CN201953083U - 一种防雨棚 - Google Patents

一种防雨棚 Download PDF

Info

Publication number
CN201953083U
CN201953083U CN2011200636038U CN201120063603U CN201953083U CN 201953083 U CN201953083 U CN 201953083U CN 2011200636038 U CN2011200636038 U CN 2011200636038U CN 201120063603 U CN201120063603 U CN 201120063603U CN 201953083 U CN201953083 U CN 201953083U
Authority
CN
China
Prior art keywords
rain
proof shelter
main body
proof
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200636038U
Other languages
English (en)
Inventor
朱艺锋
舒建辉
黄炳文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 25th Bureau Group Co Ltd
China Railway Urban Construction Group Co Ltd
Second Engineering Co Ltd of China Railway Urban Construction Group Co Ltd
Original Assignee
China Railway 25th Bureau Group Construction and Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 25th Bureau Group Construction and Installation Engineering Co Ltd filed Critical China Railway 25th Bureau Group Construction and Installation Engineering Co Ltd
Priority to CN2011200636038U priority Critical patent/CN201953083U/zh
Application granted granted Critical
Publication of CN201953083U publication Critical patent/CN201953083U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

本实用新型公开了一种防雨棚,与预制梁模板相连接,包括防雨棚立柱、防雨材料、防雨棚骨架,所述防雨棚立柱设置于所述预制梁模板的对拉柱上,所述防雨棚骨架包括骨架主体、滚轴支架、滚轴,所述骨架主体为由纵横交叉的若干钢管组成的钢架,所述骨架主体设置于所述防雨棚立柱上,所述滚轴支架固定连接于所述骨架主体的两端,所述滚轴设置于所述滚轴支架上,所述滚轴的端部设有摇柄,所述防雨材料卷设于所述滚轴的外表面。本实用新型结构简单,操作方便,可边浇注边防雨。

Description

一种防雨棚
技术领域
本实用新型涉及一种防雨棚,特别是涉及一种适用于预制梁的活动式防雨棚。
背景技术
目前,预制梁的防雨棚大多为固定式结构,即在预制梁模板浇注完成后在模板上方制作防雨棚,施工人员在防雨棚下施工。这种结构存在的缺陷是:跨度较大,高度较高,因此操作复杂,实用性差,制作过程较长,很难做到边浇筑预制梁边防雨。
实用新型内容
本实用新型要解决的技术问题是提供一种防雨棚,结构简单,操作方便,可边浇注边防雨。
为解决上述技术问题,本实用新型的技术方案是:
一种防雨棚,与预制梁模板相连接,包括防雨棚立柱、防雨材料、防雨棚骨架,
所述防雨棚立柱设置于所述预制梁模板的对拉柱上,
所述防雨棚骨架包括骨架主体、滚轴支架、滚轴,所述骨架主体为由纵横交叉的若干钢管组成的钢架,所述骨架主体设置于所述防雨棚立柱上,所述滚轴支架固定连接于所述骨架主体的两端,所述滚轴设置于所述滚轴支架上,所述滚轴的端部设有摇柄,
所述防雨材料卷设于所述滚轴的外表面。
作为改进,本实用新型还包括防倒挡板,所述防倒挡板设置于所述防雨棚立柱和所述预制梁模板的对拉柱之间。
优选地,本实用新型所述防雨材料为防雨油布。
由上可见,与现有技术相比,本实用新型有如下有益效果:
利用预制梁模板的对拉柱来制造骨架主体,结构比较简单,横向跨度较小,而且可以将整个防雨棚的高度尽量降低,这样施工人员可以在防雨棚的上面进行施工,操作简便,制作成本较低;防雨材料为活动式,可以通过滚动轴将防雨材料收放自如,根据施工进度控制防雨范围,既不影响混凝土龙门吊的装吊浇筑,也不影响防雨,实现边浇注边防雨,而且保证施工质量的同时也加快了施工进度。
附图说明
此处所说明的附图用来提供对本实用新型的进一步理解,构成本申请的一部分,并不构成对本实用新型的不当限定,在附图中:
图1为本实用新型实施例的结构示意图;
图2为本实用新型实施例另一角度的结构示意图;
图3为本实用新型实施例的使用状态图;
图4为图3另一角度的示意图。
具体实施方式
下面将结合附图以及具体实施例来详细说明本实用新型,在此本实用新型的示意性实施例以及说明用来解释本实用新型,但并不作为对本实用新型的限定。
如图1至图4所示为本实用新型所述的一种防雨棚的实施例,与预制梁模板5相连接,包括防雨棚立柱8、防雨棚骨架、防雨材料1,防雨棚立柱8设置于预制梁模板5的对拉柱51上,防雨棚骨架包括骨架主体2、滚轴支架3、滚轴4,骨架主体2为由纵横交叉的若干钢管组成的钢架,骨架主体2设置于防雨棚立柱8上,滚轴支架3固定连接于骨架主体2的两端,滚轴4设置于滚轴支架3上,滚轴4的端部设有摇柄6,防雨材料1卷设于滚轴4的外表面。
作为改进,本实施例还包括防倒挡板7,防倒挡板7设置于防雨棚立柱8和预制梁模板5的对拉柱51之间,这样可纵向固定骨架主体2以提高其稳定性。
优选地,在本实施例中,防雨材料1采用防雨油布,这样防雨效果较好。
其中,骨架主体2可采用轻钢结构型式,即由φ16圆钢和【10槽钢焊接而成,这样可保证其稳定性,吊装更简便安全;滚轴4可采用一根20圆钢制成,滚轴支架3可采用槽钢制成;防雨棚立柱8纵横跨度可根据模板对拉柱51的间距而设置,实际操作时,骨架主体2可采用分片式,可根据预制梁的长度来选取分片的长度及数量,例如骨架主体2采用纵向跨度约8m为一片,对于32m标准T型梁,可分为对称4片式(如图3所示为其中两片安装于T型梁上的结构示意图),而对于24m标准T型梁而言可分为3片式,不管分成几片,滚轴4均设置于位于最外侧的两片上,采用分片式可减少骨架的跨度,减少钢材的用量,因此重量较轻,门吊吊装更方便;为了不影响预制梁的浇筑施工进度,可利用预制梁模板对拉柱和对拉杆尽量将防雨棚高度降到最低,这样施工人员和设备在防雨棚上面施工。
以上对本实用新型实施例所提供的技术方案进行了详细介绍,本文中应用了具体个例对本实用新型实施例的原理以及实施方式进行了阐述,以上实施例的说明只适用于帮助理解本实用新型实施例的原理;同时,对于本领域的一般技术人员,依据本实用新型实施例,在具体实施方式以及应用范围上均会有改变之处,综上所述,本说明书内容不应理解为对本实用新型的限制。

Claims (3)

1.一种防雨棚,与预制梁模板相连接,其特征是:
包括防雨棚立柱、防雨棚骨架、防雨材料,
所述防雨棚立柱设置于所述预制梁模板的对拉柱上,
所述防雨棚骨架包括骨架主体、滚轴支架、滚轴,所述骨架主体为由纵横交叉的若干钢管组成的钢架,所述骨架主体设置于所述防雨棚立柱上,所述滚轴支架固定连接于所述骨架主体的两端,所述滚轴设置于所述滚轴支架上,所述滚轴的端部设有摇柄,
所述防雨材料卷设于所述滚轴的外表面。
2.根据权利要求1所述的防雨棚,其特征是:还包括防倒挡板,所述防倒挡板设置于所述防雨棚立柱和所述预制梁模板的对拉柱之间。
3.根据权利要求1所述的防雨棚,其特征是:所述防雨材料为防雨油布。
CN2011200636038U 2011-03-11 2011-03-11 一种防雨棚 Expired - Fee Related CN201953083U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200636038U CN201953083U (zh) 2011-03-11 2011-03-11 一种防雨棚

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200636038U CN201953083U (zh) 2011-03-11 2011-03-11 一种防雨棚

Publications (1)

Publication Number Publication Date
CN201953083U true CN201953083U (zh) 2011-08-31

Family

ID=44497202

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200636038U Expired - Fee Related CN201953083U (zh) 2011-03-11 2011-03-11 一种防雨棚

Country Status (1)

Country Link
CN (1) CN201953083U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105264154A (zh) * 2013-04-12 2016-01-20 Peri有限公司 防护油布卷
CN105401507A (zh) * 2015-11-24 2016-03-16 中国十七冶集团有限公司 一种雨天道路同步卷帘式雨布覆盖施工装置及施工方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105264154A (zh) * 2013-04-12 2016-01-20 Peri有限公司 防护油布卷
CN105264154B (zh) * 2013-04-12 2019-03-15 Peri有限公司 防护油布卷
CN105401507A (zh) * 2015-11-24 2016-03-16 中国十七冶集团有限公司 一种雨天道路同步卷帘式雨布覆盖施工装置及施工方法

Similar Documents

Publication Publication Date Title
CN201953083U (zh) 一种防雨棚
CN204474193U (zh) 一种定柱式旋臂起重机
CN202000265U (zh) 桥梁高墩混凝土施工模板
CN203610859U (zh) 筒节翻转平台
CN201990452U (zh) 高空作业升降机
CN207748760U (zh) 一种吊装大型排水管的桥式起重机
CN202787097U (zh) 一种可变化角度的挂篮纵梁旋转装置
CN206359210U (zh) 一种钢结构加工用稳定升降装置
CN201915632U (zh) 一种梁模板可调支托结构
CN212334721U (zh) 一体化填料溶气装置
CN205187695U (zh) 一种钢结构吊装起吊架
CN206940369U (zh) 一种坞壁液压维修平台
CN202967279U (zh) 气瓶直立移动装置
CN204151900U (zh) 一种梁柱钢模壳组合结构体系
CN202390763U (zh) 桥梁v型墩的混凝土结构模板支撑架
CN202194073U (zh) 大体积长悬臂盖梁施工装置
CN106437047A (zh) 一种用于厂房屋面板运输与安装的设备
CN205772937U (zh) 一种用于冷裱膜卷的转移装置
CN201553529U (zh) 钢管组合式沉箱模板吊装架
CN202672046U (zh) 组合式现浇箱梁移动支架
CN204455838U (zh) 一种用于存放钢桁梁桁片移动式存储平台
CN203668837U (zh) 桥梁转体用伸降式支座
CN202164543U (zh) 异型桥面大面砼振动梁
CN203171202U (zh) 一种工业圆筒炉辐射炉管的安装机械
CN211447807U (zh) 一种悬空大体积混凝土施工用支撑结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA RAILWAY 25TH BUREAU GROUP CO., LTD.

Effective date: 20120307

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20120307

Address after: 510600, No. 8, 5-7 West Gonghe Road, Guangzhou, Guangdong Province, Yuexiu District

Co-patentee after: CHINA RAILWAY 25TH BUREAU GROUP Co.,Ltd.

Patentee after: CONSTRUCTION INSTALLATION ENGINEERING CO., LTD. OF CHINA RAILWAY 25TH BUREAU Group

Address before: 510600, room 8, 511 Gonghe West Road, Guangdong, Guangzhou, Yuexiu District

Patentee before: Construction Installation Engineering Co., Ltd. of China Railway 25th Bureau Group

ASS Succession or assignment of patent right

Owner name: CHINA RAILWAY URBAN CONSTRUCTION GROUP CO., LTD. C

Free format text: FORMER OWNER: CHINA RAILWAY 25TH BUREAU GROUP CO., LTD.

Effective date: 20141205

C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee

Owner name: THE 2ND ENGINEERING CO., LTD. OF CHINA RAILWAY URB

Free format text: FORMER NAME: CONSTRUCTION INSTALLATION ENGINEERING CO., LTD. OF CHINA RAILWAY NO.25 BUREAU GROUP

CP01 Change in the name or title of a patent holder

Address after: 510600, No. 8, 5-7 West Gonghe Road, Guangzhou, Guangdong Province, Yuexiu District

Patentee after: China Railway Urban Construction Group Second Engineering Co.,Ltd.

Patentee after: CHINA RAILWAY 25TH BUREAU GROUP Co.,Ltd.

Address before: 510600, No. 8, 5-7 West Gonghe Road, Guangzhou, Guangdong Province, Yuexiu District

Patentee before: Construction Installation Engineering Co., Ltd. of China Railway 25th Bureau Group

Patentee before: CHINA RAILWAY 25TH BUREAU GROUP Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20141205

Address after: 510600, No. 8, 5-7 West Gonghe Road, Guangzhou, Guangdong Province, Yuexiu District

Patentee after: China Railway Urban Construction Group Second Engineering Co.,Ltd.

Patentee after: CHINA RAILWAY URBAN CONSTRUCTION GROUP Co.,Ltd.

Patentee after: CHINA RAILWAY 25TH BUREAU GROUP Co.,Ltd.

Address before: 510600, No. 8, 5-7 West Gonghe Road, Guangzhou, Guangdong Province, Yuexiu District

Patentee before: China Railway Urban Construction Group Second Engineering Co.,Ltd.

Patentee before: CHINA RAILWAY 25TH BUREAU GROUP Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110831

Termination date: 20170311

CF01 Termination of patent right due to non-payment of annual fee