CN202089852U - Biomass power plant boiler make-up water system adopting secondary reverse osmosis treatment - Google Patents

Biomass power plant boiler make-up water system adopting secondary reverse osmosis treatment Download PDF

Info

Publication number
CN202089852U
CN202089852U CN2011202213841U CN201120221384U CN202089852U CN 202089852 U CN202089852 U CN 202089852U CN 2011202213841 U CN2011202213841 U CN 2011202213841U CN 201120221384 U CN201120221384 U CN 201120221384U CN 202089852 U CN202089852 U CN 202089852U
Authority
CN
China
Prior art keywords
reverse osmosis
water
pass
osmosis device
power plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202213841U
Other languages
Chinese (zh)
Inventor
秦开宇
李国秋
张凯
渠慧英
金维勤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inner Mongolia Electric Power Survey and Design Institute Co Ltd
Original Assignee
Inner Mongolia Electric Power Survey and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inner Mongolia Electric Power Survey and Design Institute Co Ltd filed Critical Inner Mongolia Electric Power Survey and Design Institute Co Ltd
Priority to CN2011202213841U priority Critical patent/CN202089852U/en
Application granted granted Critical
Publication of CN202089852U publication Critical patent/CN202089852U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Separation Using Semi-Permeable Membranes (AREA)

Abstract

The utility model discloses a biomass power plant boiler make-up water system adopting secondary reverse osmosis, and comprises a raw water tank, a raw water pump, a raw water heater, a lamination filter, an ultrafiltration device, an ultrafiltration water tank, an ultrafiltration water pump and a security filter which are all sequentially connected through pipelines. A pipeline connecting with both the ultrafiltration water pump and the security filter is provided with a medicine-adding device, and a desalting water tank, a desalting water pump and a main plant house are sequentially connected through pipelines. The biomass power plant boiler make-up water system further comprises a primary reverse osmosis device and a secondary reverse osmosis device. The biomass power plant boiler make-up water system has the advantages that (1) the secondary reverse osmosis device is adopted to perform acid-free and alkali-free waste water discharge for the boiler make-up water treatment, thereby being the environment-protecting technology; (2) the system is simple, few in control parameters, simple to install, debug, operate and maintain and low in labor intensity; and (3) single bodies of devices are few, the occupied space is saved, the construction quantity of a water treatment workshop is reduced, and the like.

Description

A kind of biomass electric power plant boiler feed water system that adopts the secondary reverse osmosis to handle
Technical field
The utility model relates to a kind of biomass electric power plant boiler feed water system, particularly relates to a kind of biomass electric power plant boiler feed water system that adopts the secondary reverse osmosis to handle.
Background technology
What conventional biomass electric power plant boiler feed water system mainly adopted is the kinds of processes assembled scheme of band ion exchange method, is the at present general method of removing the intermediate ion impurity that anhydrates.The kinds of processes assembled scheme of band ion exchange method is meant when certain material runs into water, carries out the method for permutoid reaction in the ion that itself can be had and the water with the ion of similar electric charge.
Ion exchange method: " ultrafiltration (UF)+first-stage reverse osmosis (RO)+ion-exchanger " technology, technical process is as follows:
Former water → raw water tank → raw water pump → unboiled water well heater → lamination strainer → ultra-filtration equipment → ultrafiltration water tank → ultrafiltration water pump → reductive agent dosing/Scale inhibitors dosing → 5 μ m strainer → first-stage reverse osmosis device → ion-exchanger → sweet-water tank → desalination water pump → power house of ensuring public security.
Adopt the biomass electric power plant boiler feed water system of ion exchange method to have following shortcoming: (1) has the acidic and alkaline waste water discharging, though through neutralizing treatment, still environment is had pollution; (2) system complex, controlled variable is many, and level of automation requires high; (3) the Installation and Debugging Operation and Maintenance is loaded down with trivial details; (4) the soda acid system operators has the danger that is injured by chemical substance; (5) the equipment monomer is many, the water treatment room area big, the building scale of construction is bigger, and construction costs is higher.
Summary of the invention
The purpose of this utility model is to provide a kind of biomass electric power plant boiler feed water system that adopts the secondary reverse osmosis to handle.
The purpose of this utility model is implemented by following technical scheme, a kind of biomass electric power plant boiler feed water system that adopts the secondary reverse osmosis to handle, it includes the raw water tank that connects successively by pipeline, raw water pump, the unboiled water well heater, the lamination strainer, ultra-filtration equipment, the ultrafiltration water tank, ultrafiltration water pump and security personnel's strainer, the pipeline that connects described ultrafiltration water pump and described security personnel's strainer is provided with chemicals dosing plant, sweet-water tank, the desalination water pump is connected by pipeline successively with power house, it also includes first-stage reverse osmosis device and two-pass reverse osmosis device, the first-stage reverse osmosis outlet of described first-stage reverse osmosis device and the two-pass reverse osmosis inlet of described two-pass reverse osmosis device pass through pipe connection, connect the pipeline that the two-pass reverse osmosis of the first-stage reverse osmosis outlet of described first-stage reverse osmosis device and described two-pass reverse osmosis device enters the mouth and be provided with adder-subtractor, described security personnel's strainer and described first-stage reverse osmosis device are by former jellyfish pipe coupling, described former jellyfish pipe is provided with and adds sour device, and the two-pass reverse osmosis outlet of described two-pass reverse osmosis device is connected with described sweet-water tank by pipeline.
The first-stage reverse osmosis drain outlet of described first-stage reverse osmosis device is connected with the first-stage reverse osmosis water shoot, the two-pass reverse osmosis drain outlet of described two-pass reverse osmosis device is connected with an end of two-pass reverse osmosis water shoot and an end of two-pass reverse osmosis draining return line respectively, and the other end of described two-pass reverse osmosis draining return line is connected on the described described former jellyfish pipe that adds between sour device and the described first-stage reverse osmosis device.
Advantage of the present utility model is that (1) Boiler water Feeding System adopts the two-pass reverse osmosis system not have the acidic and alkaline waste water discharging, is green environmental protection technique, the danger that can avoid the soda acid system operators to be injured by chemical substance simultaneously; (2) system is simple, and controlled variable is few, and installation, debugging, operation and maintenance are simple, and labour intensity is low; (3) the equipment monomer is few, small accommodation area, and the building quantity in water treatment workshop reduces; (4) equipment is skid, can assemble in advance in factory, and on-the-spot Installation and Debugging quantities is little, short construction period.
Description of drawings
The biomass electric power plant boiler feed water system schema of Fig. 1 for adopting the secondary reverse osmosis to handle.
Raw water tank 1, raw water pump 2, unboiled water well heater 3, lamination strainer 4, ultra-filtration equipment 5, ultrafiltration water tank 6, ultrafiltration water pump 7, security personnel's strainer 8, first-stage reverse osmosis device 9, two-pass reverse osmosis device 10, sweet-water tank 11, desalination water pump 12, power house 13, chemicals dosing plant 14, add sour device 15, adder-subtractor 16, former jellyfish pipe 17, first-stage reverse osmosis water shoot 18, two-pass reverse osmosis water shoot 19, two-pass reverse osmosis draining return line 20.
Embodiment
Embodiment 1:A kind of biomass electric power plant boiler feed water system that adopts the secondary reverse osmosis to handle, it includes the raw water tank 1 that connects successively by pipeline, raw water pump 2, unboiled water well heater 3, lamination strainer 4, ultra-filtration equipment 5, ultrafiltration water tank 6, ultrafiltration water pump 7 and security personnel's strainer 8, the pipeline that connects ultrafiltration water pump 7 and security personnel's strainer 8 is provided with chemicals dosing plant 14, sweet-water tank 11, desalination water pump 12 and power house 13 are connected successively by pipeline, it also includes first-stage reverse osmosis device 9 and two-pass reverse osmosis device 10, the first-stage reverse osmosis outlet of first-stage reverse osmosis device 9 and the two-pass reverse osmosis inlet of two-pass reverse osmosis device 10 pass through pipe connection, the pipeline of the first-stage reverse osmosis outlet of connection first-stage reverse osmosis device 9 and the two-pass reverse osmosis inlet of two-pass reverse osmosis device 10 is provided with adder-subtractor 16, security personnel's strainer 8 is connected by former jellyfish pipe 17 with first-stage reverse osmosis device 9, former jellyfish pipe 17 is provided with and adds sour device 15, and the two-pass reverse osmosis outlet of two-pass reverse osmosis device 10 is connected with sweet-water tank 11 by pipeline.
The first-stage reverse osmosis drain outlet of first-stage reverse osmosis device 9 is connected with first-stage reverse osmosis water shoot 18, the two-pass reverse osmosis drain outlet of two-pass reverse osmosis device 10 is connected with an end of two-pass reverse osmosis water shoot 19 and an end of two-pass reverse osmosis draining return line 20 respectively, and the other end of two-pass reverse osmosis draining return line 20 is connected on the former jellyfish pipe 17 that adds between sour device 15 and the first-stage reverse osmosis device 9.

Claims (2)

1. biomass electric power plant boiler feed water system that adopts the secondary reverse osmosis to handle, it includes the raw water tank that connects successively by pipeline, raw water pump, the unboiled water well heater, the lamination strainer, ultra-filtration equipment, the ultrafiltration water tank, ultrafiltration water pump and security personnel's strainer, the pipeline that connects described ultrafiltration water pump and described security personnel's strainer is provided with chemicals dosing plant, sweet-water tank, the desalination water pump is connected by pipeline successively with power house, it is characterized in that, it also includes first-stage reverse osmosis device and two-pass reverse osmosis device, the first-stage reverse osmosis outlet of described first-stage reverse osmosis device and the two-pass reverse osmosis inlet of described two-pass reverse osmosis device pass through pipe connection, connect the pipeline that the two-pass reverse osmosis of the first-stage reverse osmosis outlet of described first-stage reverse osmosis device and described two-pass reverse osmosis device enters the mouth and be provided with adder-subtractor, described security personnel's strainer and described first-stage reverse osmosis device are by former jellyfish pipe coupling, described former jellyfish pipe is provided with and adds sour device, and the two-pass reverse osmosis outlet of described two-pass reverse osmosis device is connected with described sweet-water tank by pipeline.
2. a kind of biomass electric power plant boiler feed water system that adopts the secondary reverse osmosis to handle according to claim 1, it is characterized in that, the first-stage reverse osmosis drain outlet of described first-stage reverse osmosis device is connected with the first-stage reverse osmosis water shoot, the two-pass reverse osmosis drain outlet of described two-pass reverse osmosis device is connected with an end of two-pass reverse osmosis water shoot and an end of two-pass reverse osmosis draining return line respectively, and the other end of described two-pass reverse osmosis draining return line is connected on the described described former jellyfish pipe that adds between sour device and the described first-stage reverse osmosis device.
CN2011202213841U 2011-06-28 2011-06-28 Biomass power plant boiler make-up water system adopting secondary reverse osmosis treatment Expired - Fee Related CN202089852U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202213841U CN202089852U (en) 2011-06-28 2011-06-28 Biomass power plant boiler make-up water system adopting secondary reverse osmosis treatment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202213841U CN202089852U (en) 2011-06-28 2011-06-28 Biomass power plant boiler make-up water system adopting secondary reverse osmosis treatment

Publications (1)

Publication Number Publication Date
CN202089852U true CN202089852U (en) 2011-12-28

Family

ID=45364934

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202213841U Expired - Fee Related CN202089852U (en) 2011-06-28 2011-06-28 Biomass power plant boiler make-up water system adopting secondary reverse osmosis treatment

Country Status (1)

Country Link
CN (1) CN202089852U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103629659A (en) * 2013-12-12 2014-03-12 碧海舟(北京)石油化工设备有限公司 Process for producing heat by wastewater and biomass
CN104344395A (en) * 2013-07-24 2015-02-11 陈克秀 Novel power-plant raw water and boiler raw water heating system and method
CN104496066A (en) * 2014-11-19 2015-04-08 重庆中科过滤设备制造有限公司 Waste heat power generation boiler make-up water treatment equipment
CN105948337A (en) * 2016-07-08 2016-09-21 光大生物能源(含山)有限公司 Treatment device and process for water for power generation of biomass fuel
CN110835181A (en) * 2019-11-25 2020-02-25 中霖中科环境科技(安徽)股份有限公司 Mine water treatment system
CN111377573A (en) * 2018-12-28 2020-07-07 无锡博泛特工程设备有限公司 Boiler make-up water treatment system
CN111392894A (en) * 2020-03-05 2020-07-10 赤峰科安水处理技术设备有限责任公司 Method and device for treating make-up water of medium-pressure steam power generation boiler

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104344395A (en) * 2013-07-24 2015-02-11 陈克秀 Novel power-plant raw water and boiler raw water heating system and method
CN103629659A (en) * 2013-12-12 2014-03-12 碧海舟(北京)石油化工设备有限公司 Process for producing heat by wastewater and biomass
CN104496066A (en) * 2014-11-19 2015-04-08 重庆中科过滤设备制造有限公司 Waste heat power generation boiler make-up water treatment equipment
CN105948337A (en) * 2016-07-08 2016-09-21 光大生物能源(含山)有限公司 Treatment device and process for water for power generation of biomass fuel
CN111377573A (en) * 2018-12-28 2020-07-07 无锡博泛特工程设备有限公司 Boiler make-up water treatment system
CN110835181A (en) * 2019-11-25 2020-02-25 中霖中科环境科技(安徽)股份有限公司 Mine water treatment system
CN111392894A (en) * 2020-03-05 2020-07-10 赤峰科安水处理技术设备有限责任公司 Method and device for treating make-up water of medium-pressure steam power generation boiler

Similar Documents

Publication Publication Date Title
CN202089852U (en) Biomass power plant boiler make-up water system adopting secondary reverse osmosis treatment
CN105152399A (en) Reverse osmosis container-type sea water desalination plant and water producing process thereof
CN204039179U (en) The removable pure water making machine of container-type
CN103922546A (en) Heavy metal wastewater treatment equipment and method
CN203939120U (en) Control system is collected with early-stage rainwater by PCB factory
CN102674577B (en) Full-automatic energy-saving reclaimed water recycling device
CN202208664U (en) Waste water treatment system for PCB (Printed circuit board) manufacture technological process
CN104803516B (en) A kind of integrated container formula sea water desalting equipment and desalinating process thereof
CN203741151U (en) Washing-cleaning double-purpose sewage treatment system
CN203065268U (en) Intelligent water-saving purified water recycling device
CN104556447A (en) Reverse-blocking reverse osmosis water purification equipment
CN202022800U (en) Sulfate wastewater reclamation device
CN204247683U (en) A kind of pollution of chromium place in-situ immobilization dedicated water treating apparatus
CN204298182U (en) Building automatic secondary pressurized purifier
CN204661466U (en) Mark sub-prime advanced treatment system is carried by sewage work
CN103755078B (en) Rush clear dual-purpose type Sewage treatment systems and control method thereof
CN102849899A (en) Sewage treatment system
CN203048699U (en) Reverse osmosis all-in-one machine
CN202766370U (en) Wastewater neutralization and recycling system
CN104310707A (en) Efficient spraying wastewater treatment system based on intelligent logic controller
CN205347026U (en) Copper sheet grinds waste water treatment recycling system
CN209367985U (en) A kind of power plant's life water purification treatment system
CN203878010U (en) Aeration and iron-carbon micro-electrolysis combined treatment device of organic polluted groundwater
CN204182291U (en) A kind of ultrafiltration system
CN204097238U (en) Effluent treatment plant

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: INNER MONGOLIA ELECTRIC POWER SURVEY DESIGN INSTIT

Free format text: FORMER NAME: INNER MONGOLIA ELECTRICAL POWER INVESTIGATE AND DESIGN INSTITUTE

CP01 Change in the name or title of a patent holder

Address after: 010020 the Inner Mongolia Autonomous Region Hohhot City Xilin Road No. 209

Patentee after: INNER MONGOLIA ELECTRIC POWER SURVEY & DESIGN INSTITUTE CO., LTD.

Address before: 010020 the Inner Mongolia Autonomous Region Hohhot City Xilin Road No. 209

Patentee before: Inner Mongolia Electric Power Survey Design Institute

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111228

Termination date: 20200628