CN201989232U - 一种预制箱梁顶板的钢筋绑扎胎具 - Google Patents

一种预制箱梁顶板的钢筋绑扎胎具 Download PDF

Info

Publication number
CN201989232U
CN201989232U CN2011200636076U CN201120063607U CN201989232U CN 201989232 U CN201989232 U CN 201989232U CN 2011200636076 U CN2011200636076 U CN 2011200636076U CN 201120063607 U CN201120063607 U CN 201120063607U CN 201989232 U CN201989232 U CN 201989232U
Authority
CN
China
Prior art keywords
steel bar
top board
bar binding
steel
crossbeam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200636076U
Other languages
English (en)
Inventor
范琦
舒建辉
黄炳文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 25th Bureau Group Co Ltd
Beijing Rail Transit Engineering Construction Co Ltd of China Railway 16th Bureau Group Co Ltd
China Railway Urban Construction Group Co Ltd
Second Engineering Co Ltd of China Railway Urban Construction Group Co Ltd
Original Assignee
China Railway 25th Bureau Group Construction and Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 25th Bureau Group Construction and Installation Engineering Co Ltd filed Critical China Railway 25th Bureau Group Construction and Installation Engineering Co Ltd
Priority to CN2011200636076U priority Critical patent/CN201989232U/zh
Application granted granted Critical
Publication of CN201989232U publication Critical patent/CN201989232U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了一种预制箱梁顶板的钢筋绑扎胎具,包括若干混凝土基础、支架、横梁、钢筋定位槽,所述支架固定于所述混凝土基础上,所述横梁架设于所述若干支架上,所述若干钢筋定位槽固定于所述横梁上,所述每个钢筋定位槽开口向上,用于定位钢筋。本实用新型可大大减少占用制梁台座和箱梁模板的时间,节省梁场建设成本。

Description

一种预制箱梁顶板的钢筋绑扎胎具
技术领域
本实用新型涉及一种预制箱梁顶板的钢筋绑扎胎具。
背景技术
目前,箱梁预制顶板钢筋绑扎的过程一般是在箱梁的模板内完成。这种绑扎方式存在的缺陷是:
预制箱梁顶板钢筋绑扎过程占用制梁台座以及箱梁模板的时间太长,不利于制梁台座和箱梁模板的周转利用,不能有效地节省梁场建设成本。
实用新型内容
本实用新型要解决的技术问题是提供一种预制箱梁顶板的钢筋绑扎胎具,可大大减少占用制梁台座和箱梁模板的时间,节省梁场建设成本。
为解决上述技术问题,本实用新型的技术方案是:
一种预制箱梁顶板的钢筋绑扎胎具,包括若干混凝土基础、支架、横梁、钢筋定位槽,
所述支架固定于所述混凝土基础上,
所述横梁架设于所述若干支架上,
所述若干钢筋定位槽固定于所述横梁上,所述每个钢筋定位槽开口向上,用于定位钢筋。
作为改进,本实用新型所述横梁上还设有若干用于定位顶板泄水孔/或预留孔的定位管。
优选地,本实用新型所述混凝土基础为呈条形的混凝土条形基础;所述横梁为型钢横梁;所述支架为钢支架。
优选地,本实用新型所述定位管为定位钢管。
由上可见,与现有技术相比,本实用新型有如下有益效果:
改变了传统的直接在制梁台座上绑扎钢筋的施工工艺,大大减少了占用制梁台座和箱梁模板的时间,且能快速准确定位箱梁顶板钢筋位置、预留孔及预埋件位置,提高了钢筋绑扎效率,此外,整个胎具可根据预制箱梁顶板的外形尺寸以及钢筋保护厚度加工制成,使用非常方便。
附图说明
此处所说明的附图用来提供对本实用新型的进一步理解,构成本申请的一部分,并不构成对本实用新型的不当限定,在附图中:
图1为本实用新型实施例的结构示意图。
具体实施方式
下面将结合附图以及具体实施例来详细说明本实用新型,在此本实用新型的示意性实施例以及说明用来解释本实用新型,但并不作为对本实用新型的限定。
如图1所示为本实用新型所述的一种预制箱梁顶板的钢筋绑扎胎具的实施例,包括若干混凝土基础1、支架2、横梁5、钢筋定位槽4,支架2固定于混凝土基础1上,横梁5架设于若干支架2上,若干钢筋定位槽4固定于横梁5上,每个钢筋定位槽4开口向上,用于定位钢筋。
作为改进,在本实施例中,横梁5上还设有若干用于定位顶板泄水孔/或预留孔的定位管3。
在本实施例中,混凝土基础1采用呈条形的混凝土条形基础,这样可节省部分建设成本;横梁5为型钢横梁,支架2采用钢支架,定位管3采用定位钢管,这样横梁5、支架2和定位管3的刚度较好,可更好地满足整个胎具的刚度要求。
具体实施时,可根据梁场实际预制箱梁的外型尺寸来确定胎具的尺寸,也可根据实际预制箱梁顶板上的泄水孔、预留孔来确定定位管的数量和位置,此外,为了胎具的防腐可在钢结构外侧进行涂油漆处理。预制箱梁顶板钢筋在胎具上绑扎完成后,可利用龙门吊和钢筋反吊架将预制箱梁顶板钢筋整体吊入模板。
以上对本实用新型实施例所提供的技术方案进行了详细介绍,本文中应用了具体个例对本实用新型实施例的原理以及实施方式进行了阐述,以上实施例的说明只适用于帮助理解本实用新型实施例的原理;同时,对于本领域的一般技术人员,依据本实用新型实施例,在具体实施方式以及应用范围上均会有改变之处,综上所述,本说明书内容不应理解为对本实用新型的限制。

Claims (6)

1.一种预制箱梁顶板的钢筋绑扎胎具,其特征是:包括若干混凝土基础、支架、横梁、钢筋定位槽,
所述支架固定于所述混凝土基础上,
所述横梁架设于所述若干支架上,
所述若干钢筋定位槽固定于所述横梁上,所述每个钢筋定位槽开口向上,用于定位钢筋。
2.根据权利要求1所述的预制箱梁顶板的钢筋绑扎胎具,其特征是:所述横梁上还设有若干用于定位顶板泄水孔和/或预留孔的定位管。
3.根据权利要求1所述的预制箱梁顶板的钢筋绑扎胎具,其特征是:所述混凝土基础为呈条形的混凝土条形基础。
4.根据权利要求1所述的预制箱梁顶板的钢筋绑扎胎具,其特征是:所述横梁为型钢横梁。
5.根据权利要求1所述的预制箱梁顶板的钢筋绑扎胎具,其特征是:所述支架为钢支架。
6.根据权利要求2所述的预制箱梁顶板的钢筋绑扎胎具,其特征是:所述定位管为定位钢管。
CN2011200636076U 2011-03-11 2011-03-11 一种预制箱梁顶板的钢筋绑扎胎具 Expired - Fee Related CN201989232U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200636076U CN201989232U (zh) 2011-03-11 2011-03-11 一种预制箱梁顶板的钢筋绑扎胎具

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200636076U CN201989232U (zh) 2011-03-11 2011-03-11 一种预制箱梁顶板的钢筋绑扎胎具

Publications (1)

Publication Number Publication Date
CN201989232U true CN201989232U (zh) 2011-09-28

Family

ID=44665734

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200636076U Expired - Fee Related CN201989232U (zh) 2011-03-11 2011-03-11 一种预制箱梁顶板的钢筋绑扎胎具

Country Status (1)

Country Link
CN (1) CN201989232U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735136A (zh) * 2016-03-24 2016-07-06 浙江大学城市学院 箱梁顶板钢筋整体成型模架及施工方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735136A (zh) * 2016-03-24 2016-07-06 浙江大学城市学院 箱梁顶板钢筋整体成型模架及施工方法
CN105735136B (zh) * 2016-03-24 2017-06-23 浙江大学城市学院 箱梁顶板钢筋整体成型模架及施工方法

Similar Documents

Publication Publication Date Title
CN201998323U (zh) 一种预制箱梁底腹板的钢筋绑扎胎具
CN204094924U (zh) 一种可调式多用预制板模具
CN201989232U (zh) 一种预制箱梁顶板的钢筋绑扎胎具
CN210316220U (zh) 一种半成型钢筋网片整体入模结构
CN202658765U (zh) 龙骨构架混凝土抗裂填充墙体
CN202416324U (zh) 基坑工程逆梁顺板施工叠加梁板结构
CN204687050U (zh) 一种预制混凝土矩形梁的模具
CN203716343U (zh) 一种塑料板内模水泥砂浆墙体
CN205171986U (zh) 一种组合式模板
CN206844638U (zh) 一种房屋及其建造模具
CN215471884U (zh) 一种具有定位结构的浇筑混凝土叠合板制作模具
CN210369497U (zh) 一种楼板底模块及楼板
CN102400440B (zh) 一种外模板
CN109296074A (zh) 一种装配式混凝土柱梁连接节点
CN204899034U (zh) 一种预制墙柱
CN211873406U (zh) 预制混凝土空心墙体结构
CN2900666Y (zh) 一种带有混凝土牛腿并可以后置钢牛腿的混凝土立柱
CN110374241B (zh) 一种楼板底模块、楼板及构筑楼板的方法
CN211967880U (zh) 一种用于板类预制构件流水线施工的大模台模具
CN203546908U (zh) 一种装配式建筑墙梁稳定连接结构
CN209304756U (zh) 空调板模具
CN205171450U (zh) 一种组合式模板结构
CN202727092U (zh) 墙体混凝土预制构件边模直筋位置封堵装置
CN201554156U (zh) 一种建筑构造柱
CN202323724U (zh) 一种外模板

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA RAILWAY 25TH BUREAU GROUP CO., LTD.

Effective date: 20120320

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20120320

Address after: 510600, No. 8, 5-7 West Gonghe Road, Guangzhou, Guangdong Province, Yuexiu District

Co-patentee after: CHINA RAILWAY 25TH BUREAU GROUP Co.,Ltd.

Patentee after: CONSTRUCTION INSTALLATION ENGINEERING CO., LTD. OF CHINA RAILWAY 25TH BUREAU Group

Address before: 510600, room 8, 511 Gonghe West Road, Guangdong, Guangzhou, Yuexiu District

Patentee before: Construction Installation Engineering Co., Ltd. of China Railway 25th Bureau Group

ASS Succession or assignment of patent right

Owner name: CHINA RAILWAY URBAN CONSTRUCTION GROUP CO., LTD. C

Free format text: FORMER OWNER: CHINA RAILWAY 25TH BUREAU GROUP CO., LTD.

Effective date: 20141204

C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee

Owner name: THE 2ND ENGINEERING CO., LTD. OF CHINA RAILWAY URB

Free format text: FORMER NAME: CONSTRUCTION INSTALLATION ENGINEERING CO., LTD. OF CHINA RAILWAY NO.25 BUREAU GROUP

CP01 Change in the name or title of a patent holder

Address after: 510600, No. 8, 5-7 West Gonghe Road, Guangzhou, Guangdong Province, Yuexiu District

Patentee after: China Railway Urban Construction Group Second Engineering Co.,Ltd.

Patentee after: CHINA RAILWAY 25TH BUREAU GROUP Co.,Ltd.

Address before: 510600, No. 8, 5-7 West Gonghe Road, Guangzhou, Guangdong Province, Yuexiu District

Patentee before: Construction Installation Engineering Co., Ltd. of China Railway 25th Bureau Group

Patentee before: CHINA RAILWAY 25TH BUREAU GROUP Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20141204

Address after: 510600, No. 8, 5-7 West Gonghe Road, Guangzhou, Guangdong Province, Yuexiu District

Patentee after: China Railway Urban Construction Group Second Engineering Co.,Ltd.

Patentee after: CHINA RAILWAY URBAN CONSTRUCTION GROUP Co.,Ltd.

Patentee after: CHINA RAILWAY 16TH BUREAU GROUP BEIJING ENGINEERING Co.,Ltd.

Patentee after: CHINA RAILWAY 25TH BUREAU GROUP Co.,Ltd.

Address before: 510600, No. 8, 5-7 West Gonghe Road, Guangzhou, Guangdong Province, Yuexiu District

Patentee before: China Railway Urban Construction Group Second Engineering Co.,Ltd.

Patentee before: CHINA RAILWAY 25TH BUREAU GROUP Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110928

Termination date: 20170311

CF01 Termination of patent right due to non-payment of annual fee