CN201992344U - Integrative natural gas production skid-mounted device of nonacid single-well gas gathering station - Google Patents
Integrative natural gas production skid-mounted device of nonacid single-well gas gathering station Download PDFInfo
- Publication number
- CN201992344U CN201992344U CN2011200471444U CN201120047144U CN201992344U CN 201992344 U CN201992344 U CN 201992344U CN 2011200471444 U CN2011200471444 U CN 2011200471444U CN 201120047144 U CN201120047144 U CN 201120047144U CN 201992344 U CN201992344 U CN 201992344U
- Authority
- CN
- China
- Prior art keywords
- gas
- nonacid
- gathering station
- skid
- station
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Pipeline Systems (AREA)
Abstract
The utility model discloses an integrative natural gas production skid-mounted device of a nonacid single-well gas gathering station, which comprises a skid base, a water jacket heater and a gas-liquid separator, wherein the water jacket heater and the gas-liquid separator serve as a combined device body and fixed on the skid base. The water jacket heater and the gas-liquid separator are firstly combined as an integral body, and then a metering system, a sewerage system, a gas self-consumption system are connected to form an integral body through external connecting flanges of the combined device. The integrative natural gas production skid-mounted device of the nonacid single-well gas gathering station has the advantages of realizing remote control and improving traditional station construction mode intensively, optimizing technological process, ground facilities and management mode of a traditional single-well gas gathering station and providing a technology platform for scientific placement reduction, resolving the problems that the single-well gas gathering station has large device quantity, large occupied area, high proportion of the investment, much placement and the like, realizing quick production of a gas field, increasing construction efficiency of the gas field, shortening field construction period and space between station equipment, improving construction environment, and reducing maintenance time and comprehensive construction cost of the gas field.
Description
Technical field
The utility model relates to a kind of combined type gas gathering and transportation equipment, especially relates to a kind of integrated gas production skid-mounted unit that can be widely used in domestic and international non-sulfur-containing gas gathering station field.
Background technique
Along with the fast development of the domestic and international energy and exploitation rapidly, World's Oil and Gas Resources mainly is distributed in the Middle East, the Central Asia, Siberia, areas such as South America and continental shelf, ocean, oil gas field newly developed mainly is distributed in the Gobi desert, desert and mountain area etc. are meagrely-populated, natural environmental condition is abominable, ungetable area, conventional design and assembled on site construction technology and management mode are carried out the incompatible fast-developing situation of oil gas field construction, need to improve, promote and study new integration apparatus and package technique, could satisfy the oil gas field construction field continues, a fast-developing demand and an improvement station management mode, the optimum management personnel realize a station unmanned.
The defeated domestic Xinjiang that mainly is distributed in of project of natural collection of China's present stage, gas fields such as Jilin, international item is distributed in the Sudan, Kazakhstan, the Turkmenistan, Iraq, countries such as Iran and Indonesia, natural gas resource is abundant, well station quantity is many, arrange intensive, but be located in desert, Gobi desert and mountain area, the geographical position is remote, meagrely-populated, physical environment is abominable, has inconvenient traffic, field work is very arduous, be badly in need of shortening the field construction cycle and optimize a station management mode, be badly in need of using a kind of high efficiency, high quality and multi-functional equipment substitute single, quantity is many, arranges the equipment that disperses, need up to a million dollars of covers if introduce this integrated equipment of a cover, it costs an arm and a leg, and the delivery cycle is long, maintenance and after sales service inconvenience.Simultaneously, along with having come into effect such as superprojects such as Amu Darya right bank B district, Turkmenistan, the about Nock-tems in south, this demand cry efficient, high-quality integral device is increasingly sharpened, therefore, the research of carrying out the integrated sledge dress of gas production integrated technology is imperative and presses for solution, and integrated technology simply is integrated into combined equipment to single devices anything but, but the equipment of novel, the efficient and compact structure of integrated requirement is satisfied in research.
The model utility content
The utility model has overcome shortcoming of the prior art, provide a kind of nonacid individual well gas gathering station integrated gas production skid-mounted unit, can solve that number of devices is many in the gas field development, floor space is big, ratio between investments is big, personnel dispose problems such as many, that maintenance time is long, can also solve long period design, buying and construction simultaneously and influence the problem of operation progress; Reliable in quality, compact structure, regular shape, be easy to resettlement, be particularly suitable for the rolling development in gas field.
The technical solution of the utility model is: the integrated gas production skid-mounted unit of a kind of nonacid individual well gas gathering station comprises that sledge seat and body are fixed on water jacket furnace and the gas-liquid separator on the sledge seat; By the external adpting flange on water jacket furnace and the gas-liquid separator metering system, drainage, consumable gas system are linked into an integrated entity.
Described water jacket furnace is provided with flame-out protection device, weight adjustment device and automatic ignition device; The safety vent device is set on described gas-liquid separator; The formation shaped steel of described sledge seat comprises channel-section steel, angle steel or I-steel.
Compared with prior art, the utility model has the advantages that: with these scattered equipment integrations such as the oven in the individual well gas gathering station, throttle element, personal device of air, separator, natural gas metering device and supporting valve, pipeline, instrument is one, form the combined equipment of whole manufacturing, whole Transporting and integral installation, can concentrate and realize telecontrol, improve traditional pattern of building a station; Technological process, ground installation and the management mode of traditional individual well gas gathering station have been optimized, for science reduction personnel configuration provides technology platform; Solved that number of devices is many in traditional individual well gas gathering station, floor space is big, ratio between investments is big, personnel dispose problems such as many, realized that the gas field goes into operation fast, improve the gas field construction efficiency, shorten the field construction cycle, shortened the spacing of station equipment, reduce maintenance time, improve construction environment, reduce gas field comprehensive construction cost.
Description of drawings
The utility model will illustrate by example and with reference to the mode of accompanying drawing, wherein:
Fig. 1 is a plan view of the present utility model;
Fig. 2 is that A of the present utility model is to view;
Fig. 3 is that B of the present utility model is to view.
Embodiment
The integrated gas production skid-mounted unit of a kind of nonacid individual well gas gathering station, as shown in Figure 1 to Figure 3, comprising: drainage 1, gas-liquid separator 2, metering system 3, first electronic block valve 4, the second electronic block valve 5, throttle valve 6, pressure-detecting device 7, water jacket furnace 8 etc.
With these scattered equipment integrations such as the water jacket furnace in the individual well gas gathering station 8, throttle element (comprising elements such as throttle valve 6), personal device of air, gas-liquid separator 2, metering system 3 and supporting valve, pipeline, instrument is one, form the combined equipment of whole manufacturing, whole Transporting and integral installation, this equipment has advanced scientific and technological level and automatic control level, can concentrate and realize telecontrol, improve traditional pattern of building a station.
Personal device of air comprises gas for domestic use, water jacket furnace fuel gas, igniting primer usefulness gas etc.
Blowout protection, weight adjustment device and automatic ignition device are set on water jacket furnace, are provided with the safety vent device on gas-liquid separator, the emptying of this skid-mounted unit, drainage should link to each other with the emptying drainage at well station.
In the design process of integrated sledge dress, especially the structure of the integrated combination of oven and gas-liquid separator, inner member is carried out intensity and stress analysis and whole integrated system is carried out stress analysis, the choose reasonable strong point, support element and pipeline wall thickness thereof select for use advanced pumping equipment, front and back not to have the flowmeter that straight tube requires; Oven adopts the water batch heater equipment of new high-efficiency.Automatic control system to process parameter on the integrated equipment and equipment running status monitor, control and data capture.By communications system process parameter is uploaded to the host computer system and shows, report to the police and store, realize telecontrol.
The integrated of the integrated gas production skid-mounted unit of nonacid individual well gas gathering station is that first combined equipment with water jacket furnace and gas-liquid separator is that body is fixed on the sledge seat, the sledge seat is made up of all kinds of shaped steel, pass through the external adpting flange of combined equipment then with metering system, drainage, consumable gas system links together, and the force analysis by pipe-line system, be provided with the supporting member of enough rigidity at the diverse location of system, at last pressure-bearing pipeline and pipe fitting are carried out corresponding stress analysis, simultaneously the base that bears gravitational load is carried out the amount of deflection analysis according to the principle and the principle of pressure piping stress analysis.
The sledge seat is made of shaped steel such as channel-section steel, angle steel, I-steel.
Working principle of the present utility model is: when the well head pressure mixed gas, be delivered to horizontal type gas and liquid separator through the heating of water jacket furnace coil pipe, throttling, defeated pressure, after just the rock gas of branch enters the smart branch of gas-liquid separation element again through gravitational settling, enter metering system; Isolated gas field sewage is discharged into sewage-treatment plant automatically by drainage.
Claims (4)
1. integrated gas production skid-mounted unit of nonacid individual well gas gathering station is characterized in that: comprise that sledge seat and body are fixed on the water jacket furnace on the sledge seat and the combined equipment of gas-liquid separator; By the external adpting flange on the combined equipment metering system, drainage, consumable gas system are linked into an integrated entity.
2. the integrated gas production skid-mounted unit of nonacid individual well gas gathering station according to claim 1, it is characterized in that: described water jacket furnace is provided with flame-out protection device, weight adjustment device and automatic ignition device.
3. the integrated gas production skid-mounted unit of nonacid individual well gas gathering station according to claim 1 is characterized in that: the safety vent device is set on described gas-liquid separator.
4. according to the integrated gas production skid-mounted unit of the described nonacid individual well gas gathering station of each claim in the claim 1 to 3, it is characterized in that: the formation shaped steel of described sledge seat comprises channel-section steel, angle steel or I-steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200471444U CN201992344U (en) | 2011-02-25 | 2011-02-25 | Integrative natural gas production skid-mounted device of nonacid single-well gas gathering station |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200471444U CN201992344U (en) | 2011-02-25 | 2011-02-25 | Integrative natural gas production skid-mounted device of nonacid single-well gas gathering station |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201992344U true CN201992344U (en) | 2011-09-28 |
Family
ID=44668834
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011200471444U Expired - Lifetime CN201992344U (en) | 2011-02-25 | 2011-02-25 | Integrative natural gas production skid-mounted device of nonacid single-well gas gathering station |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201992344U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103603649A (en) * | 2013-11-29 | 2014-02-26 | 中国石油集团川庆钻探工程有限公司 | Oil-gas throttling, heat-preserving, separating and metering integrated equipment |
CN105239993A (en) * | 2014-07-09 | 2016-01-13 | 王学军 | High-pressure oil, gas, water and solid four-phase separating and metering device for wellhead of skid-mounted oil and gas field |
-
2011
- 2011-02-25 CN CN2011200471444U patent/CN201992344U/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103603649A (en) * | 2013-11-29 | 2014-02-26 | 中国石油集团川庆钻探工程有限公司 | Oil-gas throttling, heat-preserving, separating and metering integrated equipment |
CN105239993A (en) * | 2014-07-09 | 2016-01-13 | 王学军 | High-pressure oil, gas, water and solid four-phase separating and metering device for wellhead of skid-mounted oil and gas field |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103527927B (en) | Skid-mounted natural gas gathering and transporting device | |
CN203905913U (en) | Natural gas recovery system for gas testing pilot production | |
CN103628857B (en) | Crude oil gas-liquid separation process integration method and equipment thereof | |
CN204238243U (en) | A kind of city integrated piping lane | |
CN202419137U (en) | Bulk multi-way valve intelligent well-selecting metering station | |
CN104776312B (en) | Device type selection method for L-CNG station | |
CN201992344U (en) | Integrative natural gas production skid-mounted device of nonacid single-well gas gathering station | |
CN104294845B (en) | A kind of city integrated piping lane | |
CN203907219U (en) | Natural gas collecting all-in-one integrated device | |
CN105239993A (en) | High-pressure oil, gas, water and solid four-phase separating and metering device for wellhead of skid-mounted oil and gas field | |
CN104214512A (en) | Natural-gas-collecting integrating device | |
CN201992345U (en) | Integrated natural gas production and skid-mounted device for high-acidity single-well gas gathering station | |
CN201121768Y (en) | Manufactory pipe network arrangement structure | |
CN201381836Y (en) | Oilfield multiwell short-distance cascading oil collecting device | |
CN201561270U (en) | Skid-mounted separating metering device | |
CN201434717Y (en) | Large-sized structure weighting device based on detection of low-oil pressure built-in weight sensor | |
CN101440894B (en) | Method and structure for arranging plant pipe network | |
CN201013321Y (en) | Oil gas field multi-well short-distance casecade gas collection device | |
CN212430454U (en) | Double-pressure system of gas collecting station | |
CN201606112U (en) | 300-cubic meter stirring type high-water expanding material filling complete equipment | |
CN203907218U (en) | Natural gas collecting all-in-one integrated device | |
CN202211012U (en) | Vertical three-dimensional greening device convenient in assembly and disassembly | |
CN202061429U (en) | Split type thickener transported and arranged in modularization manner | |
CN204901344U (en) | Contain sulphur natural gas throttle measurement integration device | |
CN204356834U (en) | A kind of vertical bearing plate of rainwater-collecting module |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180117 Address after: 610041 Chengdu high tech Zone, Sichuan province sublimation Road No. 6 Patentee after: China Petroleum Engineering Construction Co Ltd Address before: 610017 Sichuan province Chengdu Xiaoguan Temple Backstreet No. 25 Patentee before: Engineering Design Co., Ltd., China Petroleum Group |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20110928 |