CN201952095U - Shackle-free connected hanging bar - Google Patents

Shackle-free connected hanging bar Download PDF

Info

Publication number
CN201952095U
CN201952095U CN2011200014504U CN201120001450U CN201952095U CN 201952095 U CN201952095 U CN 201952095U CN 2011200014504 U CN2011200014504 U CN 2011200014504U CN 201120001450 U CN201120001450 U CN 201120001450U CN 201952095 U CN201952095 U CN 201952095U
Authority
CN
China
Prior art keywords
tubular type
main stress
type hanger
loop plane
shackle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200014504U
Other languages
Chinese (zh)
Inventor
张平
曹凯
于海涛
李宝明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
COSCO (DALIAN) SHIPYARD Co Ltd
Original Assignee
COSCO (DALIAN) SHIPYARD Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by COSCO (DALIAN) SHIPYARD Co Ltd filed Critical COSCO (DALIAN) SHIPYARD Co Ltd
Priority to CN2011200014504U priority Critical patent/CN201952095U/en
Application granted granted Critical
Publication of CN201952095U publication Critical patent/CN201952095U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a shackle-free connected hanging bar, which comprises a supporting beam (1), a main stressed beam (2), a main-beam end-part sealing plate (3), an outer-side rope-blocking reinforcing annular plate (4), an inner-side rope-blocking reinforcing annular plate (5), a half reinforcing annular plate (6), a reinforcing toggle plate (7), a pipe-type hanging-ear sealing plate (8), a pipe-type hanging-ear longitudinal vertical plate (9), a pipe-type hanging-ear main beam (10), a pipe-type hanging-ear transverse vertical plate (11), a main stressed-beam reinforcing vertical plate (12) and conveying hanging ears (13), wherein the conveying hanging ears (13) are installed at both sides of the supporting beam (1). In the shackle-free connected hanging bar disclosed by the utility model, a large shackle does not need to be used for connection; and the maximum width of a hanging and conveying module of the hanging bar is 25 meters, the hanging bar can be manufactured according to the different sizes of the modules, and the maximum carrying capacity is 900 tons. Through the design method, the contact surface of a steel-wire rope is greatly increased, a protecting action is performed for the steel-wire rope, and the service efficiency of the steel-wire rope is improved.

Description

Need not shackle and connect trapeze
Technical field
The utility model relates to Floating Production and stores emptying equipment ship (FPSO) and other heavy die block hoisting engineering fields, top, ocean engineering product deck, relates in particular to a kind of shackle connection trapeze ear that need not.
Background technology
Along with oil field, large-scale deep-sea, the world is found gradually, the world market increases gradually to FPSO ship demand, and build that tonnage is increasing to change 300,000 ton of 40 ton into by original 10 tons, the functional module tonnage also increases thereupon and reaches 500-2000 ton even more on the FPSO boat deck, this body structure of module is more weak but value is very expensive, so be absolutely necessary in order to guarantee that the large-scale trapeze of safety uses in the module installation process, most of large-scale trapezes all are to finish by shackle when being connected with steel rope now, when assembling, Current Collector Sleave is not easy to very much operation like this, used 4-6 only with general during handling FPSO ship model piece in the past, tonnage is 400,500 tons joining shackle is connected with former trapeze, original 900 trapeze forms are seen Fig. 1, use 4 500 tons of shackles at steel rope and trapeze connection location, because the shackle own wt reaches about 0.8 ton than big every, and oad is comparatively special, personnel and difficult operation when assembling, also need a large amount of manpowers, material resources cooperate, the significant wastage data, and use the back steel rope folding line can occur at the shackle connection location, reduce steel rope service life, so a kind ofly need not shackle to connect novel trapeze design imperative.
Summary of the invention
The purpose of this utility model provides and a kind ofly need not large-scale shackle and connect 900 tons of trapezes, and improves the steel rope protective capability, prolongs its service life, reduces Current Collector Sleave assembling difficulty, and the shackle that need not that improves lifting efficient connects trapeze.
The technical scheme that the utility model is adopted for achieving the above object is: a kind of shackle connection trapeze that need not, by support beam (1), main stress beam (2), girder end shrouding (3), outside resistance rope enforced loop plane (4), inboard resistance rope enforced loop plane (5), the strong ring flat-plate of false add (6), deep bracket (7), tubular type hanger shrouding (8), the vertical riser of tubular type hanger (9), tubular type hanger girder (10), the horizontal riser of tubular type hanger (11), the main stress beam is strengthened riser (12), transportation hanger (13) is formed, described transportation hanger (13) is installed in the both sides of support beam (1), described outside resistance rope enforced loop plane (4), inboard resistance rope enforced loop plane (5) and the strong ring flat-plate of false add (6) are installed on the main stress beam (2), described main stress beam is strengthened riser (12) and is installed in the main stress beam (2), vertical riser of described tubular type hanger (9) and the horizontal riser of tubular type hanger (11) are installed in the tubular type hanger girder (10), described deep bracket (7) is installed on the outside, end resistance rope enforced loop plane (4) and the main stress beam (2), and described tubular type hanger shrouding (8) is installed in the two ends of tubular type hanger girder (10).
Described transportation hanger (13) is installed in each one at distance center line 15m place, support beam (1) both sides.
Described outside resistance rope enforced loop plane (4), inboard resistance rope enforced loop plane (5) and the strong ring flat-plate of false add (6) are installed in respectively apart from main stress beam (2) end 215mm, 425mm, 1945mm millimeter place.
Described outside resistance rope enforced loop plane (4) and inboard resistance rope enforced loop plane (5) are formed groove structure.
Described main stress beam (2) is strengthened riser (12) with the main stress beam and is offered and the identical circular hole of tubular type hanger girder (10) external diameter apart from 1020mm above-below direction center, end.
The utility model need not shackle and connects trapeze, in this trapeze use, need not to use large-scale shackle to connect; This trapeze handling module maximum width is 25 meters, can make according to the module size difference, and maximum load-carrying capacity is 900 tons; This trapeze and steel rope connection location all adopt the tubular design method, the top steel rope is connected on the tubular type hanger girder 10, bottom steel rope connection location is set on the main stress beam 2, this kind method of designing is extremely novel, greatly increase the steel rope contact surface, steel rope is played a protective role, and improve the steel rope service efficiency; This trapeze just can satisfy 3 kinds of hangers and use highly versatile apart from the module lifting of different size; This trapeze is the instrument of a kind of FPSO of aiming at ship top lifting modular design; need not shackle in use connects; reduced Current Collector Sleave assembling difficulty; increase the steel rope contact surface simultaneously; steel rope is played a protective role; prolong steel rope service life, practicality is extremely strong, has splendid promotional value at boats and ships and ocean engineering construction applications.
Description of drawings
The utility model is described in further detail below in conjunction with the drawings and specific embodiments.
Fig. 1 is that 900 tons of trapezes of prior art use scheme drawing.
Fig. 2 is that the utility model need not shackle connection trapeze structural representation.
Fig. 3 is Fig. 2 A place partial enlarged drawing.
Fig. 4 is that Fig. 3 A-A is to cutaway view.
Fig. 5 is that Fig. 3 B-B is to cutaway view.
Fig. 6 is that Fig. 5 C-C is to cutaway view.
Fig. 7 is that the utility model need not shackle connection trapeze use scheme drawing.
Among the figure: 1, support beam; 2, main stress beam; 3, girder end shrouding; 4, outside resistance rope enforced loop plane; 5, inboard resistance rope enforced loop plane; 6, the strong ring flat-plate of false add; 7, deep bracket; 8, tubular type hanger shrouding; 9, the vertical riser of tubular type hanger; 10, tubular type hanger girder; 11, the horizontal riser of tubular type hanger; 12, the main stress beam is strengthened riser; 13, transportation hanger.
The specific embodiment
As Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6 and shown in Figure 7, the utility model need not shackle and connects trapeze, by support beam 1, main stress beam 2, girder end shrouding 3, outside resistance rope enforced loop plane 4, inboard resistance rope enforced loop plane 5, the strong ring flat-plate 6 of false add, deep bracket 7, tubular type hanger shrouding 8, the vertical riser 9 of tubular type hanger, tubular type hanger girder 10, the horizontal riser 11 of tubular type hanger, the main stress beam is strengthened riser 12, transportation hanger 13 is formed, transportation hanger 13 is installed in the both sides of support beam 1, outside resistance rope enforced loop plane 4, inboard resistance rope enforced loop plane 5 and the strong ring flat-plate 6 of false add are installed on the main stress beam 2, the main stress beam is strengthened riser 12 and is installed in the main stress beam 2, vertical riser 9 of tubular type hanger and the horizontal riser 11 of tubular type hanger are installed in the tubular type hanger girder 10, deep bracket 7 is installed on the outside, end resistance rope enforced loop plane 4 and the main stress beam 2, tubular type hanger shrouding 8 is installed in the two ends of tubular type hanger girder 10, transportation hanger 13 is installed in each one at distance center line 15m place, support beam 1 both sides, outside resistance rope enforced loop plane 4, inboard resistance rope enforced loop plane 5 and the strong ring flat-plate 6 of false add are installed in respectively apart from main stress beam 2 end 215mm, 425mm, 1945mm millimeter place, outside resistance rope enforced loop plane 4 and inboard resistance rope enforced loop plane 5 are formed groove structure, and main stress beam 2 is strengthened riser 12 with the main stress beam and offered and the identical circular hole of tubular type hanger girder 10 external diameters apart from 1020mm above-below direction center, end.
The utility model need not mainly to be made up of 3 segmentations when shackle connects the trapeze making: segmentation one mainly is made up of support beam 1 and transportation hanger 13, sectional making quantity is 1, main 25mm thickness, the EH36 material plate of using rolls and forms, and use opening one side cut welding process to be made into closed cylinder, total length is 19680mm, will transport hanger 13 then and be welded on about support beam 1 distance center line 15m position each one; Segmentation two mainly is made up of tubular type hanger shrouding 8, the vertical riser 9 of tubular type hanger, tubular type hanger girder 10, horizontal riser 11 structures of tubular type hanger, segmentation two production quantities are 2, now utilize the 30mm thickness steel plate to be rolled into diameter and be about 1756mm tubular type hanger girder 10 for 670mm, then vertical riser 9 of tubular type hanger and horizontal riser 11 members of tubular type hanger are welded on hanger girder 10 inner assigned addresses, all firm welding is in bulk when tubular type hanger shrouding 8 grades are always organized; Segmentation three is mainly by main stress beam 2, girder end shrouding 3, outside resistance rope enforced loop plane 4, inboard resistance rope enforced loop plane 5, the strong ring flat-plate 6 of false add, deep bracket 7, the main stress beam is strengthened riser 12 and is formed, segmentation three production quantities are 2, main stress beam 2 is mainly rolled by the 40mm plate iron and forms, length is 3010mm, the main stress beam is strengthened riser 12 its inner assigned addresses of welding, again with outside resistance rope enforced loop plane 4, inboard resistance rope enforced loop plane 5, the strong ring flat-plate 6 of false add, be welded on apart from tube end 215mm, 425mm, three positions of 1945mm millimeter, outside resistance rope enforced loop plane 4,5 two members of inboard resistance rope enforced loop plane are formed a groove structure, connecting the bottom steel rope uses, and then an other cover groove structure is welded in distance 11400mm position, same end, with resistance rope enforced loop plane 4 outside deep bracket 7 and the end and 2 welding of main stress beam, in bulk when girder end shrouding 3 is always organized at last; Need not shackle connection trapeze always organizes: at first offer and the identical circular hole of tubular type hanger girder 10 external diameters apart from 1020mm above-below direction center, end at main stress beam 2 and main stress beam reinforcement riser 12, segmentation one inside is inserted in segmentation two guarantee that its center is consistent with main stress beam 2 centers of circle, and with two segmentation firm welding, secondly tubular type hanger shrouding 8 is welded to tubular type hanger girder 10 two ends, at this moment segmentation two and segmentation three have been combined into an integral structure, organize two altogether, two integral structures are being docked with segmentation one two ends respectively, open the cut firm welding, with girder end shrouding 3 and main stress beam 2 and deep bracket 7 firm welding, whole trapeze is made and is finished at last.
The concrete occupation mode of this trapeze, when this trapeze uses the top steel rope directly is enclosed within on 4 tubular type hanger girders, the bottom steel rope directly is enclosed within outside resistance rope enforced loop plane 4, inboard resistance rope enforced loop plane 5 forms in the groove structure, trapeze amounts to about 4 cover groove structures each 2, and each selects one of them pairing to use; The utility model is the instrument of a kind of FPSO of aiming at ship top lifting modular design; need not shackle in use connects; reduced Current Collector Sleave assembling difficulty; increase the steel rope contact surface simultaneously; steel rope is played a protective role; prolong steel rope service life, practicality is extremely strong, has splendid promotional value at boats and ships and ocean engineering construction applications.

Claims (5)

1. one kind need not shackle connection trapeze, it is characterized in that: by support beam (1), main stress beam (2), girder end shrouding (3), outside resistance rope enforced loop plane (4), inboard resistance rope enforced loop plane (5), the strong ring flat-plate of false add (6), deep bracket (7), tubular type hanger shrouding (8), the vertical riser of tubular type hanger (9), tubular type hanger girder (10), the horizontal riser of tubular type hanger (11), the main stress beam is strengthened riser (12), transportation hanger (13) is formed, described transportation hanger (13) is installed in the both sides of support beam (1), described outside resistance rope enforced loop plane (4), inboard resistance rope enforced loop plane (5) and the strong ring flat-plate of false add (6) are installed on the main stress beam (2), described main stress beam is strengthened riser (12) and is installed in the main stress beam (2), vertical riser of described tubular type hanger (9) and the horizontal riser of tubular type hanger (11) are installed in the tubular type hanger girder (10), described deep bracket (7) is installed on the outside, end resistance rope enforced loop plane (4) and the main stress beam (2), and described tubular type hanger shrouding (8) is installed in the two ends of tubular type hanger girder (10).
2. a kind of shackle connection trapeze that need not according to claim 1, it is characterized in that: described transportation hanger (13) is installed in each one at distance center line 15m place, support beam (1) both sides.
3. according to claim 1ly a kind ofly need not shackle and connect trapeze, it is characterized in that: described outside resistance rope enforced loop plane (4), inboard resistance rope enforced loop plane (5) and the strong ring flat-plate of false add (6) are installed in respectively apart from main stress beam (2) end 215mm, 425mm, 1945mm millimeter place.
4. according to claim 1 or 3 described a kind of shackle connection trapezes that need not, it is characterized in that: described outside resistance rope enforced loop plane (4) and the inboard enforced loop plane (5) of restricting that hinders are formed groove structure.
5. a kind of shackle connection trapeze that need not according to claim 1, it is characterized in that: described main stress beam (2) is strengthened riser (12) with the main stress beam and is offered and the identical circular hole of tubular type hanger girder (10) external diameter apart from 1020mm above-below direction center, end.
CN2011200014504U 2011-01-05 2011-01-05 Shackle-free connected hanging bar Expired - Fee Related CN201952095U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200014504U CN201952095U (en) 2011-01-05 2011-01-05 Shackle-free connected hanging bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200014504U CN201952095U (en) 2011-01-05 2011-01-05 Shackle-free connected hanging bar

Publications (1)

Publication Number Publication Date
CN201952095U true CN201952095U (en) 2011-08-31

Family

ID=44496217

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200014504U Expired - Fee Related CN201952095U (en) 2011-01-05 2011-01-05 Shackle-free connected hanging bar

Country Status (1)

Country Link
CN (1) CN201952095U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102092628A (en) * 2011-01-05 2011-06-15 大连中远船务工程有限公司 Hanging bar without shackle connection

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102092628A (en) * 2011-01-05 2011-06-15 大连中远船务工程有限公司 Hanging bar without shackle connection
CN102092628B (en) * 2011-01-05 2013-05-01 大连中远船务工程有限公司 Hanging bar without shackle connection

Similar Documents

Publication Publication Date Title
CN101638204B (en) Multifunctional hanging bar
CN109823467B (en) Orange ship warehouse deck block hoisting process
CN205892509U (en) Boats and ships superstructure segmentation turnover device
CN102328727B (en) Segmenting methods of chassis of heavy oceaneering crane of deepwater pipe-lay crane vessel
CN108455451B (en) A kind of 600 tons of gantry cranes hold the method for hanging installation superelevation flare tower
CN204775859U (en) A support device for crane wire rope wire rope handling
CN201952095U (en) Shackle-free connected hanging bar
CN103072899A (en) Hoisting technology for ultra-large type cylinder block
CN106976530A (en) Semisubmersible platform
CN211815671U (en) Novel aluminium system helicopter platform structure
CN102092628B (en) Hanging bar without shackle connection
CN208360457U (en) A kind of container salvaging recycling frame
CN103883156A (en) Multidirectional yoke plate for tower assembling with derricks in mountainous area
CN210438256U (en) 80 ton modular unit hangs row
CN110271946B (en) 80 ton module unit hangs row
CN203048399U (en) Special lifting bracket for lifting drilling modules of deepwater drilling ship
CN203903209U (en) Movable type container and washboard thereof
CN206606918U (en) A kind of boat segmental is from tire and the T-shaped suspension ring and its mounting structure of total group lifting
CN103058046A (en) Deepwater drilling ship drilling module lifting-dedicated hanger
CN204529093U (en) Nothing in the lifting of drilling ship life building unloads button hanging beam
CN202180930U (en) Combined rudder hanging arm for supporting rudder
CN104671121A (en) Marine truss-type jib
CN110924321A (en) Novel aluminium system helicopter platform structure
CN217676311U (en) Novel support rod for hoisting marine heavy parts
CN201534745U (en) Multifunctional hoisting bar

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110831

Termination date: 20140105