CN202042820U - 一种穿刺线夹传送杆 - Google Patents
一种穿刺线夹传送杆 Download PDFInfo
- Publication number
- CN202042820U CN202042820U CN2011200211860U CN201120021186U CN202042820U CN 202042820 U CN202042820 U CN 202042820U CN 2011200211860 U CN2011200211860 U CN 2011200211860U CN 201120021186 U CN201120021186 U CN 201120021186U CN 202042820 U CN202042820 U CN 202042820U
- Authority
- CN
- China
- Prior art keywords
- insulating bar
- wire clip
- clamp
- penetrating cable
- cable clamp
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Connections Effected By Soldering, Adhesion, Or Permanent Deformation (AREA)
Abstract
本实用新型公开了一种穿刺线夹传送杆,它包括绝缘杆和线夹输送装置,绝缘杆和线夹输送装置之间固定连接有连接头,其特征在于:所述线夹输送装置包括连接头顶端连接的方形固定板,固定板的两侧垂直方向安装有两个与穿刺线夹相配合的夹线槽。本实用新型取代了传统的直接作业法,克服了作业人员需要爬高、操作繁琐、安全隐患大的缺陷,具有安全可靠、使用方便的特点。
Description
技术领域
本实用新型涉及10千伏绝缘线路操作杆式旁路作业工具,具体地指一种穿刺线夹传送杆。
技术背景
配网线路的供电,要求具有一定的连续性和可靠性,行业里通常利用穿刺线夹进行配网线路的检修和带电作业。目前,国内在使用穿刺线夹时,须由作业人员近距离安装,超出人的手臂范围时必须爬高进行安装,不仅操作繁琐,而且安全性低,通常还需要停电开展相关工作,影响整个线路的正常供电。
现有的配网线路供电作业中所采用的间接作业工具,设计制作较为简单,绝缘操作杆的灵活性、绝缘性受到极大的限制,在运行时,导致引流线与主导线间的紧固力不够,容易引起接头部位发热,影响到主导线金属材料性质并烧损断线,存在严重的安全隐患。
发明内容
本实用新型的目的是提供一种用于在远距离的配电线路上安装穿刺线夹用传送杆,穿刺线夹与操作杆配套使用,实现配电线路上绝缘导线远距离带电搭接作业,解决远距离传送穿刺线夹存在的安全性、灵活性的问题。
为实现此目的,本实用新型所设计的一种穿刺线夹传送杆,它包括绝缘杆和线夹输送装置,绝缘杆和线夹输送装置之间固定连接有连接头,所述线夹输送装置包括连接头顶端连接的方形固定板,固定板的两侧垂直方向安装有两个与穿刺线夹相配合的夹线槽。
进一步地,所述固定板上安装有与夹线槽垂直的挡板。
进一步地,上述绝缘杆包括绝缘杆本体,绝缘杆本体的两端分别套装有绝缘护套,绝缘杆本体的底端设有堵头,绝缘杆本体的顶端固定连接所述的连接头。
进一步地,所述连接头的中间位置设有一圈径向凸起或凹下的定位环。
本实用新型的优点在于:
1、本实用新型的线夹输送装置上设有位置相对固定的夹线槽,夹线槽与穿刺线夹相配合使用,线夹输送装置与绝缘杆之间通过连接头相互连接,使用时,仅需要将线夹输送装置与穿刺线夹进行固定,举起绝缘杆即可将穿刺线夹举送到10KV配电线路架空绝缘导线安装处,实现了操作人员无需爬高,在地面即可安全带电作业;
2、绝缘杆本体的两端分别套装有绝缘护套,绝缘杆本体的底端设有堵头,增加了绝缘杆的绝缘性能,高压带电操作安全可靠;
3、连接绝缘杆和线夹输送装置的连接头的中间位置设有一圈径向凸起或凹下的定位环,使用前便于连接安装,连接牢固;使用后便于拆卸安放,使用方便。
综上所述,在10KV配电线路架空绝缘导线安装时,本实用新型取代了传统的直接作业法,克服了作业人员需要爬高、操作繁琐、安全隐患大的缺陷,具有安全可靠、使用方便的特点。
附图说明
图1为本实用新型的整体结构示意图。
图中,1、绝缘杆,1.1、绝缘杆本体,1.2、护套,1.3、堵头,2、连接头,3、线夹输送装置,3.1、固定板,3.2、夹线槽,3.3、挡板。
具体实施方式
以下结合附图和实施例对本实用新型作进一步的详细说明:
如图1所示的穿刺线夹传送杆,包括绝缘杆1和线夹输送装置3,绝缘杆1和线夹输送装置3之间固定连接有连接头2,线夹输送装置3包括连接头2顶端连接的方形固定板3.1,固定板3.1的两侧垂直方向安装有两个夹线槽3.2,该夹线槽3.2与穿刺线夹相配合的。
固定板3.1上通过螺栓固定安装有与夹线槽3.2垂直的挡板3.3。绝缘杆1包括绝缘杆本体1.1,绝缘杆本体1.1的两端分别套装有绝缘护套1.2,绝缘杆本体1.1的底端设有堵头1.3,绝缘杆本体1.1的顶端固定连接连接头2。连接头2的中间位置设有一圈径向凸起或凹下的定位环。
本实用新型所针对的穿刺线夹通常主要包括增强壳体、穿刺刀片、密封垫、防水硅脂、高强度螺栓、力矩螺母和电缆终端帽套,当电缆需做分支或接续时,将电缆分支线终端插入穿刺线夹的防水终端帽套中,确定好主线分支位置后,用套筒扳手拧线夹上的力矩螺母,过程中接触刀片会刺穿电缆绝缘层,与导体接触,密封垫环压电缆被穿刺位置的周围,壳体内硅脂溢出,当力矩达到设定值时,螺母力矩机构脱落,主线和支线被接通,且防水性能和电气效果达到要求的标准参数。使用本实用新型时,只需人工将穿刺线夹传送杆的线夹输送装置3与穿刺线夹进行固定,然后举送到两导线连接处,解决了绝缘穿刺线夹安全稳定地举送(运送)问题,然后将需要安装或者架设的架空绝缘导线分别插入穿刺线夹上的两个孔,用带有套筒扳手的绝缘操作杆将穿刺线夹上螺柱拧紧,进一步解决绝缘导线连接安装问题。
Claims (4)
1.一种穿刺线夹传送杆,包括绝缘杆和线夹输送装置,绝缘杆和线夹输送装置之间固定连接有连接头,其特征在于:所述线夹输送装置包括连接头顶端连接的方形固定板,固定板的两侧垂直方向安装有两个与穿刺线夹相配合的夹线槽。
2.根据权利要求1所述的穿刺线夹传送杆,其特征在于:所述固定板上安装有与夹线槽垂直的挡板。
3.根据权利要求1所述的穿刺线夹传送杆,其特征在于:所述绝缘杆包括绝缘杆本体,绝缘杆本体的两端分别套装有绝缘护套,绝缘杆本体的底端设有堵头,绝缘杆本体的顶端固定连接所述的连接头。
4.根据权利要求1或3所述的穿刺线夹传送杆,其特征在于:所述连接头的中间位置设有一圈径向凸起或凹下的定位环。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200211860U CN202042820U (zh) | 2011-01-24 | 2011-01-24 | 一种穿刺线夹传送杆 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200211860U CN202042820U (zh) | 2011-01-24 | 2011-01-24 | 一种穿刺线夹传送杆 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202042820U true CN202042820U (zh) | 2011-11-16 |
Family
ID=44970246
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011200211860U Expired - Fee Related CN202042820U (zh) | 2011-01-24 | 2011-01-24 | 一种穿刺线夹传送杆 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202042820U (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102832524A (zh) * | 2012-09-06 | 2012-12-19 | 七台河电业局 | 鼠夹式地线夹的绝缘操作杆 |
CN102969673A (zh) * | 2012-12-09 | 2013-03-13 | 安徽省电力公司蚌埠供电公司 | 绝缘穿刺线夹安装装置 |
CN103683093A (zh) * | 2013-11-26 | 2014-03-26 | 国家电网公司 | 一种电力架空导线绝缘操作杆 |
CN109244936A (zh) * | 2018-09-28 | 2019-01-18 | 中科院合肥技术创新工程院 | 一种并沟线夹电动安装工具 |
CN110797802A (zh) * | 2019-11-30 | 2020-02-14 | 国网江苏省电力有限公司东海县供电分公司 | 地电位穿刺安装用张力杆 |
-
2011
- 2011-01-24 CN CN2011200211860U patent/CN202042820U/zh not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102832524A (zh) * | 2012-09-06 | 2012-12-19 | 七台河电业局 | 鼠夹式地线夹的绝缘操作杆 |
CN102832524B (zh) * | 2012-09-06 | 2016-02-17 | 七台河电业局 | 鼠夹式地线夹的绝缘操作杆 |
CN102969673A (zh) * | 2012-12-09 | 2013-03-13 | 安徽省电力公司蚌埠供电公司 | 绝缘穿刺线夹安装装置 |
CN102969673B (zh) * | 2012-12-09 | 2017-09-01 | 国家电网公司 | 绝缘穿刺线夹安装装置 |
CN103683093A (zh) * | 2013-11-26 | 2014-03-26 | 国家电网公司 | 一种电力架空导线绝缘操作杆 |
CN109244936A (zh) * | 2018-09-28 | 2019-01-18 | 中科院合肥技术创新工程院 | 一种并沟线夹电动安装工具 |
CN110797802A (zh) * | 2019-11-30 | 2020-02-14 | 国网江苏省电力有限公司东海县供电分公司 | 地电位穿刺安装用张力杆 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202042820U (zh) | 一种穿刺线夹传送杆 | |
CN203288783U (zh) | 验电式高压接地线棒 | |
CN203415716U (zh) | 电力系统带电操作接线夹 | |
CN103268991A (zh) | 用于10kv电缆分支箱、环网柜、环网箱的接地装置 | |
CN201548642U (zh) | 高压试验接线杆 | |
CN104535804A (zh) | 一种便携式电流互感器测试钳 | |
CN202134674U (zh) | 线缆包覆式接地线挂钩 | |
CN204439667U (zh) | 一种便携式电流互感器测试钳 | |
CN104143785A (zh) | 10kV带电接支接线路引线的作业方法及装置 | |
CN203218466U (zh) | 电缆绝缘刺锥接地装置 | |
CN201233972Y (zh) | 多功能接电头 | |
CN101409386A (zh) | 多功能接电头 | |
CN205123110U (zh) | 一种架空配电线路带电剪接火的自动装置 | |
CN203895633U (zh) | 适用于箱变和配电室的短路接地线 | |
CN203690799U (zh) | 一种带电更换直线转角塔绝缘子串的装置 | |
CN203398357U (zh) | 用于10kV电缆分支箱、环网柜、环网箱的接地装置 | |
CN205609783U (zh) | 一种应急短接管状线夹 | |
CN105186367A (zh) | 一种架空配电线路带电剪接火的自动装置 | |
CN106469892A (zh) | 一种融冰线缆挂接装置 | |
CN206649951U (zh) | 一种故障指示防雷装置 | |
CN204068041U (zh) | 用于10kV架空配电设备的绝缘隔离固定装置 | |
CN202434988U (zh) | 10kV跌落熔丝电缆验电接地线 | |
CN202453559U (zh) | 地线融冰分段绝缘光缆接头盒 | |
CN202550391U (zh) | 高压电力维修器具 | |
CN102565975B (zh) | 地线融冰分段绝缘光缆接头盒 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111116 Termination date: 20150124 |
|
EXPY | Termination of patent right or utility model |