CN202007479U - Floor slab reinforcing steel bar positioning device - Google Patents

Floor slab reinforcing steel bar positioning device Download PDF

Info

Publication number
CN202007479U
CN202007479U CN2011200842711U CN201120084271U CN202007479U CN 202007479 U CN202007479 U CN 202007479U CN 2011200842711 U CN2011200842711 U CN 2011200842711U CN 201120084271 U CN201120084271 U CN 201120084271U CN 202007479 U CN202007479 U CN 202007479U
Authority
CN
China
Prior art keywords
reinforcing steel
floor slab
positioning device
steel bars
steel bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200842711U
Other languages
Chinese (zh)
Inventor
冯永德
江秀明
张波
关宏生
邱宝刚
郑君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANSHAN SANYE CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
ANSHAN SANYE CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANSHAN SANYE CONSTRUCTION ENGINEERING Co Ltd filed Critical ANSHAN SANYE CONSTRUCTION ENGINEERING Co Ltd
Priority to CN2011200842711U priority Critical patent/CN202007479U/en
Application granted granted Critical
Publication of CN202007479U publication Critical patent/CN202007479U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model relates to a floor slab reinforcing steel bar positioning device, which is characterized in that reinforcing steel bars are in cold bending to form the floor slab reinforcing steel bar positioning device which is a 'door'-shaped structure, a concave pocket I which supports upper reinforcing steel bars is arranged at the top of the floor slab reinforcing steel bar positioning device, supporting legs are arranged on two sides of the concave pocket I, concave pockets II for supporting lower reinforcing steel bars are disposed on the supporting legs, three to four projections are disposed on the bottom plane of the two supporting legs, the distance from each concave pocket II to the bottom plane of the supporting legs is equal to the thickness of a protecting layer, and antirust layers are coated on the projections. The reinforcing steel bars are cold drawn wires with diameters ranging from 4mm to 6mm. Compared with the prior art, the floor slab reinforcing steel bar positioning device has the advantages that 1), during construction of subdivisional work of formworks, the positioning device firmly contacts with a floor slab formwork, the thickness of the protecting layer of the lower reinforcing steel bars of a floor slab can be guaranteed effectively, 2), during construction of subdivisional work of the reinforcing steel bars, the positioning device can position the upper reinforcing steel bars of the floor slab, further can position the lower reinforcing steel bars of the floor slab and is convenient for construction, and 3), during construction of decoration work of a ceiling, the antirust layers are coated at contact positions of the positioning device and formworks, and accordingly the quality of the decoration work of the ceiling is guaranteed effectively.

Description

The floor bar positioner
Technical field
The utility model relates to worker China Democratic National Construction Association field, relates in particular to a kind of floor bar positioner.
Background technology
In building engineering construction, run into the casting reinforced concrete floor through regular meeting; in the installation process of floor bar; in order to guarantee the thickness of floor bar concrete cover; generally the method for Cai Yonging is to use the marble cushion block between floor slab bottoms reinforcing bar and the template; cushion block is high in the thickness of topping; the reinforcing bar split heads that the floor upper reinforcement adopts field machining to make, or the cement mortar split heads supports.Be to guarantee rigidity requirement, the reinforcing bar split heads that field machining is made generally adopts the indented bars of diameter 12mm to make, and cost is very high, and the reinforcing bar stirrup directly contacts with template, and ceiling the rust phenomenon often occurs returning after scraping Da Bai.In addition, the reinforcing bar split heads that field machining is made can only be located the reinforcing bar of floor slab tops, and the reinforcing bar of floor slab bottoms can only support with the marble cushion block, and it is not firm to connect, and the marble cushion block often is shifted, and makes reinforcing bar contact template, can't guarantee the thickness of topping.Emerging cement mortar cushion block cost is low, but intensity is too low, does not far reach the intensity of floorslab concrete.
Summary of the invention
The purpose of this utility model provides a kind of floor bar positioner, overcomes the deficiencies in the prior art, can support floor upper reinforcement and lower rebar simultaneously, guarantees the floor slab bottoms protective layer thickness, and prevents that ceiling from returning rust.
For solving the problems of the technologies described above, the technical solution of the utility model is:
The floor bar positioner; form by the reinforcing bar clod wash; " door " shape structure; the top is provided with a recessed pocket one that supports upper reinforcement; both sides are provided with supporting leg, and supporting leg is provided with recessed pocket two, the two supporting leg base plane that support lower rebar and is provided with 3~4 place's projectioies; recessed pocket two is a protective layer thickness with supporting leg base plane distance, is coated with on the described projection and is brushed with antirust coat.
Described reinforcing bar is the cold drawn wire of diameter 4mm~6mm.
Compared with prior art, the beneficial effects of the utility model are:
1) in the template the work items construction stage of reinforced concrete floor, it is firm that positioner contacts with slab form, can effectively guarantee the thickness of floor bottom reinforcement cover.
2) in the reinforcement installation subitem construction stage of reinforced concrete floor, positioner can be located the floor upper reinforcement, can locate underfloor reinforcing bar, convenient construction again.
3) at the ceiling decoration Construction stage, positioner and template contact position brushing antirust coat have guaranteed the quality of ceiling decoration engineering effectively.
Description of drawings
Fig. 1 is the utility model example structure schematic diagram;
Fig. 2 is the lateral view of Fig. 1;
Fig. 3 is the utility model embodiment axis side view.
Among the figure: the recessed pocket two 6-supporting leg 7-projection of recessed pocket one 5-of 1-cold drawn wire 2-upper reinforcement 3-lower rebar 4-8-template
The specific embodiment
Below in conjunction with accompanying drawing the specific embodiment of the present utility model is described further:
See Fig. 1, Fig. 2, Fig. 3; it is the utility model floor bar positioner for building example structure schematic diagram; this positioner is formed by cold drawn wire 1 clod wash of diameter 4mm~6mm; " door " shape structure; the top is provided with a recessed pocket 1 that supports upper reinforcement 2, and both sides are provided with supporting leg 6, and supporting leg 6 is provided with the recessed pocket 25 that supports lower rebar 3; two supporting legs, 6 base plane are provided with 3~4 place's projectioies 7, and recessed pocket 25 is a protective layer thickness with supporting leg 6 base plane distance.
With building floor thickness is that 110mm is an example, and the antidetonation grade is a secondary, and seismic fortification intensity is 7 degree, and floor upper reinforcement 2 and lower rebar 3 diameters are the grade III steel of 8mm.Look into the architectural design atlas and know that reinforcement cover is 15mm, for guaranteeing the stability of positioner, positioner width and supporting leg width are chosen by 0.8 of height.
Calculate recessed pocket one 4 bottom level a=110-15-8=87 (mm), supporting leg 6 width b=0.8a=0.8 * 87=70 (mm), recessed pocket 25 bottom level c=15mm, supporting leg width d=0.8a=70 (mm).Can determine the total length of cold drawn wire 1 according to above-mentioned data, after making moulding on the forming machine, brush rustproof paint or spray plastics and get final product at projection 7 places that contacts with template 8 in supporting leg 6 bottoms again.

Claims (2)

1. floor bar positioner; it is characterized in that; form by the reinforcing bar clod wash; " door " shape structure, top are provided with a recessed pocket one that supports upper reinforcement, and both sides are provided with supporting leg; supporting leg is provided with the recessed pocket two that supports lower rebar; two supporting leg base plane are provided with 3~4 place's projectioies, and recessed pocket two is a protective layer thickness with supporting leg base plane distance, is coated with on the described projection and is brushed with antirust coat.
2. floor bar positioner according to claim 1 is characterized in that, described reinforcing bar is the cold drawn wire of diameter 4mm~6mm.
CN2011200842711U 2011-03-25 2011-03-25 Floor slab reinforcing steel bar positioning device Expired - Fee Related CN202007479U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200842711U CN202007479U (en) 2011-03-25 2011-03-25 Floor slab reinforcing steel bar positioning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200842711U CN202007479U (en) 2011-03-25 2011-03-25 Floor slab reinforcing steel bar positioning device

Publications (1)

Publication Number Publication Date
CN202007479U true CN202007479U (en) 2011-10-12

Family

ID=44749134

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200842711U Expired - Fee Related CN202007479U (en) 2011-03-25 2011-03-25 Floor slab reinforcing steel bar positioning device

Country Status (1)

Country Link
CN (1) CN202007479U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060769A (en) * 2013-03-21 2014-09-24 中建四局第三建筑工程有限公司 Triangular support used for supporting upper reinforcing mesh
CN110952723A (en) * 2019-11-20 2020-04-03 中建四局第六建设有限公司 Control device for upper and lower layer steel bar protection layers of floor slab and using method thereof
CN112523433A (en) * 2020-12-19 2021-03-19 中建四局第六建设有限公司 Floor slab hogging moment steel bar protective layer control device and use method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060769A (en) * 2013-03-21 2014-09-24 中建四局第三建筑工程有限公司 Triangular support used for supporting upper reinforcing mesh
CN110952723A (en) * 2019-11-20 2020-04-03 中建四局第六建设有限公司 Control device for upper and lower layer steel bar protection layers of floor slab and using method thereof
CN112523433A (en) * 2020-12-19 2021-03-19 中建四局第六建设有限公司 Floor slab hogging moment steel bar protective layer control device and use method thereof

Similar Documents

Publication Publication Date Title
CN202007479U (en) Floor slab reinforcing steel bar positioning device
CN205296584U (en) Be applied to assembled constructional column of aerated concrete block infilled wall
CN202125074U (en) Double cone floorslab reserved-hole die
US8448404B2 (en) Bond beam rebar positioner
CN101818570A (en) Method for constructing girder structure conversion layer of high-rise building
CN204456671U (en) Cast-in-place concrete structure floor bar thickness of slab Comprehensive Control part
CN203514782U (en) Toilet floor dropping formwork lifting structure
CN204199687U (en) A kind of bath is fallen plate-girder side shaping tool formula between defending and is hung die device
CN107313467B (en) Coiled material fixing clamp and fixing structure at base plate brick moulding bed and construction method of coiled material fixing clamp and fixing structure
CN203514793U (en) Equipment reserved formwork
CN211974342U (en) Floor slab reserved hole device with embedded bar planting holes
CN201972312U (en) Vertical steel bar positioning device in slip-forming construction
CN207513002U (en) A kind of concrete prefabricated wallboard
CN202055535U (en) Steel storage rack in construction site
CN204691249U (en) A kind of with can the stair step steel form of tread
CN202214661U (en) Improved CRTS II track slab
CN202152540U (en) Shear wall template support structure based on guide wall precast blocks
CN104110131A (en) Hollow concrete shuttering of constructional wall column
CN204491947U (en) A kind of laminated floor slab
JP2014173372A (en) Heat medium pipe holder and method of manufacturing reinforced-concrete floor by using the same
CN102359033A (en) Improved China railway track system (CRTS) II track slab and prefabricating process thereof
CN201769272U (en) Apparatus for making prefabricated moulding concrete component and fittings
CN205116511U (en) Non - compoboard structure of die mould steel plate concrete between two girder steels
CN211058151U (en) Reinforced concrete protective layer cushion frame
CN204126256U (en) A kind of kitchen guarding's concrete water-proof leads the tool-typed formwork system of wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111012

Termination date: 20150325

EXPY Termination of patent right or utility model