CN202000370U - Bolt embedding structure for strong-vibration large-sized electromechanical equipment - Google Patents

Bolt embedding structure for strong-vibration large-sized electromechanical equipment Download PDF

Info

Publication number
CN202000370U
CN202000370U CN 201120114328 CN201120114328U CN202000370U CN 202000370 U CN202000370 U CN 202000370U CN 201120114328 CN201120114328 CN 201120114328 CN 201120114328 U CN201120114328 U CN 201120114328U CN 202000370 U CN202000370 U CN 202000370U
Authority
CN
China
Prior art keywords
bolt
pipe
cavity body
cavity
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201120114328
Other languages
Chinese (zh)
Inventor
慕洪友
陈本龙
湛正刚
宋静
杨曼
吴小波
王正清
王金生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
Hydrochina Guiyang Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina Guiyang Engineering Corp filed Critical Hydrochina Guiyang Engineering Corp
Priority to CN 201120114328 priority Critical patent/CN202000370U/en
Application granted granted Critical
Publication of CN202000370U publication Critical patent/CN202000370U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

The utility model discloses a bolt embedding structure for strong-vibration large-sized electromechanical equipment, which comprises a cavity in an equipment foundation (1). A grouting pipe (2) is arranged on the lower portion of the cavity, a return pipe (3) is disposed on the upper portion of the cavity, and a bolt is arranged in the cavity. The movable bolt is arranged in the cavity, the cavity is embedded in the equipment foundation at first, the equipment is connected with the bolt via a nut, cement mortar is filled into the cavity via pressure grouting, and then the bolt is fixed via the cement mortar. The bolt embedding structure is simple in structure and easy in construction, saves investment, not only can accurately position embedded bolts, but also fixes the embedded bolts by means of cement mortar grouting after installation of the embedded bolts.

Description

The structure of strong vibration giant mechanical and electrical equipment pre-embedded bolt
Technical field
The utility model relates to a kind of structure of strong vibration giant mechanical and electrical equipment pre-embedded bolt, belongs to the pre-buried technical field of giant mechanical and electrical equipment pre-embedded bolt.
Background technology
In the equipment installation processes such as powerhouse of hydropower station generator unit stator, lower bearing bracket, need when Equipment Foundations concreting, equipment could be fixed on the Equipment Foundations concrete structure by accurate pre-embedded bolt, and pre-embedded bolt can cause bolt looseness because of the judder of hydrogenerator operation in running, thereby cause electromechanical equipment fault or accident.It is to reserve the hole of carrying out the second stage concrete cast in the Equipment Foundations concrete structure that traditional bolt is buried underground, the Equipment Foundations concrete structure is subjected to reserving the weakening in the hole of second stage concrete cast, just need increasing machine pier concrete structure thickness, cause the increasing of factory building size and rolling up of construction investment, and adopt the mode of reserving second stage concrete to bury bolt underground, construction is complicated, operation is many, is unfavorable for accelerating construction progress.
Summary of the invention
The purpose of this utility model is: provide a kind of simple in structure, be easy to construct, reduced investment, and can accurately carry out pre-embedded bolt location, again can be after the pre-embedded bolt installation with the fixing structure of the strong vibration giant mechanical and electrical equipment pre-embedded bolt of pre-embedded bolt of cement mortar perfusion, to overcome the deficiencies in the prior art.
The technical solution of the utility model is to constitute like this: the structure of a kind of strong vibration giant mechanical and electrical equipment pre-embedded bolt of the present utility model, comprise the cavity body that is located in the Equipment Foundations, and the cavity body bottom is provided with grout pipe, and cavity body top is provided with return pipe; Be provided with bolt in the cavity body.
In the aforementioned structure, described cavity body comprises steel box and steel pipe, steel pipe and the welding of steel box; Be provided with billet in the steel box, billet is provided with bolt hole, is provided with one group of through hole along the bolt hole periphery.
In the aforementioned structure, between described steel box and the billet, and the gap of leaving 10~20cm between steel pipe and the bolt; Be provided with cement mortar in the gap.
In the aforementioned structure, the diameter of described grout pipe and through hole is greater than 38mm.
Compared with prior art, the utility model is embedded in cavity body in the Equipment Foundations earlier by movable bolt is set in cavity body, by nut the bolt of equipment with activity is connected, in cavity body, inject cement mortar by pressure grouting again, by cement mortar with bolt.The utility model is simple in structure, be easy to construct, reduce investment outlay, can accurately carry out the pre-embedded bolt location again can be after the pre-embedded bolt installation with the fixing pre-embedded bolt of cement mortar perfusion.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Being labeled as in the accompanying drawing: 1-Equipment Foundations, 2-grout pipe, 3-return pipe, 4-bolt, 5-steel box, 6-steel pipe, 7-billet, 8-bolt hole, 9-through hole, 10-cement mortar, 11-nut, the fixed head of 12-equipment.
The specific embodiment
Embodiment of the present utility model: the structure of a kind of strong vibration giant mechanical and electrical equipment pre-embedded bolt of the present utility model makes up as follows, and as shown in Figure 1, this method is to precoat to be provided with the cavity body of movable bolt in Equipment Foundations; Earlier movable bolt is connected with the fixed base plate of equipment during erection equipment, the cast of movable bolt is finished in the grout pipe of the bottom by the being located at cavity body grouting of pressurizeing in cavity body then.The described pressurization in cavity body when being in the milk, the air in the cavity body is discharged by being located at cavity body top return pipe, when return pipe is discharged cement mortar continuously, finishes the cast of movable bolt.In the method to set up of aforementioned strong vibration giant mechanical and electrical equipment pre-embedded bolt, the cement strength grade of described cement mortar is greater than 32.5, and water/binder ratio is 0.5~0.6, the sand amount of mixing of cement mortar be not more than cement heavy 200%, the little 2.5mm of the particle diameter of sand, fineness modulus is not more than 2.0.Described cavity body comprises steel box and steel pipe; Be provided with billet in the steel box, billet is provided with bolt hole and through hole, is installed with bolt in the bolt hole; Steel pipe socket is on bolt; Steel pipe one end and the welding of steel box.Described bolt or billet can have the displacement of 10~20cm respectively in the cavity of steel pipe socket or steel box.The diameter of described grout pipe and through hole is greater than 38mm.
The structure of the strong vibration giant mechanical and electrical equipment pre-embedded bolt of the present utility model of Gou Jianing according to the method described above, as shown in Figure 1, this structure comprises the cavity body that is located in the Equipment Foundations 1, and the cavity body bottom is provided with grout pipe 2, and cavity body top is provided with return pipe 3; Be provided with bolt 4 in the cavity body.Described cavity body comprises steel box 5 and steel pipe 6, steel pipe 6 and 5 welding of steel box; Be provided with billet 7 in the steel box 5, billet 7 is provided with bolt hole 8, is provided with one group of through hole 9 along bolt hole 8 peripheries.Between described steel box 5 and the billet 7, and the gap of leaving 10~20cm between steel pipe 6 and the bolt 4; Be provided with cement mortar 10 in the gap.The diameter of described grout pipe 2 and through hole 9 is greater than 38mm.
Implementation process of the present utility model is as follows:
As shown in Figure 1, the first step is made cavity body, and cavity body comprises steel box 5 and steel pipe 6.Steel box 5 steel plate welding forming, steel box 5 are made rectangle or other non-circular box body, and be rotatable after being cast in the Equipment Foundations 1 to prevent steel box 5.A dress billet 7 in steel box 5, billet 7 is also made rectangle or non-circular, rotates in the cement mortar 10 of solidifying to prevent billet 7.Billet 7 is provided with bolt hole 8, is provided with one group of through hole 9 around the bolt hole 8, so that cement mortar 10 can enter in the steel pipe 6 by through hole 9.Be installed with bolt 4 in the bolt hole 8 of billet 7, the bolt head of bolt 4 is that hexagon or other are non-circular, to prevent when screwing nut 11 and then rotation of bolt 4.Binding of weldable steel box 5 tops bound and left the hole then, and steel pipe 6 is welded in the hole at steel box 5 tops.Billet 7 can have the displacement of 10~20cm in steel box 5.Bolt 4 can have the displacement of 10~20cm in steel pipe 6.At steel box 5 bottoms welding grout pipe 2, at the welded top return pipe 3 of steel pipe 6, the mouth of pipe of grout pipe 2 and return pipe 3 is higher than the mouth of pipe of steel pipe 6.The diameter of grout pipe 2 and through hole 9 is convenient to cement mortar 10 and is passed through smoothly greater than 38mm.
Second step was embedded in the above-mentioned ready-made cavity body that has movable bolt in the Equipment Foundations 1, made the port of steel pipe 6 concordant with the last plane of Equipment Foundations 1 when pre-buried.The mouth of pipe of grout pipe 2 and return pipe 3 should be higher than the last plane of Equipment Foundations 1.Casting equipment basis 1 o'clock, the mouth of pipe of reply grout pipe 2, return pipe 3 and steel pipe 6 is carried out safeguard measure, prevents that concrete from entering grout pipe 2, return pipe 3 and steel pipe 6.After finishing, Equipment Foundations 1 cast just guarantees that bolt 4 can have the displacement of 10~20cm in steel pipe 6.
The 3rd step, after the concrete for the treatment of Equipment Foundations 1 reaches and solidifies fully the length of time, carry out the location and installation of equipment, because bolt 4 can be movable in steel pipe 6, therefore can adjust the accurate location between bolt position and the equipment fixing hole, be connected with bolt 4 by the fixed head 12 of nut 11, accurately locate with assurance equipment with equipment.
In the 4th step, after the equipment for the treatment of is accurately located, take the mode of pressure injection in steel box 5, to inject cement mortar 10 by grout pipe 2.The cement strength grade of cement mortar 10 is greater than 32.5, and water/binder ratio is 0.5~0.6, the sand amount of mixing of cement mortar be not more than cement heavy 200%, the little 2.5mm of the particle diameter of sand, fineness modulus is not more than 2.0.Cement mortar 10 is injected steel pipe 6 by the through hole on the billet 79, and the air in the steel pipe 6 is discharged by return pipe 3, goes out cement mortar 10 up to return pipe 3 continuous stream, can stop the cement injection mortar.Grouting finishes just can carry out after 28 days the debugging or the operation of hydrogenerator.

Claims (4)

1. the structure of a strong vibration giant mechanical and electrical equipment pre-embedded bolt is characterized in that: comprise the cavity body that is located in the Equipment Foundations (1), the cavity body bottom is provided with grout pipe (2), and cavity body top is provided with return pipe (3); Be provided with bolt (4) in the cavity body.
2. the structure of strong vibration giant mechanical and electrical equipment pre-embedded bolt according to claim 1 is characterized in that: described cavity body comprises steel box (5) and steel pipe (6), steel pipe (6) and steel box (5) welding; Be provided with billet (7) in the steel box (5), billet (7) is provided with bolt hole (8), is provided with one group of through hole (9) along bolt hole (8) periphery.
3. the structure of strong vibration giant mechanical and electrical equipment pre-embedded bolt according to claim 2 is characterized in that: between described steel box (5) and the billet (7), and the gap of leaving 10~20cm between steel pipe (6) and the bolt (4); Be provided with cement mortar (10) in the gap.
4. the structure of strong vibration giant mechanical and electrical equipment pre-embedded bolt according to claim 2 is characterized in that: the diameter of described grout pipe (2) and through hole (9) is greater than 38mm.
CN 201120114328 2011-04-19 2011-04-19 Bolt embedding structure for strong-vibration large-sized electromechanical equipment Expired - Lifetime CN202000370U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120114328 CN202000370U (en) 2011-04-19 2011-04-19 Bolt embedding structure for strong-vibration large-sized electromechanical equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120114328 CN202000370U (en) 2011-04-19 2011-04-19 Bolt embedding structure for strong-vibration large-sized electromechanical equipment

Publications (1)

Publication Number Publication Date
CN202000370U true CN202000370U (en) 2011-10-05

Family

ID=44703115

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120114328 Expired - Lifetime CN202000370U (en) 2011-04-19 2011-04-19 Bolt embedding structure for strong-vibration large-sized electromechanical equipment

Country Status (1)

Country Link
CN (1) CN202000370U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102747744A (en) * 2011-04-19 2012-10-24 中国水电顾问集团贵阳勘测设计研究院 Setting method and structure of embedded bolt of strongly-vibrating large electromechanical equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102747744A (en) * 2011-04-19 2012-10-24 中国水电顾问集团贵阳勘测设计研究院 Setting method and structure of embedded bolt of strongly-vibrating large electromechanical equipment
CN102747744B (en) * 2011-04-19 2014-12-24 中国电建集团贵阳勘测设计研究院有限公司 Setting method and structure of embedded bolt of strongly-vibrating large electromechanical equipment

Similar Documents

Publication Publication Date Title
CN203113627U (en) Nodular cast iron grout sleeve for connecting longitudinal steel bars
CN205917838U (en) Balcony board installation node
CN102691365B (en) Connecting structure for assembly type concrete shear wall edge member
CN203462583U (en) Super high-rise exposed column foot
CN202672766U (en) Concrete pole repair strengthening hoop
CN201826437U (en) Structure for accurately embedding column pin bolts for steel structures
CN203222809U (en) Pre-stressed concrete pipe pile foundation for pole and tower of power transmission line
CN207003634U (en) A kind of balcony slab installs node
CN201826325U (en) Foundation structure of tower crane
CN102021908A (en) Mechanical connection structure and construction method for splicing precast square piles
CN102747744B (en) Setting method and structure of embedded bolt of strongly-vibrating large electromechanical equipment
CN103711082B (en) The cross-saddle single-track traffic construction method of overhead section
CN203270599U (en) Foundation bolt pre-buried die
CN204097864U (en) A kind of bridge prefabrication hollow pier stud delay-pour joint structure
CN103061249A (en) Quick positioning construction device and construction method for steel-pipe column of bridge
CN106592777B (en) Assembled steel-is mixed to combine beam-column node structure and its implementation method
CN202000370U (en) Bolt embedding structure for strong-vibration large-sized electromechanical equipment
CN203807931U (en) Connecting structure for prefabricated pier and foundation
CN209703418U (en) Assembled flood-control wall
CN111305093A (en) Self-unloading steel corrugated plate arch culvert
CN201250411Y (en) Universal base of a tangent tower of an electric transmission line
CN203866853U (en) Grouting connection structure used for pile and sleeve for offshore wind power
CN201915420U (en) Foundation of temporary gate building
CN201713940U (en) Steel column base structure
CN201381517Y (en) Elastic concrete plinth for supporting large-scale steam turbine generator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: HYDROCHINA GUIYANG ENGINEERING CORPORATION, LTD.

Free format text: FORMER NAME: GUIYANG PROSPECTION + DESIGN INST, CHINA HYDRAULIC POWER CONSULTARY GROUP

Owner name: CHINA POWER GROUP GUIYANG INVESTIGATION DESIGN + R

Free format text: FORMER NAME: HYDROCHINA GUIYANG ENGINEERING CORPORATION, LTD.

CP01 Change in the name or title of a patent holder

Address after: 550002 No. 85, Jiefang Road, Guizhou, Guiyang

Patentee after: CHINA POWER CONSRTUCTION GROUP GUIYANG SURVEY AND DESIGN INSTITUTE Co.,Ltd.

Address before: 550002 No. 85, Jiefang Road, Guizhou, Guiyang

Patentee before: POWERCHINA GUIYANG ENGINEERING Corp.,Ltd.

Address after: 550002 No. 85, Jiefang Road, Guizhou, Guiyang

Patentee after: POWERCHINA GUIYANG ENGINEERING Corp.,Ltd.

Address before: 550002 No. 85, Jiefang Road, Guizhou, Guiyang

Patentee before: HydroChina Guiyang Engineering Corp.

AV01 Patent right actively abandoned

Granted publication date: 20111005

Effective date of abandoning: 20141224

AV01 Patent right actively abandoned

Granted publication date: 20111005

Effective date of abandoning: 20141224

RGAV Abandon patent right to avoid regrant