CN201953146U - Assembly type maintenance fence - Google Patents
Assembly type maintenance fence Download PDFInfo
- Publication number
- CN201953146U CN201953146U CN2011200615370U CN201120061537U CN201953146U CN 201953146 U CN201953146 U CN 201953146U CN 2011200615370 U CN2011200615370 U CN 2011200615370U CN 201120061537 U CN201120061537 U CN 201120061537U CN 201953146 U CN201953146 U CN 201953146U
- Authority
- CN
- China
- Prior art keywords
- frame pipe
- fence
- pipe
- vertical rod
- bottom level
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
- Fencing (AREA)
Abstract
The utility model discloses an assembly type maintenance fence. An integral maintenance fence (5) is formed by fixedly connecting upright rod rack tubes (3) and top horizontal rack tubes (1) at the two ends, bottom horizontal rack tubes (6) and grille reinforcements (2) between the top horizontal rack tubes (1) and the bottom horizontal rack tubes (6), wherein the bottoms of the bottom horizontal rack tubes (6) are provided with supporting tubes (3); and the upright rod rack tubes (3) of adjacent maintenance fences (5) are connected with one another by using fasteners. The assembly type maintenance fence has the advantages of saving resources, labor and time and being repeatedly used, along with fastness and convenience of assembly and disassembly, safety and reliability.
Description
Technical field
The utility model relates to a kind of fence of safeguarding, particularly relates to a kind of assembling and safeguards fence.
Background technology
The fence of safeguarding that the building site is traditional generally adopts scaffolding steel pipe and fastener to set up, and this kind safeguarded that fence is set up comparatively arbitrarily and use to have and disposablely can not repeatedly be had enough to meet the need use.And speed is slower when setting up, and is consuming time, take a lot of work and the sense organ effect set up relatively poor.
The utility model content
Technical problem to be solved in the utility model provides a kind of peace and tears open fast, and saving of work and time is safe and reliable, and the assembling that can have enough to meet the need is repeatedly safeguarded fence.
In order to solve the problems of the technologies described above, the assembling that the utility model provides is safeguarded fence, vertical rod frame pipe and top, horizontal frame pipe and bottom level frame pipe by two ends and be in described top, horizontal frame pipe and bottom level frame pipe between the grid reinforcing bar be fixedly connected to form the fence of safeguarding of a full wafer, the bottom of described bottom level frame pipe is provided with stay pipe, adopts fastener to be connected between the adjacent described vertical rod frame pipe of safeguarding fence.
The specification of described vertical rod frame pipe is 48 * 3.5mm, and the specification of described top, horizontal frame pipe and bottom level frame pipe is 48 * 3.5mm, and the specification of described stay pipe is 48 * 3.5mm, and the specification of described grid reinforcing bar is φ 12.
Described fastener is the revolution fastener.
Described vertical rod frame pipe and described top, horizontal frame pipe and bottom level frame pipe and described grid reinforcing bar, stay pipe adopt welding to form a full wafer.
Adopt the assembling of technique scheme to safeguard fence, vertical rod frame pipe adopts detachable fastener to be connected with vertical rod frame pipe, sound construction, and stability is strong; Disassembling section is simple, convenient, can repeat turnover and use.And in dismounting and installation process, can not cause damage, reduce the construction cost of unit in charge of construction component.It is big to have resolved safely in the building construction process installation and removal labour intensity, and it is time-consuming to require great effort, and can not have enough to meet the need technical problems such as use.Good effect is being arranged aspect cost efficiency, the energy conservation.
The utility model is simple to operate, and technical essential is grasped easily.Safeguard that with traditional frame tube clamps formula fence compares, economize on resources that assembling is safeguarded and can be had enough to meet the need and secondary uses, and saves trouble, saves time, and is safe and reliable, drop into low, the economic benefit height.
In sum, the utility model is a kind of can economizing on resources, and peace is torn open quick, saving of work and time, and safe and reliable, the assembling that can have enough to meet the need is repeatedly safeguarded fence.
Description of drawings
Fig. 1 is that the utility model assembling is safeguarded the fence front elevation view;
Fig. 2 is a lateral view of the present utility model;
Fig. 3 is a revolution fastener schematic diagram of the present utility model.
The specific embodiment
The utility model is described in further detail below in conjunction with the drawings and specific embodiments.
Referring to Fig. 1, Fig. 2 and Fig. 3, by the two ends specification be the vertical rod frame pipe 3 of 48 * 3.5mm and top, horizontal frame pipe 1 and bottom level frame pipe 6 that specification is 48 * 3.5mm and be in top, horizontal frame pipe 1 and bottom level frame pipe 6 between specification be the grid reinforcing bar 2 of φ 12 adopt that welding forms a full wafer safeguard fence 5, the bottom of bottom level frame pipe 6 adopts welding to be provided with the stay pipe 3 that specification is 48 * 3.5mm, and vertical rod frame pipe 3 adopts revolution fastener 4 to be connected between the fence 5 in adjacent safeguarding.Vertical rod frame pipe 3, top, horizontal frame pipe 1 and bottom level frame pipe 6 and middle grid reinforcing bar 2 usefulness screw-thread steels adopt yellow and red antirusting paint of meeting each other in vain to handle.Prevent the screw-thread steel corrosion and make eye-catching sign.After the acceptance(check) to be installed, can use.
It uses step to be:
1, arrange the position of determining the processing place according to construction main flat, it is smooth to carry out land clearing, and the place is adopted and is not less than C20, and the concrete that thickness is not less than 15cm hardens.
2, on-the-spot field survey is determined suitable processing place and is safeguarded the size of fence, draws and safeguards the fence construction drawing, and according to the down good various materials of drawing, guarantee that construction equipment and personnel put in place.
3, the contrast drawing carries out setting-out to safeguarding fence, and snap the line is indicated the position of vertical rod frame pipe 3.
4, vertical rod frame pipe 3 is installed one by one, is welded to connect by the top, horizontal frame pipe 1 and the bottom level frame pipe 6 of welding with 48 * 3.5mm.
5, the grid reinforcing bar 2 of φ 12 is installed one by one, and the grid reinforcing bar 2 of welding φ 12 makes and safeguards that fence forms firm system.
6, the fence of safeguarding in blocks is installed, is adopted revolution fastener 4 to be connected and fixed between the vertical rod frame pipe 3 of safeguarding fence 5 of sheet and sheet and the vertical rod frame pipe 3.
7, adopt and redly to meet each other in vain and yellow antirusting paint is made antirust processing and made eye-catching sign.
9, install after, can use after qualified by inspection.
Claims (4)
1. an assembling is safeguarded fence, it is characterized in that: vertical rod frame pipe (3) and top, horizontal frame pipe (1) and the bottom level frame pipe (6) by two ends and be in described top, horizontal frame pipe (1) and bottom level frame pipe (6) between grid reinforcing bar (2) be fixedly connected to form a full wafer safeguard fence (5), the bottom of described bottom level frame pipe (6) is provided with stay pipe (3), adopts fastener to be connected between the adjacent described vertical rod frame pipe (3) of safeguarding fence (5).
2. assembling according to claim 1 is safeguarded fence, it is characterized in that: the specification of described vertical rod frame pipe (3) is 48 * 3.5mm, the specification of described top, horizontal frame pipe (1) and bottom level frame pipe (6) is 48 * 3.5mm, the specification of described stay pipe (3) is 48 * 3.5mm, and the specification of described grid reinforcing bar (2) is φ 12.
3. assembling according to claim 1 and 2 is safeguarded fence, it is characterized in that: described fastener is revolution fastener (4).
4. assembling according to claim 1 and 2 is safeguarded fence, it is characterized in that: described vertical rod frame pipe (3) and described top, horizontal frame pipe (1) and bottom level frame pipe (6) and described grid reinforcing bar (2), stay pipe (3) adopt welding to form a full wafer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200615370U CN201953146U (en) | 2011-03-10 | 2011-03-10 | Assembly type maintenance fence |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200615370U CN201953146U (en) | 2011-03-10 | 2011-03-10 | Assembly type maintenance fence |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201953146U true CN201953146U (en) | 2011-08-31 |
Family
ID=44497265
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011200615370U Expired - Fee Related CN201953146U (en) | 2011-03-10 | 2011-03-10 | Assembly type maintenance fence |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201953146U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107023214A (en) * | 2017-06-09 | 2017-08-08 | 中建八局第三建设有限公司 | Can turnover type Fast Installation hoarding |
-
2011
- 2011-03-10 CN CN2011200615370U patent/CN201953146U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107023214A (en) * | 2017-06-09 | 2017-08-08 | 中建八局第三建设有限公司 | Can turnover type Fast Installation hoarding |
CN107023214B (en) * | 2017-06-09 | 2022-05-06 | 中建八局第三建设有限公司 | Can have enough to meet need formula and install tentatively enclosure fast |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101694110B (en) | Connecting structure of beam column nodes and construction method thereof | |
CN202370253U (en) | Assembly type single-row vertical rod machining shed for building construction site | |
CN204040464U (en) | A kind of slab form supporting construction | |
CN202416184U (en) | Construction device for formwork for longitudinal wet joint of box girder | |
CN103437283B (en) | A kind of hanging basket truss of energy rapid-assembling | |
CN201953146U (en) | Assembly type maintenance fence | |
CN212336672U (en) | I-steel overhanging bearing frame of basket pull rod for constructional engineering | |
CN203638063U (en) | Guardrail stand column device for erecting ship hatch coaming guardrail | |
CN203271096U (en) | Operating platform | |
CN102661035A (en) | Tool type wall connecting piece for exterior wall scaffold | |
CN112240098A (en) | Multipurpose template reinforcing structure | |
CN202157581U (en) | Foundation-pit limb shaping protection device | |
CN204139631U (en) | The guard rail of building site fast demountable | |
CN202209076U (en) | Field assembly-type maintenance fence | |
CN203856069U (en) | High-rise building steel structure | |
CN201952899U (en) | Beam column connecting node of detachable board house | |
CN203729852U (en) | Assembly type construction site door | |
CN201261947Y (en) | Assembly type escape way | |
CN104164889A (en) | Demountable tower crane foundation | |
CN204081468U (en) | A kind of shear-wall strengthening formwork structure | |
CN204081433U (en) | Steel structural roof liner profiled sheet construction Special-purpose hanger basket support | |
CN210917735U (en) | Supporting jig frame structure for large-span prestressed inhaul cable structure | |
CN203096729U (en) | Storage tank pile cap assembling type pouring platform | |
CN111519949A (en) | Convenient ann tears assembled steel construction reinforcing bar processing protection canopy open | |
CN202672694U (en) | Shaft construction circulation operating platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110831 Termination date: 20150310 |
|
EXPY | Termination of patent right or utility model |