CN202046782U - Freight construction lifter - Google Patents
Freight construction lifter Download PDFInfo
- Publication number
- CN202046782U CN202046782U CN2011200518934U CN201120051893U CN202046782U CN 202046782 U CN202046782 U CN 202046782U CN 2011200518934 U CN2011200518934 U CN 2011200518934U CN 201120051893 U CN201120051893 U CN 201120051893U CN 202046782 U CN202046782 U CN 202046782U
- Authority
- CN
- China
- Prior art keywords
- freight
- cages
- underframe
- guide rail
- lifting guide
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
The utility model discloses a freight construction lifter, relating to a lifter, aiming at providing a freight construction lifter with a safe operation and a simple installation. The freight construction lifter comprises an underframe, a lifting guide rail bracket, a hoisting machine, a platform, a cantilever ginpole, two suspension cages and falling protectors, wherein the lifting guide rail bracket is arranged on the underframe, and is formed by standard sections in a serial connection; the platform is arranged on the upper end of the lifting guide rail bracket, the cantilever ginpole is arranged on the platform, the two suspension cages are arranged on two sides of the lifting guide rail bracket, and the falling protectors are arranged on the two suspension cages respectively, the hoisting machine is horizontally fixed on the underframe, steel wire ropes of the hoisting machine are connected with the two suspension cages respectively through a movable pulley. The standard sections of the freight construction lifter are taken as the lifting guide rail bracket of the suspension cages of the machine, and heights of the standard sections can be randomly adjusted; the suspension cages are provided with the falling protectors, thereby realizing a function of preventing broken ropes from falling; the steel wire ropes of the novel hoisting machine and the movable pulley are taken as a motive force; thus, the freight construction lifter has a high safety performance and a simple installation.
Description
Technical field
The utility model relates to elevator, is specifically related to a kind of shipping building hoist.
Background technology
In recent years, China's building exploitation amount is very big, construction enterprises and what use is the self-hoisting door type simplified elevator always, there is bigger potential safety hazard, big Minor Accident takes place frequently, national quality supervision general bureau stopped paying out the manufacturing license of simplified elevator in 2009, forbid to continue to use the simplified elevator of having eliminated, and also do not occur the substitute of simplified elevator till now.
Summary of the invention
The purpose of this utility model is to provide a kind of shipping building hoist, to reach safety of operation, simple purpose is installed.
The present invention adopts following technical scheme to realize:
The shipping building hoist, comprise underframe, riser guide frame, winch, platform, gin pole, two cages, falling protector, wherein riser guide is erected on the underframe, is composed in series by standard knot, riser guide frame upper end erecting stage, gin pole is installed on the platform, and two cages are located at riser guide frame both sides, are equipped with falling protector on two cages, the winch crosswise fixed is on underframe, and the steel rope of winch links to each other with two cages respectively by movable pulley.
Compared with prior art, standard knot of the present utility model is as the riser guide frame of this machine cage, but its height of regulated at will; Cage has been installed falling protector, can play the anti-fall effect of disconnected rope, with novel winch steel rope, movable pulley as starting power; Cheap, only be 1/3rd of existing SC people's goods building hoist price; The safety performance height is installed simple.
Description of drawings
Fig. 1 is a front view of the present utility model;
Fig. 2 is a birds-eye view of the present utility model;
Among the figure:1-underframe, 2-riser guide frame, 3-winch, 4-platform, 5-gin pole, 6-cage, 7-falling protector, 8-standard knot, 9-steel rope, 10-movable pulley.
The specific embodiment
As shown in Figure 1, 2, a kind of shipping building hoist, comprise underframe 1, riser guide frame 2, winch 3, platform 4, gin pole 5, two cages 6, falling protector 7, wherein riser guide frame 2 is located on the underframe 1, compose in series by standard knot 8, riser guide frame upper end erecting stage 4, gin pole 5 is installed on the platform 4, two cages 6 are located at 2 both sides of riser guide, be equipped with falling protector 7 on two cages 6, the winch crosswise fixed is on underframe 1, and the steel rope 9 of winch 3 passes through movable pulley 10 and links to each other with two cages 6 respectively.
Claims (1)
1. shipping building hoist, it is characterized in that comprising underframe (1), riser guide frame (2), winch (3), platform (4), gin pole (5), two cages (6), falling protector (7), wherein riser guide frame (2) is located on the underframe (1), compose in series by standard knot (8), riser guide frame upper end erecting stage (4), platform (4) is gone up gin pole (5) is installed, two cages (6) are located at riser guide (2) frame both sides, be equipped with falling protector (7) on two cages (6), the winch crosswise fixed is on underframe (1), and the steel rope (9) of winch (3) passes through movable pulley (10) and links to each other with two cages (6) respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200518934U CN202046782U (en) | 2011-03-02 | 2011-03-02 | Freight construction lifter |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200518934U CN202046782U (en) | 2011-03-02 | 2011-03-02 | Freight construction lifter |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202046782U true CN202046782U (en) | 2011-11-23 |
Family
ID=44987100
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011200518934U Expired - Fee Related CN202046782U (en) | 2011-03-02 | 2011-03-02 | Freight construction lifter |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202046782U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102795530A (en) * | 2012-08-16 | 2012-11-28 | 东华大学 | Elevator with supporting rod type safety device |
TWI486300B (en) * | 2011-12-20 | 2015-06-01 | Shenzhen Techen Technology Co Ltd | A material lift platform and its method of use. |
CN105271072A (en) * | 2015-11-05 | 2016-01-27 | 都书鹏 | Sliding trolley interaction repeated lifting device of 3D building printer |
CN110038870A (en) * | 2019-04-27 | 2019-07-23 | 哈尔滨鸿固环境工程有限公司 | A kind of intelligence collecting light-operated anti-fall illumination searches dust hood |
-
2011
- 2011-03-02 CN CN2011200518934U patent/CN202046782U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI486300B (en) * | 2011-12-20 | 2015-06-01 | Shenzhen Techen Technology Co Ltd | A material lift platform and its method of use. |
CN102795530A (en) * | 2012-08-16 | 2012-11-28 | 东华大学 | Elevator with supporting rod type safety device |
CN105271072A (en) * | 2015-11-05 | 2016-01-27 | 都书鹏 | Sliding trolley interaction repeated lifting device of 3D building printer |
CN110038870A (en) * | 2019-04-27 | 2019-07-23 | 哈尔滨鸿固环境工程有限公司 | A kind of intelligence collecting light-operated anti-fall illumination searches dust hood |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204454140U (en) | A kind of Pop-up falling proof device of lifting means | |
CN204751773U (en) | Fight and carry formula lifting machine with prevent protection device that falls | |
CN202046782U (en) | Freight construction lifter | |
CN104453201A (en) | Automatic ascending and descending type material platform | |
CN202245610U (en) | Speed limiter | |
CN201914799U (en) | Elevator compensation chain breakage safety protecting structure | |
CN205637536U (en) | A carry and hang device for climbing frame | |
CN205555796U (en) | Car elevating gear of elevator | |
CN103496622B (en) | With the elevator of rope broken protector | |
CN201793300U (en) | Elevator | |
CN202508723U (en) | Novel construction lifter | |
CN102874709B (en) | A kind of transversely movable double pulleies unit vertical lifting equipment | |
CN202670960U (en) | Safe and energy-saving construction elevator | |
CN202296676U (en) | Safety protection device for elevator | |
CN201473146U (en) | Trackless elevator | |
CN204434023U (en) | The anti-displacement lock of gear type elevator cab | |
CN103738809A (en) | Elevator car buffer braking method and device not meeting retention working condition | |
CN103640941A (en) | Elevator falling prevention and protection device | |
CN204416834U (en) | A kind of building hoist protection mechanism | |
CN204751968U (en) | From rising special lifting device power supply cable protection device | |
CN203545378U (en) | Buffering and braking device of elevator cab not meeting retention working condition | |
CN205023653U (en) | Be applied to equipment of natural draft hyperbola cooling tower inner wall construction | |
CN207108183U (en) | A kind of elevator overcoat pulley leading truck jacking system | |
CN202324581U (en) | Anti-falling safety device of integral lifting scaffold | |
CN103693535A (en) | Elevator traction device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111123 Termination date: 20130302 |