CN202000340U CN2011200404825U CN201120040482U CN202000340U CN 202000340 U CN202000340 U CN 202000340U CN 2011200404825 U CN2011200404825 U CN 2011200404825U CN 201120040482 U CN201120040482 U CN 201120040482U CN 202000340 U CN202000340 U CN 202000340U
Authority
CN
China
Prior art keywords
pile
prefabricated concrete
concrete solid
pile body
friction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200404825U
Other languages
Chinese (zh)
Inventor
孔奥博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI AOMI PHARMACEUTICAL EQUIPMENT CO Ltd
Original Assignee
SHANGHAI AOMI PHARMACEUTICAL EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI AOMI PHARMACEUTICAL EQUIPMENT CO Ltd filed Critical SHANGHAI AOMI PHARMACEUTICAL EQUIPMENT CO Ltd
Priority to CN2011200404825U priority Critical patent/CN202000340U/en
Application granted granted Critical
Publication of CN202000340U publication Critical patent/CN202000340U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a prefabricated concrete solid pile, which at least comprises a pile body. The pile body is a solid polyhedron. The external surfaces of the pile body are friction increasing surfaces. The friction increasing surfaces are raised lines, threads, raised parts or corrugated parts on the external surfaces of the pile body. By adopting the structural design, the external surfaces of since the prefabricated concrete solid pile are structurally improved to be friction increasing surfaces, the friction coefficients of side surfaces are improved, the pile-side friction of the prefabricated concrete solid pile is increased, and the prefabricated concrete solid pile is particularly suitable for construction environments with stratum structures which cannot satisfy pile foundation depth design requirements. In the construction environments with the stratum structures which cannot satisfy the pile foundation depth design requirements, since the prefabricated concrete solid pile is adopted, a pile foundation is ensured to effectively enter a bearing stratum, at the same time, even though the depth of the pile foundation is not enough, the pile-side friction required by the design can be obtained and the design requirements on the pile foundation can be satisfied.

Description

A kind of prefabricated concrete solid pile
Technical field
The utility model relates to the pile foundation technology field, relates in particular to a kind of prefabricated concrete solid pile that is used as the building foundation.
Background technology
For the construction of a building high building, its structural safety depends on basic engineering to a great extent, and basic engineering then is according to the geological mapping parameter, carries out according to design specifications.Build various buildings particularly high-rise building, heavy factory building and when having the structure of specific (special) requirements in the bad area of soil property, pile foundation technology has become a kind of base form of extensive employing.Pile foundation technology mainly is plant equipment such as employing static pile press, and many prefabricated concrete pile tubes or prefabricated concrete solid pile are squeezed into the technology that is used as the building foundation in the stratum according to layout.
Wherein, the bearing capacity of a kind of prefabricated concrete solid pile 1 of the prior art as shown in Figure 1 mainly is made up of two parts.A part is the frictional force that forms between a side soil layer, is also referred to as a side-friction force.Another part is the bearing capacity of pile tip that the pile crown seat crouches and forms on the bearing stratum in the stratum.The size of stake side-friction force is main relevant with the moisture content of soil property, and when underground SEA LEVEL VARIATION is big, thereby the side friction factor has the size that bigger change directly has influence on a side-friction force.And the size of bearing capacity of pile tip is main and pile crown whether to enter bearing stratum as requested relevant, when pile crown enters the good bearing stratum of geological conditions, bearing capacity of pile tip is basicly stable, on pile crown is arranged in bearing stratum or under the unfavorable geology layer time, bearing capacity of pile tip is extremely unstable.Therefore, in the basic engineering of building, generally all do one's utmost to avoid unsettled unfavorable geology layer.More satisfactory basic engineering is to make pile tube that certain degree of depth be arranged in ground, to obtain the stake side-friction force of designing requirement, also must make pile crown enter bearing stratum, to obtain the bearing capacity of pile tip of designing requirement.
But in practice of construction, the addressing of building is at first considered is ground factor but not underground factor.Therefore, building is selected on the basis of some earth formation complexity possibly.For example, the construction quality accident that residential building integral body that a building 13 story frame structures are near completion is collapsed has taken place at Luo Yang crossing, Minhang District lotus flower South Road, Shanghai City in June, 2009.This accident main cause is that the underground foundation of these both sides, north and south, building is asymmetric, cause the pile crown of a part of pile tube of same absolute altitude effectively to enter bearing stratum, and the pile crown of another part pile tube fails effectively to enter bearing stratum, entered the weak soil layer that is positioned at the bearing stratum below but penetrate bearing stratum, the bearing capacity of pile tip of both sides, north and south pile tube is seriously asymmetric.Simultaneously, this area is near the river course, and groundwater table is very unstable, just rains heavily before the accident happened, cause both sides, north and south pile tube the stake side-friction force, bearing capacity of pile tip is all seriously unbalance, makes great misfortune eventually.
This time accident has disclosed the long-term unsolved technical barrier of building lot technical field.In the prior art, for reaching the stake side-friction force of design, generally the projected depth to pile tube has certain requirement, and promptly pile tube must be squeezed into certain depth under the face of land so that produce enough side-friction forces between pile tube side and the soil layer.Simultaneously, for obtaining the bearing capacity of pile tip of designing requirement, pile tube also must be beaten on the bearing stratum of good geological conditions.But problem is that the earth formation under the face of land is very complicated, under a lot of situations, is positioned at the geological stratification at projected depth place under the face of land and is not suitable for doing bearing stratum.
In this case, existing pile foundation technology must adopt the supplementary technology means, the unfavorable geology layer under the face of land is done a technical finesse satisfy the requirement that becomes bearing stratum, otherwise just can't satisfy the requirement of stake side-friction force and bearing capacity of pile tip simultaneously.
Therefore, those skilled in the art is devoted to improve existing pile foundation technology always, to overcome the above-mentioned defective of prior art.
The utility model content
Because the above-mentioned defective of prior art, technical problem to be solved in the utility model provides a kind of the prefabricated concrete solid pile that side-friction force is big.
For achieving the above object, the utility model provides a kind of prefabricated concrete solid pile, comprises pile body at least, and described pile body is a solid polyhedron; The external surface of described pile body is for increasing rubbing surface.
Preferably, described increase rubbing surface is the burr on the described pile body external surface.
Preferably, described increase rubbing surface is the screw thread on the described pile body external surface.
Preferably, described increase rubbing surface is a plurality of protuberances on the described pile body external surface.
Preferably, described increase rubbing surface is a plurality of corrugated parts on the described pile body external surface.
Preferably, described pile body is a tetragonal body.
Preferably, described pile body is the tetragonal body that an end is big, an end is little.
Preferably, described tetragonal body also has the guide portion of a taper.
Preferably, described pile body is prefabricated concrete spare.
Prefabricated concrete solid pile of the present utility model is because the said structure design, the architecture advances of its external surface is for increasing rubbing surface, improved the friction factor of side, increased the stake side-friction force of prefabricated concrete solid pile, be particularly useful for earth formation and can not satisfy the construction environment that the pile foundation depth design requires.Can not satisfy in the construction environment of pile foundation depth design requirement at this class earth formation, owing to adopted prefabricated concrete solid pile of the present utility model, when guaranteeing that pile foundation effectively enters bearing stratum, even the pile foundation degree of depth is not enough, also can obtain the stake end support force and the stake side-friction force of designing requirement, satisfy the designing requirement of pile foundation.
Be described further below with reference to the technique effect of accompanying drawing, to understand the purpose of this utility model, feature and effect fully design of the present utility model, concrete structure and generation.
Description of drawings
Fig. 1 is the structural representation of a kind of prefabricated concrete solid pile in the prior art;
Fig. 2 is the structural representation of the embodiment 1 of prefabricated concrete solid pile of the present utility model;
Fig. 3 is the structural representation of the embodiment 2 of prefabricated concrete solid pile of the present utility model;
Fig. 4 is the structural representation of the embodiment 3 of prefabricated concrete solid pile of the present utility model.
The specific embodiment
Embodiment 1:
As shown in Figure 2, among the embodiment of prefabricated concrete solid pile of the present utility model, comprise pile body 1, pile body 1 is a solid polyhedral prefabricated concrete spare, is tetragonal body in the present embodiment.
The external surface 11 of pile body 1 is for increasing rubbing surface.Particularly, in the present embodiment, a plurality of burrs 12 on the external surface 11 that above-mentioned increase rubbing surface is a pile body.
Owing to be provided with a plurality of burrs 12, increased the friction factor of the external surface 11 of pile body 1, the side stressing conditions of prefabricated concrete solid pile of the present invention improves.Compare with existing prefabricated concrete solid pile, squeeze in pile foundation under the situation of same geological conditions, the same degree of depth, the stake side-friction force of prefabricated concrete solid pile of the present utility model is strengthened greatly.
In other embodiments, pile body 1 also can be for having certain taper, a big smaller tetragonal body.
In other embodiments, above-mentioned increase rubbing surface also can be the screw thread on the external surface 11 of pile body.
Prefabricated concrete solid pile of the present utility model is because the said structure design, the architecture advances of its external surface is for increasing rubbing surface, improved the friction factor of side, increased the stake side-friction force of prefabricated concrete solid pile, be particularly useful for earth formation and can not satisfy the construction environment that the pile foundation depth design requires.Can not satisfy in the construction environment of pile foundation depth design requirement at this class earth formation, owing to adopted prefabricated concrete solid pile of the present utility model, when guaranteeing that pile foundation effectively enters bearing stratum, even the pile foundation degree of depth is not enough, also can obtain the stake end support force and the stake side-friction force of designing requirement, satisfy the designing requirement of pile foundation.
Embodiment 2:
As shown in Figure 3, the prefabricated concrete solid pile of present embodiment 1 is basic identical with the structure of the foregoing description, all comprises a pile body 1, and institute's difference is, in the present embodiment, and a plurality of protuberances 12 on the external surface 11 that above-mentioned increase rubbing surface is a pile body 1.
These a plurality of protuberances 12 can be for carving the piece type.Present embodiment has and the essentially identical technique effect of the foregoing description.
Embodiment 3:
As shown in Figure 4, the structure of present embodiment and embodiment 1 is basic identical, and institute's difference is, the increase rubbing surface on the pile body 1 is a plurality of corrugated parts 12 on the external surface 11 of pile body 1.
Present embodiment can be realized technique effect substantially the same manner as Example 1.
Above-mentioned various prefabricated concrete solid piles of the present utility model during fabrication need only be according to the shape needs of external surface, and the mould that is complementary according to the conventional method design gets final product, and it is simple to have processing technology, and cost is low, beneficial effects such as steady quality.
In sum, described in this manual is several preferred embodiment of the present utility model, and above embodiment is only unrestricted in order to the explanation the technical solution of the utility model.All technician in the art comply with design of the present utility model on the basis of existing technology by the available technical scheme of logical analysis, reasoning, or a limited experiment, all should be within claim protection domain of the present utility model.

Claims (9)

1. a prefabricated concrete solid pile comprises pile body at least, and described pile body is a solid polyhedron; It is characterized in that: the external surface of described pile body is for increasing rubbing surface.
2. prefabricated concrete solid pile as claimed in claim 1 is characterized in that: described increase rubbing surface is the burr on the described pile body external surface.
3. prefabricated concrete solid pile as claimed in claim 1 is characterized in that: described increase rubbing surface is the screw thread on the described pile body external surface.
4. prefabricated concrete solid pile as claimed in claim 1 is characterized in that: described increase rubbing surface is a plurality of protuberances on the described pile body external surface.
5. prefabricated concrete solid pile as claimed in claim 1 is characterized in that: described increase rubbing surface is a plurality of corrugated parts on the described pile body external surface.
6. as the arbitrary described prefabricated concrete solid pile of claim 1 to 5, it is characterized in that: described pile body is a tetragonal body.
7. as the arbitrary described prefabricated concrete solid pile of claim 1 to 5, it is characterized in that: described pile body is the tetragonal body that an end is big, an end is little.
8. prefabricated concrete solid pile as claimed in claim 6, it is characterized in that: described tetragonal body also has the guide portion of a taper.
9. prefabricated concrete solid pile as claimed in claim 1 is characterized in that: described pile body is prefabricated concrete spare.
CN2011200404825U 2011-02-17 2011-02-17 Prefabricated concrete solid pile Expired - Fee Related CN202000340U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200404825U CN202000340U (en) 2011-02-17 2011-02-17 Prefabricated concrete solid pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200404825U CN202000340U (en) 2011-02-17 2011-02-17 Prefabricated concrete solid pile

Publications (1)

Publication Number Publication Date
CN202000340U true CN202000340U (en) 2011-10-05

Family

ID=44703085

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200404825U Expired - Fee Related CN202000340U (en) 2011-02-17 2011-02-17 Prefabricated concrete solid pile

Country Status (1)

Country Link
CN (1) CN202000340U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102644270A (en) * 2011-02-17 2012-08-22 上海奥米制药装备有限公司 Precast-concrete solid pile

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102644270A (en) * 2011-02-17 2012-08-22 上海奥米制药装备有限公司 Precast-concrete solid pile

Similar Documents

Publication Publication Date Title
CN105297765B (en) A kind of marine wind electric field fan combined type rock-socketed pile foundation and its construction method
CN204059342U (en) Be applicable to the marine wind electric field fan single-pile foundation of deep soft layer
CN204370469U (en) A kind of drilled pile long leg jacket offshore wind turbine foundation
CN105297764B (en) Marine wind electric field fan single-pile foundation and its construction method
CN105862906A (en) Offshore wind power plant draught fan single pile foundation and construction method
CN103074903B (en) Pile casing type cast-in-place concrete pile for fan foundation in soft foundation of shoal or quicksand area
CN202124862U (en) Spiral-anchor plate type composite foundation
CN201972146U (en) Prefabricated concrete pipe pile
CN202000340U (en) Prefabricated concrete solid pile
CN205116207U (en) Offshore wind farm fan combined type embedded rock pile basis
CN203334295U (en) Large-diameter arc-shaped steel sheet pile foundation pit supporting structure
CN103726505B (en) Offshore wind plant wind turbine foundation
CN102383419A (en) Special reinforced tubular pile and processing method thereof
CN104074196A (en) Novel composite pile enclosure structure and construction method thereof
CN102644271A (en) Precast-concrete tubular pile
CN102644270A (en) Precast-concrete solid pile
CN206090823U (en) Precast concrete frame girder segment point
CN208472775U (en) Structure is built along subinverse construction room on a kind of basement
CN202214722U (en) Square cylindrical wave node pipe pile
CN208633139U (en) A kind of offshore wind farm embedded rock pile single pile plants pile foundation and offshore wind farm field system
CN203684267U (en) Novel offshore wind power basic structure
CN208792356U (en) Pile group foundation with star-shaped through holes
CN205116208U (en) Offshore wind farm fan single pile basis
CN201620514U (en) Self-locking type earth-retaining blocks
CN202214721U (en) Square prismatic tubular pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice

Addressee: Shanghai Aomi Pharmaceutical Equipment Co., Ltd.

Document name: Notification to Pay the Fees

DD01 Delivery of document by public notice

Addressee: Shanghai Aomi Pharmaceutical Equipment Co., Ltd.

Document name: Notification of Termination of Patent Right

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111005