CN202074966U - Automatic settlement observation device - Google Patents

Automatic settlement observation device Download PDF

Info

Publication number
CN202074966U
CN202074966U CN201120161075XU CN201120161075U CN202074966U CN 202074966 U CN202074966 U CN 202074966U CN 201120161075X U CN201120161075X U CN 201120161075XU CN 201120161075 U CN201120161075 U CN 201120161075U CN 202074966 U CN202074966 U CN 202074966U
Authority
CN
China
Prior art keywords
automatic data
automatic
data collection
collection terminal
data acquisition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120161075XU
Other languages
Chinese (zh)
Inventor
张宏博
宋修广
庄培芝
郭瑞
马正
姚凯
杨阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University
Original Assignee
Shandong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University filed Critical Shandong University
Priority to CN201120161075XU priority Critical patent/CN202074966U/en
Application granted granted Critical
Publication of CN202074966U publication Critical patent/CN202074966U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Emergency Alarm Devices (AREA)
  • Alarm Systems (AREA)
  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

The utility model discloses an automatic settlement observation device, which comprises a digital settlement meter, an automatic data acquisition terminal, a solar energy power supply system, a lightening protection system and an upper computer, wherein the digital settlement meter is connected with the automatic data acquisition terminal through a data line, the automatic data acquisition terminal is provided with a wireless transmission module and connected with the upper computer through the wireless transmission module, so that the upper computer can realize command control of the automatic data acquisition terminal and monitor real time transmission of data. The solar energy power supply system is connected with the automatic data acquisition terminal, and the lightening protection system is connected with the automatic data acquisition terminal. The automatic settlement observation device integrates automatic monitoring, data transmission, data processing, early warning and forecasting and has the advantages of being simple to operate, high in automation degree, timely in monitoring, reliable and the like, thereby being capable of being applied to major projects such as expressways, mine exploitation, reservoirs and dams, facilitating disaster prevention and reduction and guaranteeing safety of the people.

Description

A kind of robotization settlement observation equipment
Technical field
The utility model relates to a kind of robotization settlement observation equipment.
Background technology
The settlement measurement equipment that uses in the engineering mainly contains at present: traditional sedimentometers such as settlement plate, steel ruler sedimentometer, sedimentation pipe, sedimentation magnet ring, adopt the method for on the roadbed aspect, burying facilities such as settlement plate, sedimentation pipe underground more, and directly measure sedimentation value.Because equipment is exposed at foundation surface outward, seriously influence normal construction progress and scope and be difficult for protection, the impaired back of equipment measurement data is difficult to reflect the true sedimentation value of roadbed.Other new take-off instrument then owing to installation, service routine complexity, cost height, do not meet characters of practical engineering, are unfavorable for that large tracts of land is promoted and use.Simultaneously, above instrument ubiquity manual operation, automaticity is not high, measuring accuracy is low, interference from human factor is big, the reliability of Monitoring Data be cannot say for sure card, can't realize problems such as real-time continuous monitoring and forecast, Monitoring Data seriously lags behind, and the sedimentation forecast is untimely.Along with the development of construction project, monitoring range is the trend of continuous expansion (monitoring as the place that people in the unbroken mountains high mountain are difficult to arrive), and monitoring requires also more and more higher raising (as real-time monitoring), and the advantage of automatic monitoring system will progressively display.Be badly in need of dependable performance, cheap, monitoring equipment that automaticity is high on the market, therefore, the robotization settlement monitoring instrument that development tallies with the national condition has the broad market space.
Spell out in China railways " Tenth-Five Year Plan " establishment, strengthen the construction of personal rapid transit special line, progressively building up with Beijing, Shanghai, Guangzhou is the center, connects railway personal rapid transit system between each provincial capital and other large size city.On January 7th, 2004, it is that grand blueprint has been described in the China railways development that the Mid-term and Long-term Plan of the Railway Network that passes through is presided over by State Council.Implement Mid-term and Long-term Plan of the Railway Network, the high speed passenger dedicated railway that China is world-class with Large scale construction, the China railways Line for Passenger Transportation will adopt the non-fragment orbit structure in a large number.Yet, because China is not mature enough to the theoretical research of ballastless track of high-speed railway structure, also lack the action oriented research achievement that satisfies the engineering design requirement at present, in engineering design, also exist some to be worth the problem of further investigation, particularly owing to be subjected to the restriction of self structure adjustment capability, non-fragment orbit is responsive especially to sedimentation and deformation, non-fragment orbit technology on the soil subgrade gordian technique that will to be China want emphasis to capture at extensive newly-built Line for Passenger Transportation from now on, we can say that can subgrade settlement be strict controlled in the specialized range be the key point that successfully lay non-fragment orbit on the soil subgrade.Therefore, development has the novel subgrade settlement monitoring system that automatic monitoring, data transmission, data processing and early-warning and predicting are one, has important social value and economic implications for the construction quality that improves China's Line for Passenger Transportation, assurance traffic safety, saving construction fund.
Summary of the invention
At above-mentioned prior art, the utility model provides a kind of robotization settlement observation equipment, it can realize the unattended robotization of sedimentation and deformation, monitoring in real time, can be applied to help China and prevent and reduce natural disasters, ensure people's safety in the important engineerings such as highway, mining, reservoir dam.
The utility model is achieved through the following technical solutions:
A kind of robotization settlement observation equipment, comprise digital sedimentometer, automatic data collection terminal, solar electric power supply system, lightning-protection system, host computer, wherein, digital sedimentometer is connected with the automatic data collection terminal by data line, the automatic data collection terminal is provided with wireless transport module, the automatic data collection terminal is by wireless transport module and host computer wireless connections, to realize that host computer is to the instruction control of automatic data collection terminal and the real-time Transmission of Monitoring Data; Solar electric power supply system is connected with the automatic data collection terminal, is the power supply of automatic data collection terminal; Lightning-protection system is connected with the automatic data collection terminal.
Described host computer is desktop computer or laptop computer.
Described wireless transport module is connected for the wireless network based on GPRS or CDMA with the connected mode of host computer.
Described solar electric power supply system comprises solar panel and accumulator, and solar panel is connected with accumulator, and accumulator is connected with the automatic data collection terminal.Preferably, can adopt the 75w solar panel, assembling 12v lithium electricity battery uses to satisfy long term monitoring.
Described digital sedimentometer can select that application number is 200920290890.9, publication number is the digital sedimentation device of CN 201567560U for use.
Described automatic data collection terminal is an existing device in the prior art, such as, can select the SENSLOG 1000X safety monitoring automated data acquisition system of Canadian Roctest company, 2380 data acquisition system (DAS)s of U.S. Geomation company, BGk-Micro-40 data acquisition system (DAS) of Ji Kang etc. for use, all can buy from the market.
Described lightning-protection system is an existing device in the prior art, such as, can be following form: comprise shaft tower, be arranged at the lightning rod of head of mast and be arranged at lightning-protection module on the automatic data collection terminal, during use, shaft tower is fixed near the automatic data collection terminal the electric pole or other buildingss, and lightning rod links to each other with burying underground with underground earth polar by downlead.
Principle of work is as follows: digital sedimentometer is connected with the automatic data collection terminal by data line, the automatic data collection terminal inserts the INTERNET net by wireless network (GPRS or CDMA), host computer inserts the INTERNET network, just can realize the real-time collection and the monitoring of data.Automatically measurement data is converted by the Monitoring Data analysis software is installed on host computer, directly physical quantity is monitored in output, and carries out real-time analysis, the purpose that gives warning in advance with arrival.
The utility model collection automatic monitoring, data transmission, data processing and early-warning and predicting are one, have easy and simple to handle, automaticity is high, monitoring is timely, advantage such as reliable.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Wherein, 1, host computer; 2, automatic data collection terminal; 3, wireless transport module; 4, accumulator; 5, solar panel; 6, lightning-protection system; 7, digital sedimentometer.
Embodiment
Below in conjunction with accompanying drawing the utility model is further described.
A kind of robotization settlement observation equipment, comprise digital sedimentometer, automatic data collection terminal, solar electric power supply system, lightning-protection system, host computer, as shown in Figure 1, wherein, digital sedimentometer is connected with the automatic data collection terminal by data line, the automatic data collection terminal is provided with wireless transport module, the automatic data collection terminal is by wireless transport module and host computer wireless connections, to realize that host computer is to the instruction control of automatic data collection terminal and the real-time Transmission of Monitoring Data; Solar electric power supply system is connected with the automatic data collection terminal, is the power supply of automatic data collection terminal; Lightning-protection system is connected with the automatic data collection terminal.
Described host computer is desktop computer or laptop computer.
Described wireless transport module is connected for the wireless network based on GPRS or CDMA with the connected mode of host computer.
Described solar electric power supply system comprises solar panel and accumulator, and solar panel is connected with accumulator, and accumulator is connected with the automatic data collection terminal.Preferably, can adopt the 75w solar panel, assembling 12v lithium electricity battery uses to satisfy long term monitoring.
Described digital sedimentometer can select that application number is 200920290890.9, publication number is the digital sedimentation device of CN 201567560U for use.
Described automatic data collection terminal is an existing device in the prior art, such as, can select the SENSLOG 1000X safety monitoring automated data acquisition system of Canadian Roctest company, 2380 data acquisition system (DAS)s of U.S. Geomation company, BGk-Micro-40 data acquisition system (DAS) of Ji Kang etc. for use, all can buy from the market.
Described lightning-protection system is an existing device in the prior art, such as, can be following form: comprise shaft tower, be arranged at the lightning rod of head of mast and be arranged at lightning-protection module on the automatic data collection terminal, during use, shaft tower is fixed near the automatic data collection terminal the electric pole or other buildingss, and lightning rod links to each other with burying underground with underground earth polar by downlead.

Claims (5)

1. robotization settlement observation equipment, it is characterized in that: comprise digital sedimentometer, automatic data collection terminal, solar electric power supply system, lightning-protection system, host computer, wherein, digital sedimentometer is connected with the automatic data collection terminal by data line, the automatic data collection terminal is provided with wireless transport module, and the automatic data collection terminal is by wireless transport module and host computer wireless connections; Solar electric power supply system is connected with the automatic data collection terminal; Lightning-protection system is connected with the automatic data collection terminal.
2. a kind of robotization settlement observation equipment according to claim 1, it is characterized in that: described host computer is desktop computer or laptop computer.
3. a kind of robotization settlement observation equipment according to claim 1 is characterized in that: described wireless transport module is connected for the wireless network based on GPRS or CDMA with the host computer ways of connecting.
4. a kind of robotization settlement observation equipment according to claim 1, it is characterized in that: described solar electric power supply system comprises solar panel and accumulator, and solar panel is connected with accumulator, and accumulator is connected with the automatic data collection terminal.
5. a kind of robotization settlement observation equipment according to claim 1 is characterized in that: described lightning-protection system comprises shaft tower, be arranged at the lightning rod of head of mast and be arranged at lightning-protection module on the automatic data collection terminal.
CN201120161075XU 2011-05-19 2011-05-19 Automatic settlement observation device Expired - Fee Related CN202074966U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120161075XU CN202074966U (en) 2011-05-19 2011-05-19 Automatic settlement observation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120161075XU CN202074966U (en) 2011-05-19 2011-05-19 Automatic settlement observation device

Publications (1)

Publication Number Publication Date
CN202074966U true CN202074966U (en) 2011-12-14

Family

ID=45113066

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120161075XU Expired - Fee Related CN202074966U (en) 2011-05-19 2011-05-19 Automatic settlement observation device

Country Status (1)

Country Link
CN (1) CN202074966U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103017827A (en) * 2012-12-11 2013-04-03 武汉理工大学 Multi-sensor real-time monitoring system for construction protection of bridges and culverts of business lines of railways
CN103267512A (en) * 2013-05-10 2013-08-28 河海大学 Apparatus for detecting tunnel continuous-settlement soil, and method thereof
CN104142137A (en) * 2013-09-13 2014-11-12 同济大学 Tunnel longitudinal settlement monitoring method and device based on wireless tilt sensor
CN105095671A (en) * 2015-08-24 2015-11-25 三峡集团西藏能源投资有限公司 Real-time sedimentation monitoring early warning instrument, system and achieving method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103017827A (en) * 2012-12-11 2013-04-03 武汉理工大学 Multi-sensor real-time monitoring system for construction protection of bridges and culverts of business lines of railways
CN103267512A (en) * 2013-05-10 2013-08-28 河海大学 Apparatus for detecting tunnel continuous-settlement soil, and method thereof
CN103267512B (en) * 2013-05-10 2015-04-08 河海大学 Apparatus for detecting tunnel continuous-settlement soil, and method thereof
CN104142137A (en) * 2013-09-13 2014-11-12 同济大学 Tunnel longitudinal settlement monitoring method and device based on wireless tilt sensor
CN104142137B (en) * 2013-09-13 2016-04-20 同济大学 A kind of tunnel Longitudinal Settlement monitoring method based on wireless tilt angle sensor and device
CN105095671A (en) * 2015-08-24 2015-11-25 三峡集团西藏能源投资有限公司 Real-time sedimentation monitoring early warning instrument, system and achieving method
CN105095671B (en) * 2015-08-24 2018-08-14 三峡集团西藏能源投资有限公司 Settle Monitoring and forecasting system in real-time instrument and system and implementation method

Similar Documents

Publication Publication Date Title
CN201277062Y (en) Mine water trouble monitoring and intelligent early-warning system
CN101118687A (en) System and method for real time remote wireless monitoring slope landslide
CN202074966U (en) Automatic settlement observation device
CN201555658U (en) Railway contact net vibration performance test device
CN105203158A (en) Automatic horizontal displacement and sedimentation monitoring system based on GPRS
CN103217953A (en) System and method for temperature control and crack prevention intelligent monitoring of concrete dam
CN106885602A (en) Transmission tower dynamic response monitoring system and its application under a kind of wind action
CN109872508A (en) Large surface mine landslide disaster method for early warning based on fiber grating
CN102455220B (en) Rail temperature monitoring method and device
CN109405924A (en) A kind of online remote supervision system of drainage pipeline networks liquid level and method
CN201237502Y (en) Automated monitoring system for dry sands of tailings reservoir
CN204027551U (en) A kind of dynamic rotary attitude measuring for drilling well
CN202928617U (en) Transmission line conducting wire icing and galloping on-line monitoring unit
CN203011379U (en) Inclination angle on-line monitoring system of transmission tower
CN102508321B (en) Method for forecasting ice coating of power grid
CN202393386U (en) Rainfall and water level monitoring equipment
CN206399414U (en) One kind is based on GPRS power transmission line line pole tower tilt detection systems
Liu et al. Design and implementation of monitoring and early warning system for urban roads waterlogging
CN209085710U (en) A kind of online remote supervision system of drainage pipeline networks liquid level
CN103243743B (en) Quantitative detection method of safe reliability of tower foundation of wind generator
CN204269106U (en) A kind of tunnel-type change monitoring system based on CORS base station
CN116484186A (en) Multi-field coupling-based rock burst intelligent early warning method and device
CN2687617Y (en) Cold area stratum deformation, stress and temperature monitoring device
CN207923112U (en) Ground Settlement Induced by Shield Tunnel Construction point intelligent integral auxiliary monitoring device
CN106225883A (en) Flood beacon

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111214

Termination date: 20120519