Prior art keywords
stator
frame
shipping
support frame
exterior protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010206584935U
Other languages
English (en)
Inventor
颜雄
袁春龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Zhuzhou Electric Co Ltd
Original Assignee
CSR Zhuzhou Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSR Zhuzhou Electric Co Ltd filed Critical CSR Zhuzhou Electric Co Ltd
Priority to CN2010206584935U priority Critical patent/CN202006746U/zh
Application granted granted Critical
Publication of CN202006746U publication Critical patent/CN202006746U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Motor Or Generator Frames (AREA)

Abstract

本实用新型公开了一种定子发运工装,包括定子支撑架、外部防护框、连接杆和防护盖四个部分。所述定子支撑架位于定子下方,定子的内圈通过紧固件固定在定子支撑架上,起支撑及固定作用。所述外部防护框,沿定子外延将防护杆依次进行组装构成一个多边形的外部防护框,外部防护框与定子间有间隔。所述连接杆分别与定子支撑架的底端和外部防护框组装连接在一起,一端固定在定子支撑架的底端,另一端连接外部防护框,均通过紧固件紧固连接为组装件。所述防护盖紧固在在外部防护框的上表面,对定子进行整体密封。所述定子发运工装,通过使用焊接或紧固件整体固定在车体上。

Description

一种定子发运工装
技术领域
本实用新型涉及发电机定子发运过程运输固定及防护装置,具体来说是一种发运工装,该工装主要用于运送风力发电机定子。
背景技术
我国正在大力发展绿色能源,风能作为洁净能源,符合当今社会的需求。兆瓦级风力发电机现为我国引进的国际先进技术之一,目前市面上生产兆瓦级风力发电机定子系发电机的配套部件,需将其运输至目的地进行组装。但是目前,对于如此庞大的零件,在运输中如何能保证其安全性具有相当的难度。
目前,一般都是把一个定子放在一个专用工装内,以保证其不会碰损,然后使用一辆运输车辆,将其送到目的地。但是现在的工装普遍采用简易的工装,没有可以拆卸的机构,都是采用焊接的简易框架;在漫长的运输途中,由于该发运工装没有固定,也未封闭,可能导致定子在运输过程中仍可能因移动碰撞以及雨水、灰尘及杂物等污染定子,造成损伤。因此需要进一步改进。
发明内容
本实用新型的目的,就是为了克服上述定子在长途运送中存在的问题,提出一种能满足定子发运工装要求,实现定子发运过程中固定及防护要求,运输过程中不易损坏的定子发运工装。
为了达到上述技术要求,本实用新型采用的工装是:一种定子发运工装,包括定子支撑架、外部防护框、连接杆和防护盖四个部分。
所述定子支撑架位于定子下方,定子的内圈通过紧固件固定在定子支撑架上,起支撑及固定作用。
所述外部防护框,沿定子外延将防护杆依次进行组装构成一个多边形的外部防护框,外部防护框与定子间有间隔。
所述连接杆分别与定子支撑架的底端和外部防护框组装连接在一起,一端固定在定子支撑架的底端,另一端连接外部防护框,均通过紧固件紧固连接为组装件。
所述防护盖紧固在在外部防护框的上表面,对定子进行整体密封。
所述定子发运工装,通过使用焊接或紧固件整体固定在车体上。
使用时,首先将整个定子吊运至定子支撑架上,使用紧固件将定子固定在定子支撑架上;然后组装四周防护结构,安装上连接杆将发运工装整体连接紧固起来;待立杆紧固后将整体吊运至车体上(整体伸出车体距离相同),安装上防护盖,对定子整体进行密封保护;最后使用电焊设备、整体紧固螺栓、槽钢等将发运整体焊接固定在车体上;待其发运至总装厂再将其拆卸下来即可。
本实用新型通过一种组合的满足了定子发运过程中固定及防护要求,能满足定子发运工装要求,实现定子发运过程中固定及防护要求,运输过程中不易损坏的定子发运工装。
附图说明
图1是定子发运工装的俯视图;
图2是定子发运工装的左视图。
图中:1、定子;2、外部防护框;3、连接杆;4、定子支撑架;5、紧固件;6、整体紧固螺栓;7、防护盖。
具体实施方式
下面结合附图和实施例对本实用新型进一步说明。
如附图所示,一种定子发运工装,包括定子支撑架4、外部防护框2、连接杆3和防护盖7四个部分。
所述定子支撑架4位于定子1下方,定子1的内圈通过紧固件5固定在定子支撑架4上,对定子起支撑及固定作用。
所述外部防护框2,沿定子外延将用防护杆依次进行组装构成一个多边形的外部防护框2,外部防护框2与定子1间有间隔。
所述连接杆3分别与定子支撑架4的底端和外部防护框2组装连接在一起,一端固定在定子支撑架4的底端,另一端连接外部防护框2,均通过紧固件紧固连接为组装件。
所述防护盖7紧固在在外部防护框2的上表面,对定子1进行整体密封。
所述定子发运工装,通过使用焊接或整体紧固螺栓6整体固定在车体上。
所述定子支撑架4的顶部有通孔,定子支撑架4的顶部固定在定子1芯轴下面,定子1芯轴上各安装孔与定子支撑架4顶部的通孔位置一致。
使用时,首先将整个定子吊运至定子支撑架上,使用紧固件5将定子固定在定子支撑架上;然后组装四周防护结构,安装上连接杆将发运工装整体连接紧固起来;待立杆紧固后将整体吊运至车体上(整体伸出车体距离相同),安装上防护盖7,对定子整体进行密封保护;最后使用电焊设备、整体紧固螺栓、槽钢等将发运整体焊接固定在车体上;待其发运至总装厂再将其拆卸下来即可。

Claims (3)

1.一种定子发运工装,包括定子支撑架、外部防护框、连接杆和防护盖四个部分,其特征在:所述定子支撑架位于定子下方,定子的内圈通过紧固件固定在对定子支撑架上,对定子起支撑及固定作用;所述外部防护框,沿定子外延将用防护杆依次进行组装构成一个多边形的外部防护框,外部防护框与定子间有间隔;所述连接杆分别与定子支撑架的底端和外部防护框组装连接在一起,一端固定在定子支撑架的底端,另一端连接外部防护框,均通过紧固件紧固连接为组装件;所述防护盖紧固在在外部防护框的上表面,对定子进行整体密封。
2.如权利要求1所述定子发运工装,其特征在于:所述定子发运工装,通过使用焊接或整体紧固螺栓整体固定在车体上。
3.如权利要求1所述定子发运工装,其特征在于:所述定子支撑架的顶部有通孔,定子支撑架的顶部固定在定子芯轴下面,定子芯轴上各安装孔与定子支撑架顶部的通孔位置一致。
CN2010206584935U 2010-12-14 2010-12-14 一种定子发运工装 Expired - Lifetime CN202006746U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206584935U CN202006746U (zh) 2010-12-14 2010-12-14 一种定子发运工装

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206584935U CN202006746U (zh) 2010-12-14 2010-12-14 一种定子发运工装

Publications (1)

Publication Number Publication Date
CN202006746U true CN202006746U (zh) 2011-10-12

Family

ID=44748406

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206584935U Expired - Lifetime CN202006746U (zh) 2010-12-14 2010-12-14 一种定子发运工装

Country Status (1)

Country Link
CN (1) CN202006746U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103066728A (zh) * 2013-01-25 2013-04-24 江苏南车电机有限公司 一种大型永磁直驱风力发电机定子转运用支承座及其使用方法
CN103183184A (zh) * 2013-03-29 2013-07-03 江苏南车电机有限公司 一种大型永磁直驱风力发电机运输台车工装
WO2021128806A1 (zh) * 2019-12-23 2021-07-01 新疆金风科技股份有限公司 运输工装结构、带运输工装结构的分瓣电机模块及运输方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103066728A (zh) * 2013-01-25 2013-04-24 江苏南车电机有限公司 一种大型永磁直驱风力发电机定子转运用支承座及其使用方法
CN103183184A (zh) * 2013-03-29 2013-07-03 江苏南车电机有限公司 一种大型永磁直驱风力发电机运输台车工装
WO2021128806A1 (zh) * 2019-12-23 2021-07-01 新疆金风科技股份有限公司 运输工装结构、带运输工装结构的分瓣电机模块及运输方法
CN113086383A (zh) * 2019-12-23 2021-07-09 新疆金风科技股份有限公司 运输工装结构、带运输工装的分瓣电机模块及运输方法
US11691795B2 (en) 2019-12-23 2023-07-04 Xinjiang Goldwind Science & Technology Co., Ltd. Transportation tooling structure, split electric motor module with transportation tooling structure, and transportation method

Similar Documents

Publication Publication Date Title
AU2009200512B2 (en) Preassembled tower section of a wind power plant
NO333943B1 (no) Fremgangsmåte ved montering av elementer i et vindmølletårn, tårnopphengsenhet, system av innbyrdes festbare deler
US9394715B2 (en) Lattice tower covering for a wind turbine
CN202006746U (zh) 一种定子发运工装
CN205423080U (zh) 风力发电机组的塔筒及风力发电机组
US11585054B2 (en) Hatches of nacelle and helicopter hoisting platform
KR101296785B1 (ko) 수직축 풍력 발전기의 운송기구 및 운송방법
US20150027068A1 (en) Tower base assembly for a wind turbine
CN102926946A (zh) 一种风力发电机组基础环
CN105529170B (zh) 一种特高压换流变压器现场组装方法
CN108063202B (zh) 一种电池箱体
CN103696914A (zh) 一种用于海上运输风力发电机的设备
KR20140028440A (ko) 풍력발전기용 조립식타워
CN206134778U (zh) 一种动力电池箱加强结构
CN203911407U (zh) 拼装式母线桥架
CN102135076B (zh) 风电塔架套装运输装置
CN206569000U (zh) 一种汽车行李架安装结构
JP2016023640A (ja) 小型風力発電機集合コンテナーユニット型風力発電機
CN210047844U (zh) 风电塔筒可拆装马鞍座
CN102733924A (zh) 一种风扇护风罩装置
CN204150501U (zh) 一种可移动加气站集装箱
CN103573005B (zh) 一种复合材料杆塔加固装置及其加固方法
CN207183801U (zh) 一种采用复合绝缘材料制成的新型风帆式配电装置构架
CN201953581U (zh) 风电塔架套装运输装置
CN203998728U (zh) 片式顶升套架

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20111012