CN202047594U - Fixing tool for rows of pipes of distribution box - Google Patents

Fixing tool for rows of pipes of distribution box Download PDF

Info

Publication number
CN202047594U
CN202047594U CN2011201081008U CN201120108100U CN202047594U CN 202047594 U CN202047594 U CN 202047594U CN 2011201081008 U CN2011201081008 U CN 2011201081008U CN 201120108100 U CN201120108100 U CN 201120108100U CN 202047594 U CN202047594 U CN 202047594U
Authority
CN
China
Prior art keywords
setting tool
steel pipe
becomes
fixing tool
comb
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201081008U
Other languages
Chinese (zh)
Inventor
王海鱼
李志钱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Original Assignee
Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd filed Critical Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority to CN2011201081008U priority Critical patent/CN202047594U/en
Application granted granted Critical
Publication of CN202047594U publication Critical patent/CN202047594U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model discloses a fixing tool for rows of pipes of a distribution box. The fixing tool is strip-shaped, a plurality of partition boards for separating steel pipes are arranged in the middle of the fixing tool, and the space between adjacent partition boards is matched with the diameters of the laid steel pipes. The fixing tool has a simple structure, the rows of pipes can be well fixed, and a great convenience is provided for laying construction of the steel pipes.

Description

Switchbox becomes the setting tool of comb
[technical field]
The utility model relates to the building operations aid, relates in particular to a kind of steel pipe that is used for and secretly joins the setting tool that the construction switchbox becomes comb.
[background technology]
In the laid processes of main body steel pipe, the switchbox place becomes the conventional fixed method of comb to be, will become comb to arrange according to loop order, direction, fixes with bar dowel spot welding.The weak point of this kind fixing means is, spot welding must two people's coordinative constructions fixedly the time, when especially the loop is many, and more bad operation; Spacing, verticality are not easy control.And because steel pipe spot welding is fixed on the reinforcing bar, each loop placing direction can not adjust again.Be easy to cause impression not good, and very inconvenient in the operation.
[summary of the invention]
The technical problems to be solved in the utility model provides a kind of steel pipe that is used for convenient to use and secretly joins the setting tool that the construction switchbox becomes comb.
In order to solve the problems of the technologies described above, the technical solution adopted in the utility model is, a kind of switchbox becomes the comb setting tool, and setting tool is a strip, and there are a plurality of dividing plates that steel pipe is separated of being used for the centre, and clapboard spacing is suitable with the diameter of steel tube that is laid.
As preferably, described setting tool has manhole with the building block of concrete prefabricated one-tenth strip in the centre of building block, is provided with dividing plate between the through hole.
As preferably, described setting tool is made with the strip steel plate, is welded with elastic baffle on the steel plate.
As preferably, described elastic baffle forms buckle, in the middle of steel pipe can imbed dividing plate from snap open.
The beneficial effects of the utility model are, and are simple in structure, can greatly make things convenient for the steel pipe cable laying operation quickly with becoming comb fix.
[description of drawings]
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail.
Fig. 1 is the structural representation that the utility model becomes comb setting tool embodiment 1.
Fig. 2 is the structural representation that the utility model becomes comb setting tool embodiment 2.
Fig. 3 is the structural representation that the utility model becomes comb setting tool embodiment 3.
Among the figure, 1-dividing plate, 2-manhole, 3-base plate, 4-left clapboard, 5-right clapboard, 6-left clapboard, 7-right clapboard.
[specific embodiment]
Embodiment 1:
Fig. 1 is that a kind of switchbox becomes the comb setting tool, and setting tool is the building block with concrete prefabricated one-tenth elongate in shape, and the centre has a plurality of manholes 2, is provided with dividing plate 1 between the through hole, and the spacing of dividing plate is suitable with the diameter of steel tube that is laid.When laying steel pipe penetrated from manhole and get final product, this building block can directly be built into body of wall.
Embodiment 2:
Present embodiment is made with steel plate, is welded with elastic baffle on the base plate 3 of strip, and elastic baffle is divided into left clapboard 4 and right clapboard 5, and the head end of left clapboard 4 and right clapboard 5 staggers and forms the slit.When laying steel pipe is embedded from the slit and can be fixed, installing and instrument can taken out so that use next time again.
Embodiment 3:
Present embodiment is also made with steel plate, is welded with elastic baffle on the base plate 3 of strip, and elastic baffle is divided into left clapboard 6 and right clapboard 7, and the head end of left clapboard 6 and right clapboard 7 separates and forms buckle.When laying steel pipe is embedded from the slit and can be fixed, installing and instrument can taken out so that use next time again.
Abovely described three kinds of embodiments of the present utility model, but those skilled in the art can make various distortion or modification within the scope of the appended claims in conjunction with Fig. 1, Fig. 2 and Fig. 3.

Claims (4)

1. a switchbox becomes the comb setting tool, be used for secretly joining the fixing steel pipe that is laid of construction, it is characterized in that described setting tool is a strip at steel pipe, there are a plurality of dividing plates that steel pipe is separated of being used for the centre, and clapboard spacing is suitable with the diameter of steel tube that is laid.
2. switchbox according to claim 1 becomes the comb setting tool, it is characterized in that, described setting tool has manhole with the building block of concrete prefabricated one-tenth strip in the centre of building block, is provided with dividing plate between the through hole.
3. switchbox according to claim 1 becomes the comb setting tool, it is characterized in that, described setting tool is made with the strip steel plate, is welded with elastic baffle on the steel plate.
4. switchbox according to claim 3 becomes the comb setting tool, it is characterized in that, described elastic baffle forms buckle, in the middle of steel pipe can imbed dividing plate from snap open.
CN2011201081008U 2011-04-13 2011-04-13 Fixing tool for rows of pipes of distribution box Expired - Fee Related CN202047594U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201081008U CN202047594U (en) 2011-04-13 2011-04-13 Fixing tool for rows of pipes of distribution box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201081008U CN202047594U (en) 2011-04-13 2011-04-13 Fixing tool for rows of pipes of distribution box

Publications (1)

Publication Number Publication Date
CN202047594U true CN202047594U (en) 2011-11-23

Family

ID=44987907

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201081008U Expired - Fee Related CN202047594U (en) 2011-04-13 2011-04-13 Fixing tool for rows of pipes of distribution box

Country Status (1)

Country Link
CN (1) CN202047594U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104831924A (en) * 2015-05-29 2015-08-12 中建五局第三建设有限公司 Construction method for PVC piping of incoming and outgoing lines of distribution box at beam bottom
CN106801515A (en) * 2017-02-22 2017-06-06 中建八局第四建设有限公司 A kind of positioner for being preset to comb

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104831924A (en) * 2015-05-29 2015-08-12 中建五局第三建设有限公司 Construction method for PVC piping of incoming and outgoing lines of distribution box at beam bottom
CN106801515A (en) * 2017-02-22 2017-06-06 中建八局第四建设有限公司 A kind of positioner for being preset to comb

Similar Documents

Publication Publication Date Title
NZ604495A (en) Rebar clip for joining different size bars
CN202578718U (en) Locating system for embedded part at construction joint between tunnel invert and secondary lining
CN202047594U (en) Fixing tool for rows of pipes of distribution box
CN202767490U (en) Reverse-hanging impending mobile operating platform
CN104989149B (en) A kind of Civil building basement just before a battle converting system and construction method
CN203808517U (en) Electric tube penetrating construction structure in reinforced concrete summer beam
CN201605807U (en) Toilet pipe preformed hole mould
CN202280152U (en) Structure for arranging embedded part at bottom of reinforced concrete plate
CN204266571U (en) A kind of builder's jack i iron pre-embedded device
CN205035970U (en) Prefabricated orifice plate of loosing core into
CN202850041U (en) Reinforcing steel support for colligation of large-scale raft plate and ribbed beam base reinforcing steel
CN211714246U (en) Building wall body convenient to calandria wiring installation and preparation template, and mounting
CN102704669B (en) The total sub-semigroup mounting method of cross bar inserted sheet
CN201546371U (en) Bundled non-bonded prestressed rib anchorage system for large-diameter silo
CN202611015U (en) Junction self-locking type assembly wall body
CN214059472U (en) Simple BV wire pay-off rack
CN205444450U (en) Assembled garage is jointly construct with office
CN108930283A (en) The installation method of large-scale circular basis plank sheathing
CN110616848A (en) Pipeline wall-penetrating prefabricated unit and manufacturing tool
CN203320957U (en) Shear wall end form board cross section control tool
CN111306366A (en) Universal type comprehensive pipeline support mounting method
CN214301730U (en) Slope anchor for building municipal works
CN203082372U (en) Fixing device of concrete pre-buried conduit
CN208777704U (en) A kind of floor slab preformed hole constructing device
CN208280591U (en) Spliced attachment girder steel

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111123

Termination date: 20140413