CN202094560U - Hole-filling tray type fixing bracket for holing wall hidden power distribution pipe - Google Patents

Hole-filling tray type fixing bracket for holing wall hidden power distribution pipe Download PDF

Info

Publication number
CN202094560U
CN202094560U CN2011202229089U CN201120222908U CN202094560U CN 202094560 U CN202094560 U CN 202094560U CN 2011202229089 U CN2011202229089 U CN 2011202229089U CN 201120222908 U CN201120222908 U CN 201120222908U CN 202094560 U CN202094560 U CN 202094560U
Authority
CN
China
Prior art keywords
hole
wall
utility
model
filling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011202229089U
Other languages
Chinese (zh)
Inventor
段连祥
刘明生
赵锋
安晓阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN TIANYI CONSTRUCTION GROUP CO Ltd
Original Assignee
TIANJIN TIANYI CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN TIANYI CONSTRUCTION GROUP CO Ltd filed Critical TIANJIN TIANYI CONSTRUCTION GROUP CO Ltd
Priority to CN2011202229089U priority Critical patent/CN202094560U/en
Application granted granted Critical
Publication of CN202094560U publication Critical patent/CN202094560U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to a hole-filling tray type fixing bracket for holing a wall hidden power distribution pipe, which is characterized by comprising a bracket main body and a fixed pipe clamp, wherein the one end part and the other corresponding end part of the bracket main body are respectively manufactured with an edgefold which is bent upwards, and each edgefold is manufactured with a bolt hole. The utility model has the advantages that the condition that operation workers cut the hollow wall body for slotting and distributing pipes at a large area can be avoided, the procedure of preserving grooves or increasing construction column pre-embedded electric pipes can be reduced, simultaneously, the workload for repairing the wall body can be reduced, and the difficulty during the civil work wall surface painting can be reduced. Compared with the traditionally picking slots and reserving slots for laying electric pipes concealedly, the utility model also has the advantages of less cross and combination, good heat insulation, quickness in installation, labor saving, material saving, energy saving, environmental-protection, safety, reliability, and the like. In addition, the utility model can avoid the local crack caused by repairing the wall body after picking slots for distributing pipes, ensures all the original properties of the wall body not to be changed, reduces the labor intensity of constructors, greatly reduces the construction cost, and improves the construction efficiency.

Description

The dark distribution Guan Bukong of body of wall filling-up hole pellet type fixed support
Technical field
The utility model belongs to interior of building distribution facility field, particularly relates to the dark distribution Guan Bukong of a kind of body of wall filling-up hole pellet type fixed support.
Background technology
Along with the fast development of China's construction material, new materials for wall constantly emerges in large numbers.For example: Taibo plate, GRC light hollow slat, GRC haydite partition plate (being called for short the haydite plate), light ceramsite concrete building-block etc.Because new material has the advantage of light hollow, be applied in widely in the architectural engineering, traditional tick slot form of construction work is: after building wall is finished according to the trend of pipeline, open long groove with cutting machine, fulgurite is laid in the groove and fixing, and then mend groove, civil engineering operation such as plaster.Traditional groove form of construction work of staying is: according to the trend of pipeline, the electrical technology personnel supervise and guide at the scene, in the building wall process, reserve the groove of spool trend under the civil engineering personnel cooperate, wait build by laying bricks or stones finish after, unifiedly carry out the pipe arrangement construction.Above-mentioned construction method has been destroyed the hole of original body of wall, has increased civil engineering, fulgurite difficulty of construction, has reduced the effect of heat insulation of building.Will cause local wall crazing in case deal with improperly, a large amount of tubing, wire rod have been wasted, increased construction cost and problems such as the obstructed or threading difficulty of pipeline have very easily taken place, for project under construction stays hidden danger of quality, thereby make the construction method of the dark distribution pipe of tradition can not satisfy present construction needs far away.
Summary of the invention
The utility model for solve the technical problem that exists in the known technology provide a kind of simple in structure, simplify the operation and the dark distribution Guan Bukong of body of wall quick for installation with filling-up hole pellet type fixed support.
The technical scheme that the utility model is taked for the technical problem that exists in the solution known technology is:
The dark distribution Guan Bukong of body of wall is characterized in that with filling-up hole pellet type fixed support: comprise rack body and fixing pipe clamp, in rack body one end and corresponding the other end all be shaped on the upwards flanging of bending, be shaped on bolt hole on the described flanging.
The utility model can also adopt following technical scheme:
Described rack body one end is shaped on a upwards flanging of bending, and the other end is shaped on two upwards flangings of bending.
Described flanging is perpendicular to the last plane of rack body.
Advantage and the good effect that the utlity model has are: because the utility model adopts technique scheme, promptly filling-up hole pellet type fixed support is set by junction between online box and fulgurite or the fulgurite, utilization designs the hole of switch terminal box or digs out a spot of operation hole fulgurite is secretly applied in cavity wall, avoid operator's large tracts of land cutting hollow wall fluting pipe arrangement, reduced the operation of reserving groove or increasing the pre-buried fulgurite of constructional column.Reduce the workload that body of wall is repaired simultaneously, reduced the difficulty when civil engineering is whitewashed metope.With traditional tick slot, stay groove secretly to apply fulgurite to compare to have to intersect and cooperate less, good heat-insulation effect, quick for installation, labor and material saving, energy-conserving and environment-protective, advantage such as safe and reliable.Can avoid traditional tick slot pipe arrangement to repair the part cracking that body of wall caused in addition, guarantee that the original attribute of body of wall is constant; Reduce workmen's labour intensity, reduced construction cost significantly, improved efficiency of construction.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the utility model user mode schematic diagram.
Among the figure: 1, rack body; 2, flanging; 3, bolt hole; 4, fixing pipe clamp; 5, bolt; 6, fulgurite; 7, pipe collar; 8, terminal box.
Embodiment
For further understanding summary of the invention of the present utility model, characteristics and effect, exemplify following examples now, and conjunction with figs. is described in detail as follows:
See also Fig. 1 and Fig. 2, the dark distribution Guan Bukong of body of wall filling-up hole pellet type fixed support, include rack body 1 that steel plate makes and fixing pipe clamp 4, in rack body one end and corresponding the other end all be shaped on the upwards flanging 2 of bending, be shaped on bolt hole 3 on the described flanging.In the present embodiment, an end of described rack body 1 is shaped on a upwards flanging 2 of bending, and the corresponding other end is shaped on two upwards flangings 2 of bending, and described flanging 2 is perpendicular to the last plane of rack body 1.
The dark distribution Guan Bukong of this body of wall utilizes the characteristic of the inner up/down perforation of hollow wall with filling-up hole pellet type fixed support, when the civil engineering main body, earlier fulgurite 6 segmentations secretly is fitted on the position of concrete and masonry joint portion.When masonry panel, with progress the fulgurite of segmentation is inserted in the hollow block plate (piece) in advance, perhaps on the hollow metope appropriate location of building by laying bricks or stones, reserve or dig out and satisfy the hole that fulgurite is walked, should the segmentation on demand of the whole elongated fulgurite that lays, connect one from the fulgurite of walking the hole that forms with pipe collar 7, terminal box 8, distribution box again with segmentation.Filling-up hole pellet type fixed support is put into the cavity of reservation, with bolt 5(or self-tapping screw) fixedly pipe clamp 4 and filling-up hole pellet type fixed support are fixed fulgurite, utilize the support bracket fastened side direction support of filling-up hole pellet type power that the fulgurite that connects is firm with bolt in cavity wall then, by the support bracket fastened vertical bearing capacity of pellet type handle hole is repaired, make the repairing hole little, the mortar consumption is few, the not slump of filling mortar, the hole of repairing is tightly solid, has excellent popularization and is worth.
The dark distribution Guan Bukong of this body of wall is suitable for the dark engineering of applying of electic protection pipe in the hollow walls such as the building-block in public, the civil buildings masonry, hollow Taibai panel, GRC hollow lath with filling-up hole pellet type fixed support; also can be applied to other building adopts dark the applying of the electic protection pipe of identical hollow wall material to construct; according to the difference of hollow wall and the quantity of fulgurite, filling-up hole pellet type fixed support size and fulgurite side edgefold quantity can be done simple modification.

Claims (3)

1. the dark distribution Guan Bukong of a body of wall is characterized in that with filling-up hole pellet type fixed support: comprise rack body and fixing pipe clamp, in rack body one end and corresponding the other end all be shaped on the upwards flanging of bending, be shaped on bolt hole on the described flanging.
2. the dark distribution Guan Bukong of body of wall according to claim 1 filling-up hole pellet type fixed support is characterized in that: described rack body one end is shaped on a upwards flanging of bending, and the other end is shaped on two upwards flangings of bendings.
3. the dark distribution Guan Bukong of body of wall according to claim 2 filling-up hole pellet type fixed support, it is characterized in that: described flanging is perpendicular to the last plane of rack body.
CN2011202229089U 2011-06-28 2011-06-28 Hole-filling tray type fixing bracket for holing wall hidden power distribution pipe Expired - Lifetime CN202094560U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202229089U CN202094560U (en) 2011-06-28 2011-06-28 Hole-filling tray type fixing bracket for holing wall hidden power distribution pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202229089U CN202094560U (en) 2011-06-28 2011-06-28 Hole-filling tray type fixing bracket for holing wall hidden power distribution pipe

Publications (1)

Publication Number Publication Date
CN202094560U true CN202094560U (en) 2011-12-28

Family

ID=45369603

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202229089U Expired - Lifetime CN202094560U (en) 2011-06-28 2011-06-28 Hole-filling tray type fixing bracket for holing wall hidden power distribution pipe

Country Status (1)

Country Link
CN (1) CN202094560U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103061515A (en) * 2012-12-29 2013-04-24 陕西省第三建筑工程公司 Method for perforating and pre-burying polyvinyl chloride (PVC) wiring tubes in concrete hollow block filled walls

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103061515A (en) * 2012-12-29 2013-04-24 陕西省第三建筑工程公司 Method for perforating and pre-burying polyvinyl chloride (PVC) wiring tubes in concrete hollow block filled walls
CN103061515B (en) * 2012-12-29 2015-10-14 陕西省第三建筑工程公司 Concrete hollow block infilled wall pre-buried PVC conduit poling mounting method

Similar Documents

Publication Publication Date Title
CN103321436B (en) Pre-installation construction method for wire box on building bricked body and pre-installation supporting frame thereof
CN104746772A (en) Ash concrete hollow partition board anti-cracking construction method
CN203420403U (en) Infilled wall construction structure based on wire box and wire tube mounting precasting building blocks
CN106121231A (en) A kind of skyscraper interts cross construction method
CN211499913U (en) Low-energy-consumption prefabricated house
CN204152000U (en) A kind of inorganic compounding insulation construction for in-situ concrete wall
CN105804292A (en) Environment-friendly and energy-saving integrated cast-in-situ lightweight concrete wall and construction method thereof
CN104631662A (en) Hollow steel mesh keel inner formwork cement partition wall construction method
CN102912960A (en) Wall decoration structure for old building reconstruction and construction method
CN106013509A (en) Dry-method construction method for high-performance autolaved aerated concrete block wall
CN104806025A (en) Direct-burial complete-set constructing process for electromechanical pipelines and wire boxes of masonry engineering
CN105863317A (en) Energy-saving environmentally-friendly type distribution room based on quick construction technique
CN205776884U (en) A kind of assembled Novel light wall body
CN108286341B (en) Anti-cracking steel mesh template structure at joint of different substrate materials and construction method using same
CN204059661U (en) A kind of ALC body of wall assembly
CN202094560U (en) Hole-filling tray type fixing bracket for holing wall hidden power distribution pipe
CN206971476U (en) A kind of assembled wall increases structure
CN105178986B (en) Variable curve mold for lining positioning of earth-sheltered dwelling and construction technology of variable-curve mold
CN104405115A (en) Wall plastering flatness and perpendicularity control device and construction method
CN204899213U (en) A mould that is used for floor feed pipe to stay groove to fix a position
CN212078228U (en) Prefabricated wallboard structure of grooving is exempted from to on-spot pipeline
CN105421656A (en) External wall board installation structure of embedded type steel structure assembled house
CN210563394U (en) Reserved hole opening fast hanging hole structure
CN210563409U (en) Face wall and hang hole construction structures
CN212358610U (en) Mounting structure of top surface spherical net rack

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20111228

CX01 Expiry of patent term