CN202001043U - 分体顶梁组合悬移液压支架 - Google Patents
分体顶梁组合悬移液压支架 Download PDFInfo
- Publication number
- CN202001043U CN202001043U CN2011201318812U CN201120131881U CN202001043U CN 202001043 U CN202001043 U CN 202001043U CN 2011201318812 U CN2011201318812 U CN 2011201318812U CN 201120131881 U CN201120131881 U CN 201120131881U CN 202001043 U CN202001043 U CN 202001043U
- Authority
- CN
- China
- Prior art keywords
- joist
- back timber
- cylinder pressure
- timber
- supporting beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Assembled Shelves (AREA)
Abstract
分体顶梁组合悬移液压支架,它涉及一种液压支架。它的后托梁(1)通过托梁连接杆(2)与前托梁(3)相连,且后托梁(1)与前托梁(3)平行设置,右顶梁(7)和左顶梁(8)垂直设置在后托梁(1)与前托梁(3)上方,且右顶梁(7)和左顶梁(8)为平行设置,右顶梁(7)与右推进液压缸(10)相连,左顶梁(8)与左推进液压缸(9)相连,且左推进液压缸(9)和右推进液压缸(10)设置在右顶梁(7)和左顶梁(8)之间,且左推进液压缸(9)和右推进液压缸(10)均与后托梁(1)和前托梁(3)垂直,左推进液压缸(9)后端与后托梁(1)相铰接。它的体积小、重量轻、运输安装方便、动作灵活,且做到不倒架。
Description
技术领域:
本实用新型涉及用于煤矿采煤工作面的支护设备,尤其涉及一种分体顶梁组合悬移液压支架。
背景技术:
目前用于采煤工作面的组合支架虽然在组合使用时整体性好,稳定性高,但是它的顶梁体积大、重量重、且强度不高,运输安装不便,造价高。
实用新型内容:
本实用新型的目的是提供一种分体顶梁组合悬移液压支架,它的体积小、重量轻、运输安装方便、动作灵活,且做到不倒架。
为了解决背景技术所存在的问题,本实用新型是采用以下技术方案:它包含后托梁1、托梁连接杆2、前托梁3、导向轮4、导轨5、液压支柱6、右顶梁7、左顶梁8、左推进液压缸9、右推进液压缸10和连接套11,后托梁1通过托梁连接杆2与前托梁3相连,且后托梁1与前托梁3平行设置,右顶梁7和左顶梁8垂直设置在后托梁1与前托梁3上方,且右顶梁7和左顶梁8为平行设置,右顶梁7与右推进液压缸10相连,左顶梁8与左推进液压缸9相连,且左推进液压缸9和右推进液压缸10设置在右顶梁7和左顶梁8之间,且左推进液压缸9和右推进液压缸10均与后托梁1和前托梁3垂直,左推进液压缸9后端与后托梁1相铰接,右推进液压缸10后端与后托梁1相铰接,后托梁1和前托梁3端部通过连接套11与相邻支架的托梁相连,右顶梁7和左顶梁8底部两端均设置有液压支柱6,右顶梁7和左顶梁8底部内侧均设置有导轨5,导轨5内嵌有导向轮4。
所述的右顶梁7和左顶梁8均为封闭式箱体结构。
本实用新型左推进液压缸9和右推进液压缸10同时收缩,拉动后托梁1、前托梁3沿着顶梁下方的轨道向前滑移,提起左顶梁8下面的液压支柱6,使左顶梁8与岩石顶板脱离接触,给液压缸9注液,使其伸长,于是左顶梁8在托梁的上平面上向前移,左顶梁8移完后,落下其下面的液压支柱6,使液压支柱6支撑好顶板,提起右顶梁7下面的液压支柱6,使右顶梁7与岩石顶板脱离接触,给右推进液压缸10注液,使其伸长,于是右顶梁7就在托梁的上平面向前滑动,右顶梁7前移完后,落下其下面的液压支柱6,使右顶梁7支撑好顶板。
本实用新型的体积小、重量轻、运输安装方便、动作灵活,且做到不倒架。
附图说明:
图1为本实用新型的结构示意图;
图2为图1的A-A向示意图;
图3为本实用新型的组装结构示意图。
具体实施方式:
参照图1-3,本具体实施方式采用以下技术方案:它包含后托梁1、托梁连接杆2、前托梁3、导向轮4、导轨5、液压支柱6、右顶梁7、左顶梁8、左推进液压缸9、右推进液压缸10和连接套11,后托梁1通过托梁连接杆2与前托梁3相连,且后托梁1与前托梁3平行设置,右顶梁7和左顶梁8设置垂直设置在后托梁1与前托梁3上方,且右顶梁7和左顶梁8为平行设置,右顶梁7与右推进液压缸10相连,左顶梁8与左推进液压缸9相连,且左推进液压缸9和右推进液压缸10设置在右顶梁7和左顶梁8之间,且左推进液压缸9和右推进液压缸10均与后托梁1和前托梁3垂直,左推进液压缸9后端与 后托梁1相铰接,右推进液压缸10后端与后托梁1相铰接,后托梁1和前托梁3端部通过连接套11与相邻支架的托梁相连,右顶梁7和左顶梁8底部两端均设置有液压支柱6,右顶梁7和左顶梁8底部内侧均设置有导轨5,导轨5内嵌有导向轮4。
所述的右顶梁7和左顶梁8均为封闭式箱体结构。
本具体实施方式左推进液压缸9和右推进液压缸10同时收缩,拉动后托梁1、前托梁3沿着顶梁下方的轨道向前滑移,提起左顶梁8下面的液压支柱6,使左顶梁8与岩石顶板脱离接触,给液压缸9注液,使其伸长,于是左顶梁8在托梁的上平面上向前移,左顶梁8移完后,落下其下面的液压支柱6,使液压支柱6支撑好顶板,提起右顶梁7下面的液压支柱6,使右顶梁7与岩石顶板脱离接触,给右推进液压缸10注液,使其伸长,于是右顶梁7就在托梁的上平面向前滑动,右顶梁7前移完后,落下其下面的液压支柱6,使右顶梁7支撑好顶板。
本具体实施方式在工作面设有若干组支架,每组支架设有两个顶梁。在图4中有六组支架通过托梁连接套连接为一个整体,图中自下而上分别为第1至6组支架,其中第1、2组支架未前移,第4、5、6组支架已前移,第3组支架的左顶梁8已前移,右顶梁7正在按箭头所示方向前移。
本具体实施方式的体积小、重量轻、运输安装方便、动作灵活,且做到不倒架。
Claims (2)
1.分体顶梁组合悬移液压支架,其特征在于它包含后托梁(1)、托梁连接杆(2)、前托梁(3)、导向轮(4)、导轨(5)、液压支柱(6)、右顶梁(7)、左顶梁(8)、左推进液压缸(9)、右推进液压缸(10)和连接套(11),后托梁(1)通过托梁连接杆(2)与前托梁(3)相连,且后托梁(1)与前托梁(3)平行设置,右顶梁(7)和左顶梁(8)垂直设置在后托梁(1)与前托梁(3)上方,且右顶梁(7)和左顶梁(8)为平行设置,右顶梁(7)与右推进液压缸(10)相连,左顶梁(8)与左推进液压缸(9)相连,且左推进液压缸(9)和右推进液压缸(10)设置在右顶梁(7)和左顶梁(8)之间,且左推进液压缸(9)和右推进液压缸(10)均与后托梁(1)和前托梁(3)垂直,左推进液压缸(9)后端与后托梁(1)相铰接,右推进液压缸(10)后端与后托梁(1)相铰接,后托梁(1)和前托梁(3)端部通过连接套(11)与相邻支架的托梁相连,右顶梁(7)和左顶梁(8)底部两端均设置有液压支柱(6),右顶梁(7)和左顶梁(8)底部内侧均设置有导轨(5),导轨(5)内嵌有导向轮(4)。
2.根据权利要求1所述的分体顶梁组合悬移液压支架,其特征在于所述的右顶梁(7)和左顶梁(8)均为封闭式箱体结构。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201318812U CN202001043U (zh) | 2011-04-29 | 2011-04-29 | 分体顶梁组合悬移液压支架 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201318812U CN202001043U (zh) | 2011-04-29 | 2011-04-29 | 分体顶梁组合悬移液压支架 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202001043U true CN202001043U (zh) | 2011-10-05 |
Family
ID=44703788
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011201318812U Expired - Fee Related CN202001043U (zh) | 2011-04-29 | 2011-04-29 | 分体顶梁组合悬移液压支架 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202001043U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102654060A (zh) * | 2012-05-23 | 2012-09-05 | 辽宁天安矿山科技有限公司 | 巷道掘进交错式支护装置 |
CN103470280A (zh) * | 2013-09-24 | 2013-12-25 | 北京诚田恒业煤矿设备有限公司 | 一种煤矿用可拆装式顶梁液压支架 |
-
2011
- 2011-04-29 CN CN2011201318812U patent/CN202001043U/zh not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102654060A (zh) * | 2012-05-23 | 2012-09-05 | 辽宁天安矿山科技有限公司 | 巷道掘进交错式支护装置 |
CN103470280A (zh) * | 2013-09-24 | 2013-12-25 | 北京诚田恒业煤矿设备有限公司 | 一种煤矿用可拆装式顶梁液压支架 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102444416B (zh) | 综采工作面液压支架梁式回撤装置 | |
CN104444840B (zh) | 矿用液压起吊装置 | |
CN202391444U (zh) | 综采工作面液压支架梁式回撤装置 | |
CN104100288A (zh) | 一种跑车式综采液压支架组装架 | |
CN202001043U (zh) | 分体顶梁组合悬移液压支架 | |
CN203006856U (zh) | 一种管抓举装置 | |
CN201121525Y (zh) | 单底多梁液压支架 | |
CN202284477U (zh) | 分体顶梁组合悬移液压支架 | |
CN201460945U (zh) | 牵引式滑移液压支架系统 | |
CN202690098U (zh) | 一种六柱支撑式分体组合端头液压支架 | |
CN102003198A (zh) | 无尾梁液压支架 | |
CN201225163Y (zh) | 煤矿短壁开采用自移液压支架 | |
CN101333932B (zh) | 双层超静定液压支架 | |
CN202970789U (zh) | 伸缩式低压电缆储存装置 | |
CN201891424U (zh) | 一种具有调架千斤顶的液压支架 | |
CN202467883U (zh) | 双稳定反四连杆机构轻型液压支架 | |
CN202215273U (zh) | 前置单摆杆式端头液压支架 | |
CN103410547A (zh) | 煤矿用薄煤层液压支架 | |
CN203020329U (zh) | 综采工作面设备列车自移系统 | |
CN102865090B (zh) | 带侧移装置的履带行走超前支护支架 | |
CN102587946A (zh) | 整体移动超前支护支架 | |
CN201386566Y (zh) | 平移顶梁液压支架 | |
CN203499713U (zh) | 一种煤矿用可拆装式顶梁液压支架 | |
CN203796300U (zh) | 模块式液压支架 | |
CN203948119U (zh) | 一种跑车式综采液压支架组装架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
DD01 | Delivery of document by public notice |
Addressee: Beijing Yutian Century Mining Equipment Co., Ltd. Zhang Yang Document name: Notification to Pay the Fees |
|
DD01 | Delivery of document by public notice |
Addressee: Beijing Yutian Century Mining Equipment Co., Ltd. Document name: Notification to Pay the Fees |
|
DD01 | Delivery of document by public notice |
Addressee: Beijing Yutian Century Mining Equipment Co., Ltd. Document name: Notification of Termination of Patent Right |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111005 Termination date: 20150429 |
|
EXPY | Termination of patent right or utility model |