CN203907218U - Natural gas collecting all-in-one integrated device - Google Patents

Natural gas collecting all-in-one integrated device Download PDF

Info

Publication number
CN203907218U
CN203907218U CN201420082048.7U CN201420082048U CN203907218U CN 203907218 U CN203907218 U CN 203907218U CN 201420082048 U CN201420082048 U CN 201420082048U CN 203907218 U CN203907218 U CN 203907218U
Authority
CN
China
Prior art keywords
valve
gas
pipeline
disengagement chamber
natural gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420082048.7U
Other languages
Chinese (zh)
Inventor
林忠灿
赵永楼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Hangtian Delin Machinery Manufacturing Co ltd
Original Assignee
Shaanxi Space Flight De Lin Machinery Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Space Flight De Lin Machinery Manufacturing Co Ltd filed Critical Shaanxi Space Flight De Lin Machinery Manufacturing Co Ltd
Priority to CN201420082048.7U priority Critical patent/CN203907218U/en
Application granted granted Critical
Publication of CN203907218U publication Critical patent/CN203907218U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Vaporization, Distillation, Condensation, Sublimation, And Cold Traps (AREA)

Abstract

The utility model relates to a natural gas collecting all-in-one integrated device, which at least comprises a skid seat, a separation flash evaporation tank, a gas-liquid separator, a flow rate meter, a pressure reducing valve, a drain valve, a water pressurizing tank and each connecting pipeline, wherein the separation flash evaporation tank, the gas-liquid separator, the flow rate meter, the pressure reducing valve, the drain valve, the water pressurizing tank and each connecting pipeline are arranged on the skid seat. The natural gas collecting all-in-one integrated device has the advantages that nine major functions such as station entering cut-off of a gas collecting station, main manifold remote evacuation, gas-liquid separation, flow process switching, outward conveying metering, pipe clearing, self use gas supply, flash evaporation and evacuation liquid separation are integrated onto one skid body, and the function and the self control level are identical to those of a digital gas collecting station, so that station field equipment is reduced, the construction is simplified, the occupied area is reduced, and the investment is reduced.

Description

Natural gas collecting integrated device
Technical field
The utility model relates to oil gas field production gas technology field, and particularly the collection of rock gas is defeated, is a kind of natural gas collecting integrated device.
Background technique
Along with expanding economy, country is increasing to the demand of the energy, and as the rock gas of clean energy resource, development speed is swift and violent.In gas exploitation course, need to build gas gathering station, carry out gas to receive well site, it is collected, is measured after processing, supercharging.Gas gathering station has the functions such as gas collection, separation, metering, supercharging, pigging.
Conventionally, the gas gathering station of Standard capacity includes multiple districts such as the district of entering the station, separator district, personal gas area, metering Wai Shu district, flash distillation separatory tank field; The floor space of whole gas gathering station is minimum is 5-6 mu of ground, and pipeline arranges, personnel's configuration is relatively many, the various complexity of district's equipment of standing, and maintaining is relative complex also.Particularly, device category that this gas gathering station needs is many, distinct device placement location is distant, thereby the complexity of installation, and each equipment need be separately according to apparatus characteristic making ground, and civilwork engineering quantity is large, this equipment can only be fixed on a station and use, this station can not produce rear equipment and will scrap, and therefore, current gas gathering station is because equipment is isolated, the problem such as cause the investment of gas gathering station large, equipment secondary utilization ratio is low, and energy consumption is large.
Model utility content
The utility model has overcome above-mentioned shortcoming of the prior art, and a kind of natural gas collecting integrated device is provided, and this device is manufactured and debugged in factory, and shipping container assembling, is directly lifted into scene, installs simple.
Natural gas collecting integrated device of the present utility model, at least comprise: sledge seat and be installed on the separation flash drum 2 on sledge seat, gas-liquid separator 28, flowmeter 8, reduction valve 27, drain valve 10, 11, pressure tank 9 and each connecting line, this device inlet is provided with ten tunnel gas production mains and carrys out gas import, every road is all provided with electric T-shaped valve, ten tunnel gas production mains carry out gas and enter header by electric T-shaped valve, by the gas that comes of header set No. ten mains, enter described separation flash drum by pipeline, described separation flash drum divides sap cavity to form by disengagement chamber and flash distillation, be provided with tee ball valve 4 and electric ball valve 3 in disengagement chamber downstream, realize the flow process switching that virgin gas enters compressor, described disengagement chamber liquid port arranges drain valve 10, the recovered water that disengagement chamber separates directly enters flash distillation through this drain valve and divides in sap cavity, described flash distillation divides sap cavity liquid port that pressure tank 9 and drain valve 11 are set, on natural gas line after disengagement chamber separates, the flowmeter 8 to external transport pipeline is set, in addition, pipeline is provided with the personal gas modulating valve of two-way 30, one tunnels and uses a road for subsequent use, is provided with gas-liquid separator 28 and reduction valve 27 before described modulating valve 30, described emptying house steward carrys out gas and accesses described flash distillation and divide sap cavity, after separatory, accesses and releases flare.
Compared with prior art, the utility model has the advantages that: natural gas collecting integrated device, this device by entering the station of gas gathering station block, total long-range emptying of header, gas-liquid separation, flow process switchings, outer defeated metering, pigging, the 9 large functions such as gas supply, flash distillation, emptying liquid-separation of using by oneself is integrated in 1 skid body, its function, automatic control level are consistent with digitizing gas collection station, to reduce station field device, simplify construction, reduce and take up an area, reduce investment.
Brief description of the drawings
Fig. 1 is natural gas collecting integrated device parts and pipeline schematic diagram.
Embodiment
A kind of natural gas collecting integrated device, as shown in Figure 1, comprising: sledge seat and be installed on each gas recovery well on sledge seat and carry out gas and carry out aggregation system, separating system for water, discharge opeing and emptying through flash drum processing system, pipeline cleaning system, outer defeated metering system, personal gas depressurized system, Digitizing And Control Unit and mating valve, each connecting line.Particularly, this device inlet is provided with ten tunnel gas production mains and carrys out gas import, and every road is all provided with electric T-shaped valve.While normally entering the station, ten tunnel gas production mains carry out gas and enter header by electric T-shaped valve, by the gas that comes of header set No. ten mains, enter described separation flash drum 2 by pipeline; In the time that main needs emptying, electric T-shaped valve switching flow, to blow-down pipe, is finally discharged in total blow-down pipe; When some pipes maybe need to close without entering the station, adjust electric T-shaped valve to closed condition.
Described separation flash drum 2 divides sap cavity two-part to form by disengagement chamber and flash distillation, be provided with tee ball valve 4 and electric ball valve 3 in disengagement chamber downstream, realize the flow process switching that virgin gas enters compressor, simultaneously, reserve rock gas to rock gas after the pipeline interface of compressor and compressor boost and entered sledge pipeline interface, when winter is when pressure decreased, can pass through compressor boost.Described disengagement chamber liquid port pipeline divides two-way, one tunnel arranges drain valve 10, the recovered water that disengagement chamber separates directly enters flash distillation through this drain valve and divides in sap cavity, another road is through ball valve 12, electronic semispherical valve 13 and electric ball valve 14, drain into Water Tank, described ball valve 12 is for controlling the switch of urgent drainage system, described electronic semispherical valve 13 and electric ball valve 14 with separate flash drum level meter interlock, when level meter liquid level reaches a certain height, drain valve is arranged in disadvantageous situation, automatically open electronic semispherical valve, regulate openings of sizes, automatically open and close electric ball valve simultaneously.Described flash distillation divides sap cavity liquid port that pressure tank 9 and drain valve 11 are set, be pressed onto ground sewage tank with the waste liquid that stably flash distillation is divided flow container to discharge, and control for convenient, flash section discharge opeing entrance pressure water pot can be set in pressure tank 9 upstreams and manually control ball valve 21, electronic control ball valve 22 and pressure tank discharge opeing is set and manually control ball valve 23, automatically control ball valve 24.
On natural gas line after disengagement chamber separates, the flowmeter 8 to external transport pipeline is set, described flowmeter 8 can be plate type flow rate meter or differential pressure flowmeter, to realize the accurate-metering to the outer displacement of gas collection sledge.For convenience of pigging, can also further on this pipeline, be provided with pipe cleaning valve 6 and be positioned at the manual ball valve 5 of described pipe cleaning valve 6 rear and front ends, described pipe cleaning valve can be PN63DN200 or DN250.
In addition, blow-down pipe control ball valve 15, safety valve 16 and gate valve 17 can also be set on pipeline, and long-range emptying electric ball valve 18 and choke stop evacuation valve 19, to ensure the stable of emptying.
Personal gas is got after gas from external transport pipeline, through electric heater 25 heat treatments, in the future 0-20 DEG C of temperature degree is heated to 35 DEG C, by separating after reduction valve 27 decompressions, for pressure tank, methanol tank, Water Tank, the district of releasing flare, kitchen, generator fuel gas again.Also reserved from the compressor air cooling device gas interface that comes, as spare interface simultaneously.In addition, pipeline is provided with the personal gas modulating valve 30 of two-way, the using and the reserved, and modulating valve 30 front ends are provided with gas-liquid separator 28.
Many blow-down pipes and emergency blow-down pipeline are set in the skid body of this device, comprise total header emergency discharging pipe line, stand in each blow-down pipe, pressure tank blow-down pipe and receive emptying house steward pipeline.Emergency blow-down pipeline comprises two-way pipeline, is respectively safety valve automatic evacuation and electronic telecontrol emptying, be swift in response in superpressure or accident condition, and emergency blow-down.
The on-the-spot Displaying Meters such as multiple thermometers, pressure gauge, reading out data are on the spot set on the pipeline of described device as required.
By reference to the accompanying drawings the utility model is carried out to exemplary description above; obvious realization of the present utility model is not subject to the restrictions described above; as long as the various improvement that adopted method design of the present utility model and technological scheme to carry out; or without improving, design of the present utility model and technological scheme are directly applied to other occasion, all in protection domain of the present utility model.

Claims (6)

1. a natural gas collecting integrated device, it is characterized in that, at least comprise: sledge seat and be installed on the separation flash drum (2) on sledge seat, gas-liquid separator (28), flowmeter (8), reduction valve (27), drain valve (10, 11), pressure tank (9) and each connecting line, pipeline is provided with inlet control valve (1), before inlet control valve, is furnished with emptying house steward, described separation flash drum (2) divides sap cavity to form by disengagement chamber and flash distillation, be provided with tee ball valve (4) and electric ball valve (3) in disengagement chamber downstream, realize the flow process switching that virgin gas enters compressor, described disengagement chamber liquid port arranges drain valve (10), the recovered water that disengagement chamber separates directly enters flash distillation through this drain valve and divides in sap cavity, described flash distillation divides sap cavity liquid port that pressure tank (9) and drain valve (11) are set, on natural gas line after disengagement chamber separates, the flowmeter (8) to external transport pipeline is set, in addition, pipeline is provided with the personal gas modulating valve (30) of two-way, one tunnel is used a road for subsequent use, front gas-liquid separator (28) and the reduction valve (27) of being provided with of described modulating valve (30), described emptying house steward carrys out gas and accesses described flash distillation and divide sap cavity, after separatory, accesses and releases flare.
2. install as claimed in claim 1, it is characterized in that, described flowmeter (8) is plate type flow rate meter or differential pressure flowmeter.
3. install as claimed in claim 1, it is characterized in that the front electric heater (25) that arranges of described reduction valve (27).
4. device as claimed in claim 1, is characterized in that, is provided with pipe cleaning valve (6) and is positioned at the manual ball valve (5) of described pipe cleaning valve (6) rear and front end on the natural gas line after disengagement chamber separates.
5. install as claimed in claim 1, it is characterized in that, the pipeline that enters the station comprises blow-down pipe and emergency blow-down pipeline.
6. as described in claim 1-5 any one, install, it is characterized in that, multiple thermometers, pressure gauge are further set on the pipeline of described device.
CN201420082048.7U 2014-02-25 2014-02-25 Natural gas collecting all-in-one integrated device Expired - Lifetime CN203907218U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420082048.7U CN203907218U (en) 2014-02-25 2014-02-25 Natural gas collecting all-in-one integrated device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420082048.7U CN203907218U (en) 2014-02-25 2014-02-25 Natural gas collecting all-in-one integrated device

Publications (1)

Publication Number Publication Date
CN203907218U true CN203907218U (en) 2014-10-29

Family

ID=51781496

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420082048.7U Expired - Lifetime CN203907218U (en) 2014-02-25 2014-02-25 Natural gas collecting all-in-one integrated device

Country Status (1)

Country Link
CN (1) CN203907218U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103968249A (en) * 2014-02-25 2014-08-06 陕西航天德林机械制造有限公司 Natural gas collection integrated device
CN104390142A (en) * 2014-11-12 2015-03-04 中国石油天然气股份有限公司 Automatic liquid discharge system of gas-liquid separator with emergency liquid discharge capacity

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103968249A (en) * 2014-02-25 2014-08-06 陕西航天德林机械制造有限公司 Natural gas collection integrated device
CN104390142A (en) * 2014-11-12 2015-03-04 中国石油天然气股份有限公司 Automatic liquid discharge system of gas-liquid separator with emergency liquid discharge capacity

Similar Documents

Publication Publication Date Title
CN103968249A (en) Natural gas collection integrated device
CN203907219U (en) Natural gas collecting all-in-one integrated device
CN104214512A (en) Natural-gas-collecting integrating device
CN103527927B (en) Skid-mounted natural gas gathering and transporting device
CN204865262U (en) Gas stove catch water
CN203383854U (en) Buffering system for solving problem of tunnel local sudden water burst
CN203907218U (en) Natural gas collecting all-in-one integrated device
CN204040178U (en) A kind of pond of separating cryogenic liquid and rainwater
CN105065908A (en) Sulfur-contained natural gas collection integrated device
CN203393117U (en) Separation flash distillation device
CN106351611B (en) Gas well open flow automates energy-saving combustion apparatus
CN201588294U (en) Backflow-preventing type drainage structure of circulating water pump room
CN203080679U (en) Simple condensate liquid discharging device of landfill gas collecting system
CN206682608U (en) Underground power house turbine oil depot oil filtering system pipeline structure
CN202832470U (en) Crude oil gas-liquid separation process integrated equipment
CN106838623B (en) Gas drainage system with spring sealed ball
CN212417088U (en) Oil gas water pipe type separator
CN203309504U (en) Air-separation steam trap device
CN201440006U (en) Solar water heater
CN103994491A (en) Solar water heater double-water-tank family splitting heating system and installing method thereof
CN204343378U (en) A kind ofly utilize domatic flowing water as the tunnel fire protection system at water source
CN203452767U (en) Automatic metering device for oil well tipping bucket
CN203743842U (en) Recovery system of BOG (Boil Off Gas) of normal-pressure low-temperature LNG (Liquefied Natural Gas) storage tank
CN207195147U (en) Gas-pressed equipment
CN206738940U (en) Multifunctional assembled skid-mounted unit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHAANXI HANGTIAN DELIN FLUID EQUIPMENT MANUFACTURI

Free format text: FORMER NAME: SHAANXI HANGTIAN DELIN MACHINERY MANUFACTURING CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: Jinghe Industrial Park Jingwei ten road 710200 Shaanxi city of Xi'an province No. 8

Patentee after: SHANXI HANGTIAN DELIN MACHINERY MANUFACTURING CO.,LTD.

Address before: Jinghe Industrial Park Jingwei ten road 710200 Shaanxi city of Xi'an province No. 8

Patentee before: SHANXI HANGTIAN DELIN MACHINERY MANUFACTURING CO.,LTD.

C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: Gaoling County Jinghe Industrial Park Jingwei ten road 710200 Shaanxi city of Xi'an province No. 18 space Delin building room 108

Patentee after: SHANXI HANGTIAN DELIN MACHINERY MANUFACTURING CO.,LTD.

Address before: Jinghe Industrial Park Jingwei ten road 710200 Shaanxi city of Xi'an province No. 8

Patentee before: SHANXI HANGTIAN DELIN MACHINERY MANUFACTURING CO.,LTD.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20141029