CN202055756U - 中搅新型扩大头结构 - Google Patents

中搅新型扩大头结构 Download PDF

Info

Publication number
CN202055756U
CN202055756U CN2011201536145U CN201120153614U CN202055756U CN 202055756 U CN202055756 U CN 202055756U CN 2011201536145 U CN2011201536145 U CN 2011201536145U CN 201120153614 U CN201120153614 U CN 201120153614U CN 202055756 U CN202055756 U CN 202055756U
Authority
CN
China
Prior art keywords
excavating
digging arm
arm
movable sleeve
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201536145U
Other languages
English (en)
Inventor
谢晓东
卢寿根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Chengdi Construction Co., Ltd.
Original Assignee
SHANGHAI CHENGDI CONSTRUCTION DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI CHENGDI CONSTRUCTION DEVELOPMENT Co Ltd filed Critical SHANGHAI CHENGDI CONSTRUCTION DEVELOPMENT Co Ltd
Priority to CN2011201536145U priority Critical patent/CN202055756U/zh
Application granted granted Critical
Publication of CN202055756U publication Critical patent/CN202055756U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

本实用新型公开了中搅新型扩大头结构,包括挖掘头、挖掘杆、活动套、上挖掘臂、下挖掘臂,所述的挖掘头安装在挖掘杆的下端,所述的活动套安装在挖掘杆上,所述的活动套两侧活动连接有上挖掘臂,所述的上挖掘臂另一端与下挖掘臂活动连接,所述的下挖掘臂另一端与挖掘杆活动连接,所述的上挖掘臂与下挖掘臂形成菱形状设置,所述的活动套可以在挖掘杆上移动,所述的上挖掘臂和下挖掘臂可以沿着挖掘杆自由转动。本实用新型具有扩大桩体下沉过程中搅土直径的优点。

Description

中搅新型扩大头结构
技术领域
本实用新型涉及中搅新型扩大头结构主要应用于民用及其工业基础设施建设中,用于在打地基过程中的钻头结构
背景技术
目前在民用或公用设施中,在民用或者公用建筑物的建设过程中,为了使得建筑物造的更高更稳定,在建筑物建立起来之前,对地基的加固一般都是用管桩或者方桩安插在地下,起到支撑建筑物的作用,作为管桩或者方桩一般都是通过下压的方式将其压入土中,但是由于通过下压的方式,由于下压产生的力度要求很大,施工起来不方便,同时如果通过下压会产生挤土的现象产生,不利于桩与桩之间的平衡性问题。
实用新型内容
为了克服现有状况的不足,不能满足建筑物发展的要求,本实用新型在原来的钻杆下端设置有一个扩大头结构,在钻杆下钻的过程中将土层扩大搅拌,使得压桩过程更加简单,同时不会产生挤土现象。
本实用新型是这样实现的,中搅新型扩大头结构,包括挖掘头、挖掘杆、活动套、上挖掘臂、下挖掘臂,所述的挖掘头安装在挖掘杆的下端,所述的活动套安装在挖掘杆上,所述的活动套两侧活动连接有上挖掘臂,所述的上挖掘臂另一端与下挖掘臂活动连接,所述的下挖掘臂另一端与挖掘杆活动连接,所述的上挖掘臂与下挖掘臂形成菱形状设置,所述的活动套可以在挖掘杆上移动,所述的上挖掘臂和下挖掘臂可以沿着挖掘杆自由转动。
所述的下挖掘臂上均匀设置有数个挖掘刀,所述的挖掘杆底部设置有喷气喷浆孔。
本实用新型具有以下明显的优势和特点:
1)能够更大地扩大搅土和扩大喷浆的范围;
2)更加有利于桩的下沉,有利于打桩的效率。
附图说明
图1是本实用新型中搅新型扩大头结构的展开图;
图2是本实用新型中搅新型扩大头结构的收缩状态图;
其中:1-挖掘头;2-挖掘杆;3-活动套;4-上挖掘臂;5-挖掘刀;6-下挖掘臂;7-喷气喷浆孔
具体实施方式
中搅新型扩大头结构,包括挖掘头1、挖掘杆2、活动套3、上挖掘臂4、下挖掘臂6,所述的挖掘头1安装在挖掘杆2的下端,所述的活动套3安装在挖掘杆2上,所述的活动套3两侧活动连接有上挖掘臂4,所述的上挖掘臂4另一端与下挖掘臂6活动连接,所述的下挖掘臂6另一端与挖掘杆2活动连接,所述的上挖掘臂4与下挖掘臂6形成菱形状设置,所述的活动套3可以在挖掘杆2上移动,所述的上挖掘臂4和下挖掘臂6可以沿着挖掘杆2自由转动。
所述的下挖掘臂6上均匀设置有数个挖掘刀5。所述的挖掘杆2底部设置有喷气喷浆孔7。
如图1所示,为本实用新型中搅新型扩大头结构的展开图,图中活动套3处于挖掘杆2的下部位,此时上挖掘臂4和下挖掘臂6进行了展开,形成了一个菱形状态,挖掘杆2的转动带动上挖掘臂4和下挖掘臂6跟随挖掘杆2转动,挖掘刀5此时起到更加有利挖掘的作用,在挖掘杆2转动的过程中,上挖掘臂4和下挖掘臂6转动搅土,使得搅土的直径加大,更加有利于桩体的下沉;图2中为实用新型中搅新型扩大头结构的收缩状态图,当搅土工作完成后,活动套3往上移动,上挖掘臂4和下挖掘臂6收拢,紧靠挖掘杆2,此时将整个扩大头向上提起,减小了往上拉力,从而实现了整个搅土的工作。
最后应说明的是:以上实施例仅用以说明本实用新型而并非限制本实用新型所描述的技术方案;因此,尽管本说明书参照上述的各个实施例对本实用新型已进行了详细的说明,但是,本领域的普通技术人员应当理解,仍然可以对本实用新型进行修改或等同替换;而一切不脱离实用新型的精神和范围的技术方案及其改进,其均应涵盖在本实用新型的权利要求范围当中。

Claims (3)

1.中搅新型扩大头结构,包括挖掘头、挖掘杆、活动套、上挖掘臂、下挖掘臂,其特征在于:所述的挖掘头安装在挖掘杆的下端,所述的活动套安装在挖掘杆上。
2.根据权利要求1所述的中搅新型扩大头结构,其特征在于:所述的活动套两侧活动连接有上挖掘臂,所述的上挖掘臂另一端与下挖掘臂活动连接,所述的下挖掘臂另一端与挖掘杆活动连接,所述的上挖掘臂与下挖掘臂形成菱形状设置,所述的上挖掘臂和下挖掘臂可以沿着挖掘杆自由转动。
3.根据权利要求1所述的中搅新型扩大头结构,其特征在于:所述的下挖掘臂上均匀设置有数个挖掘刀。
CN2011201536145U 2011-05-13 2011-05-13 中搅新型扩大头结构 Expired - Fee Related CN202055756U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201536145U CN202055756U (zh) 2011-05-13 2011-05-13 中搅新型扩大头结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201536145U CN202055756U (zh) 2011-05-13 2011-05-13 中搅新型扩大头结构

Publications (1)

Publication Number Publication Date
CN202055756U true CN202055756U (zh) 2011-11-30

Family

ID=45015732

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201536145U Expired - Fee Related CN202055756U (zh) 2011-05-13 2011-05-13 中搅新型扩大头结构

Country Status (1)

Country Link
CN (1) CN202055756U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015901A (zh) * 2012-12-25 2013-04-03 张勇 扩孔器及其安装方法和操作方法
CN107630703A (zh) * 2017-10-23 2018-01-26 中铁八局集团第二工程有限公司 带叶片可伸缩管幕顶进钻头

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015901A (zh) * 2012-12-25 2013-04-03 张勇 扩孔器及其安装方法和操作方法
CN103015901B (zh) * 2012-12-25 2015-10-14 张勇 扩孔器及其安装方法和操作方法
CN107630703A (zh) * 2017-10-23 2018-01-26 中铁八局集团第二工程有限公司 带叶片可伸缩管幕顶进钻头

Similar Documents

Publication Publication Date Title
CN105887876B (zh) 一种现浇大直径组合薄壁螺纹管桩的施工方法及其成桩装置
CN103321244B (zh) 砂土地基既有建筑增设地下室的施工方法
CN102286984A (zh) 一种止水帷幕及其施工方法
CN104563148A (zh) 建筑桩基施工方法
CN103556628B (zh) 螺旋锥体挤土桩施工方法
JPWO2004035942A1 (ja) 杭の中掘工法、基礎杭構造
CN201395793Y (zh) 长螺旋高压喷射注浆搅拌成桩装置
KR20100086146A (ko) 다짐굴착을 이용한 복합말뚝 시공방법
CN109868826B (zh) 一种结构牢固的基坑及其土方开挖方法
CN202055756U (zh) 中搅新型扩大头结构
CN102839661A (zh) 旋搅喷射锚管桩施工工艺
CN105544579A (zh) 一种桩基的施工方法
CN1635228A (zh) 一种钻孔扩底灌注桩及其制作方法
CN107700508A (zh) 一种型钢搅喷水泥土帷幕支护桩的施工方法
CN107687167A (zh) 一种工字钢微型桩成桩方法
CN102535452A (zh) 一种新型工程桩
CN204252120U (zh) 混凝土桩的施工装置
CN204225101U (zh) 混凝土桩的施工装置
CN202865842U (zh) 多功能植桩机
CN102220760B (zh) 深度倒t型桩的浇铸方法
JP3753732B1 (ja) 基礎杭建て込み工法
CN101338560A (zh) 钢筋混凝土桩的施工方法
JP4074198B2 (ja) 既設杭の撤去方法
CN102979095A (zh) 超硬土层三轴水泥土搅拌桩施工方法
CN207700198U (zh) 一种超前支撑支护结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI CHENGDI CONSTRUCTION CO., LTD.

Free format text: FORMER NAME: SHANGHAI CHENGDI CONSTRUCTION DEVELOPMENT CO., LTD.

CP03 Change of name, title or address

Address after: 201806 B, zone 502-1, Lane 518, Lane 1, Jiading District, Shanghai

Patentee after: Shanghai Chengdi Construction Co., Ltd.

Address before: 200000 room 1, building 188, 126 Nanan Road, Anting Town, Shanghai, Jiading District

Patentee before: Shanghai Chengdi Construction Development Co., Ltd.

DD01 Delivery of document by public notice

Addressee: Bao Ming

Document name: Notification of Passing Examination on Formalities

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111130

Termination date: 20200513