CN202081384U - Movable trolley for road and bridge anti-collision wall construction - Google Patents

Movable trolley for road and bridge anti-collision wall construction Download PDF

Info

Publication number
CN202081384U
CN202081384U CN 201120151681 CN201120151681U CN202081384U CN 202081384 U CN202081384 U CN 202081384U CN 201120151681 CN201120151681 CN 201120151681 CN 201120151681 U CN201120151681 U CN 201120151681U CN 202081384 U CN202081384 U CN 202081384U
Authority
CN
China
Prior art keywords
road
mobile trolley
movable trolley
trolley used
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120151681
Other languages
Chinese (zh)
Inventor
肖必建
王伟民
周爱明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Original Assignee
Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd filed Critical Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority to CN 201120151681 priority Critical patent/CN202081384U/en
Application granted granted Critical
Publication of CN202081384U publication Critical patent/CN202081384U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a movable trolley for road and bridge anti-collision wall construction, which is suitable for construction at bend positions. The movable trolley is fixedly connected with an internal mould, the bottom surface of the movable trolley is provided with pony wheels, the movable trolley further comprises an arc rail equidistantly extending with the edge of a road and bridge foundation, and the pony wheels of the movable trolley move along the arc rail. Equidistant movement of the movable trolley and the edge of the road and bridge foundation is ensured by the rail, a mould board is driven to move, mould board assembling and disassembling time is saved, mounting precision of the mould board is ensured, acceleration of construction progress is benefited, and the movable trolley is particularly suitable for construction at the bend positions.

Description

A kind of road and bridge, crashproof wall construction was with mobile trolley used
[technical field]
The utility model relates to construction implement, relates in particular to the crashproof wall construction of a kind of road and bridge with mobile trolley used.
[background technology]
When common crashproof wall was constructed, its construction sequence generally was that first fixed form carries out concrete pouring, and then stripping, carries out template installation, concrete pouring, the form removable of the crashproof wall of next section again.When particularly constructing at the bend position, for guaranteeing the smooth and continuous transition of crashproof wall, for the installation of template than requirement height at straightway.Therefore efficiency of construction is often lower, and makes mistakes easily and cause unnecessary doing over again.
[summary of the invention]
The technical problems to be solved in the utility model provides a kind of conveniently moving, and the road and bridge that efficiency of construction is high, crashproof wall construction was with mobile trolley used.
In order to solve the problems of the technologies described above, the technical solution adopted in the utility model is, the crashproof wall construction of a kind of road and bridge is suitable for constructing at the bend position with mobile trolley used, mobile trolley usedly fixedlys connected with internal mold, external mold is by the outside of wire rope suspensioning at internal mold, wire rope is connected with mobile trolley used, and mobile trolley used bottom surface is provided with steamboat, the mobile trolley used arc track that also comprises, arc track and road and bridge the basis the edge equidistantly extend to both sides, mobile trolley used steamboat moves along arc track.
As preferably, described arc track is made for C shaped steel, and steamboat moves in the groove of C shaped steel.
As preferably, described steamboat has brake.
The beneficial effects of the utility model are:
By track guarantee mobile trolley used with road and bridge edge of foundation equidistantly move, drive template simultaneously and move, saved the time of template dismounting, guaranteed the installation accuracy of template, help accelerating construction progress, be particularly suitable for constructing at the bend position.
[description of drawings]
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail.
Fig. 1 is the utility model crashproof wall form example structure of a kind of road and bridge schematic diagram.
Fig. 2 is the local enlarged diagram at Figure 1A place.
Among the figure, 1-abutment plinth, the 2-external mold, the 3-internal mold, the crashproof wall of 4-, the 5-wire rope, the 6-crossbeam, the 7-pulley, the 8-pillar, the 9-pull bar, the 10-balancing weight, 11-is mobile trolley used, 12-wire rope tightening device, 13-steamboat, 14-bolt, 15-C shaped steel.
[specific embodiment]
In Fig. 1, a kind of road and bridge crashproof wall form, comprise internal mold 3, external mold 2 and mobile trolley used 11, internal mold 3 is connected by pull bar 9 with mobile trolley used 11.External mold 2 is suspended in the outside of internal mold 3 by wire rope 5, and wire rope 5 is connected with mobile trolley used 11 by wire rope tightening device 12.The mobile trolley used suspension bracket that is equipped with, suspension bracket is made of pillar 8 and crossbeam 6, and crossbeam 6 is contained in the top of pillar 8, and with the pillar installation that meets at right angles, crossbeam is provided with 2 pulleys, and a pulley is fixed on the external part of crossbeam, and pulley is fixed on the inner end of crossbeam.Wire rope 5 places the interior slip of the edge groove of pulley 7.
Wire rope tightening device 12 is a ratchet-type tension force spooler.Use of the suspension wire rope tension of ratchet-type tension force spooler, make that external mold 2 is fixing external mold.
Steamboat 13 is equipped with in mobile trolley used 11 bottom surface, and the track that 2 C shaped steel are made is installed on the bridge base surface, and 2 C shaped steel are weldingly connected with the bar steel, and fix on the ground by bolt 14.Track equates and extends to both sides with the edge spacing of road and bridge base surface.During track laying, with the groove of C shaped steel 15 up, mobile trolley used steamboat 13 is placed groove and can move along groove.Steamboat 13 has brake, mobile trolley usedly steamboat can be checked fixedly the time, decontrols brake when chassis moves, and moves with convenient.
Be added with balancing weight 10 on mobile trolley used 11, be used for the weight of balance external mold 2.
Operating principle:
In advance with C shaped steel track with road and bridge base surface the equidistant setting in edge and be fixed by bolts on the base surface, again internal mold 3 is in place on abutment plinth 1, and is connected and fixed by pull bar 9 and mobile trolley used pillar.With wire rope 5 external mold 2 suspentions and adjusting are put in place, tighten up wire rope 5 by ratchet-type tension force spooler and the lower end hook end of external mold 2 is close to the edge of abutment plinth 1 and colludes tight.Can begin fluid concrete.
By the time the concrete pouring of this section finishes, and moves along track by mobile trolley used then, external mold carries out the construction of the crashproof wall of adjacent next section in carrying.Owing to laid and the equidistant track in road bed edge, when chassis moved to the construction section of next adjacent section, template position was constant, had guaranteed that the curve connection of crashproof wall of bend construction place is smooth accurately.Each section of present embodiment can be poured into a mould 6 meters long crashproof wall.
Need not inner and outer template is removed installation again in the present embodiment construction, saved the time that template is installed and removed, improved operating efficiency.

Claims (3)

1. a crashproof wall construction of road and bridge is with mobile trolley used, be suitable for constructing at the bend position, comprise internal mold, external mold and mobile trolley used, described mobile trolley usedly fixedly connected with internal mold, external mold is by the outside of wire rope suspensioning at internal mold, and wire rope is connected with mobile trolley used, mobile trolley used bottom surface is provided with steamboat, it is characterized in that, the described mobile trolley used arc track that also comprises, mobile trolley used steamboat moves along arc track.
2. crashproof wall construction of a kind of road and bridge according to claim 1 is characterized in that with mobile trolley used described arc track is made for C shaped steel, and steamboat moves in the groove of C shaped steel.
3. crashproof wall construction of a kind of road and bridge according to claim 1 is characterized in that with mobile trolley used described steamboat has brake.
CN 201120151681 2011-05-12 2011-05-12 Movable trolley for road and bridge anti-collision wall construction Expired - Fee Related CN202081384U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120151681 CN202081384U (en) 2011-05-12 2011-05-12 Movable trolley for road and bridge anti-collision wall construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120151681 CN202081384U (en) 2011-05-12 2011-05-12 Movable trolley for road and bridge anti-collision wall construction

Publications (1)

Publication Number Publication Date
CN202081384U true CN202081384U (en) 2011-12-21

Family

ID=45342022

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120151681 Expired - Fee Related CN202081384U (en) 2011-05-12 2011-05-12 Movable trolley for road and bridge anti-collision wall construction

Country Status (1)

Country Link
CN (1) CN202081384U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103255716A (en) * 2013-04-28 2013-08-21 中国五冶集团有限公司 Hit-preventing wall template
CN107268451A (en) * 2017-08-10 2017-10-20 山东博远重工有限公司 A kind of self-propelled anti-collision wall plate device
CN108396652A (en) * 2018-02-08 2018-08-14 中铁大桥局第七工程有限公司 Bridge edge of a wing anti-collision wall repairing holder and its installation method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103255716A (en) * 2013-04-28 2013-08-21 中国五冶集团有限公司 Hit-preventing wall template
CN107268451A (en) * 2017-08-10 2017-10-20 山东博远重工有限公司 A kind of self-propelled anti-collision wall plate device
CN108396652A (en) * 2018-02-08 2018-08-14 中铁大桥局第七工程有限公司 Bridge edge of a wing anti-collision wall repairing holder and its installation method

Similar Documents

Publication Publication Date Title
CN105799056B (en) The prefabricated formwork system of T beam batch production and construction method
CN202081384U (en) Movable trolley for road and bridge anti-collision wall construction
CN208996741U (en) A kind of included track laying device of tunnel lining trolley
CN105544397A (en) High concrete pier construction formwork device
CN109098734A (en) A kind of tunnel lining trolley included track laying device and its application method
CN102296581B (en) Method and device for installing longitudinal guide rail
CN202248860U (en) Hydraulic climbing formwork system
CN204626411U (en) A kind of pile foundation steel bar cage erecting device
CN203247031U (en) Hoisting device for curtain board transporting
CN105196414A (en) Prefabricated T-beam web plate rebar jig frame and prestressed T-beam construction method
CN203320425U (en) Cast-in-situ box girder construction apparatus with slidingly movable side mold
CN203113793U (en) Large formwork installation system of oblique structure
CN201850076U (en) Gate-shaped stand rod hoist of contact network
CN102653937B (en) Concrete construction template bracket for high speed rotary road of automobile test field and construction method
CN203959689U (en) A kind of large-type sinterer depositing dust pipeline is installed and is adjusted with operation car
CN202250105U (en) Integral hydraulic steel formwork trolley
CN102330559A (en) Integral hydraulic steel formwork jumbo
CN205205683U (en) High mound construction formwork device of concrete
CN208748533U (en) A kind of T shape Continuous Rigid Girder Bridge pours external mold mobile device
CN204590640U (en) A kind of prefabricated concrete structure longitudinal reinforcement location adjustment jig
CN202017342U (en) Block traction drawing die for slope concrete pouring
CN203144909U (en) Bridge high pier roller die construction device
CN205276973U (en) Elevator formula garage elevating gear
CN203807946U (en) Track beam erecting device
CN204955097U (en) Prefabricated T web reinforcing bar bed -jig

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111221

Termination date: 20140512