热系统
CN202540459U (zh) 加气砖厂的废汽余热回收装置
CN102914189A (zh) 模块化抽取式换热器
CN204227661U (zh) 一种中央空调冷凝水回收节能装置
CN205859979U (zh) 一种用于发电厂燃煤锅炉低低温省煤器的滑动底座
CN209244671U (zh) 航空发动机高空模拟试车台能量吸收与转换装置
CN102581945A (zh) 加气砖厂的废汽余热回收装置
CN203097968U (zh) 一种发电机组热力系统
CN105114139B (zh) 一种带有立式三角形式干式空冷凝汽器的直接空冷系统
CN204704057U (zh) 一种蒸汽发电设备
CN211041872U (zh) 一种发电厂的汽轮发电机组凝汽器循环水管道布置结构
CN204456987U (zh) 一种与侧煤仓合并高位布置的前置汽轮发电机房
CN204901726U (zh) 一种增设换热元件的锅炉排烟余热回收系统
CN104563552B (zh) 一种与侧煤仓合并高位布置的前置汽轮发电机房
CN103807945A (zh) 非能动核电站安全壳内循环冷却机组
CN211851946U (zh) 一种炉窑余热发电装置
CN108533012B (zh) 火力发电厂660mw级机组汽轮发电机组侧向布置结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: ELECTRIC POWER PLANNING + ENGINEERING INSTITUTE

Effective date: 20121106

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20121106

Address after: 100120 Beijing city Xicheng District No. 65 Andrew

Patentee after: China Power Engineering Consulting Group Corporation

Patentee after: ELECTRIC POWER PLANNING & ENGINEERING INSTITUTE

Address before: 100120 Beijing city Xicheng District No. 65 Andrew

Patentee before: China Power Engineering Consulting Group Corporation

ASS Succession or assignment of patent right

Owner name: ELECTRIC POWER PLANNING AND ENGINEERING INSTITUTE

Free format text: FORMER OWNER: ELECTRIC POWER PLANNING AND ENGINEERING INSTITUTE

Effective date: 20141211

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20141211

Address after: 100120 Beijing city Xicheng District No. 65 Andrew

Patentee after: China Power Engineering Consulting Group Corporation

Patentee after: ELECTRIC POWER PLANNING & ENGINEERING INSTITUTE

Patentee after: ELECTRIC POWER PLANNING & ENGINEERING INSTITUTE

Address before: 100120 Beijing city Xicheng District No. 65 Andrew

Patentee before: China Power Engineering Consulting Group Corporation

Patentee before: ELECTRIC POWER PLANNING & ENGINEERING INSTITUTE

C56 Change in the name or address of the patentee

Owner name: CHINA POWER ENGINEERING CONSULTING GROUP CO., LTD.

Free format text: FORMER NAME: CHINA POWER ENGINEERING CONSULTING GROUP CORPORATION

CP01 Change in the name or title of a patent holder

Address after: 100120 Beijing city Xicheng District No. 65 Andrew

Patentee after: CHINA POWER ENGINEERING CONSULTING (GROUP) CORPORATION

Patentee after: ELECTRIC POWER PLANNING & ENGINEERING INSTITUTE

Address before: 100120 Beijing city Xicheng District No. 65 Andrew

Patentee before: China Power Engineering Consulting Group Corporation

Patentee before: ELECTRIC POWER PLANNING & ENGINEERING INSTITUTE

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120104