CN102328727B - Segmenting methods of chassis of heavy oceaneering crane of deepwater pipe-lay crane vessel - Google Patents
Segmenting methods of chassis of heavy oceaneering crane of deepwater pipe-lay crane vessel Download PDFInfo
- Publication number
- CN102328727B CN102328727B CN201110144786.0A CN201110144786A CN102328727B CN 102328727 B CN102328727 B CN 102328727B CN 201110144786 A CN201110144786 A CN 201110144786A CN 102328727 B CN102328727 B CN 102328727B
- Authority
- CN
- China
- Prior art keywords
- deck
- segmentation
- base
- tub
- platform
- Prior art date
Links
- 281000050307 Oceaneering International companies 0.000 title abstract 2
- 239000003351 stiffeners Substances 0.000 claims abstract description 16
- 230000011218 segmentation Effects 0.000 claims description 51
- 239000011901 water Substances 0.000 claims description 10
- 238000010276 construction Methods 0.000 claims description 8
- 238000000465 moulding Methods 0.000 claims description 3
- 238000009434 installation Methods 0.000 abstract description 3
- 238000000034 methods Methods 0.000 description 4
- 280000462449 B Platform companies 0.000 description 3
- 238000010586 diagrams Methods 0.000 description 3
- 239000000463 materials Substances 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000011257 shell materials Substances 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 241000272168 Laridae Species 0.000 description 1
- 238000005516 engineering processes Methods 0.000 description 1
- 239000010410 layers Substances 0.000 description 1
- 238000005303 weighing Methods 0.000 description 1
Abstract
Description
Technical field
The present invention relates to a kind of heavy sea crane base segmentation method of deep water pipe laying crane ship, specifically a kind of to precision control well, the vertical stiffener of cylindrical base do not disconnect, when guaranteeing itself intensity, can also effectively realize handling subsection, reduce the heavy sea crane base segmented mode of the deep water pipe laying crane ship that stands up difficulty.
Background technology
On large-scale deep water pipe laying crane ship, build at present the heavy sea crane base of 813.20 tons of weighing also do not have can reference technique, due to bulky, base out of roundness suitable for reading requires high, can not adopt traditional integral installation method; If disassemble rear assembling completely, work capacity is too large, and the assembly precision of various piece can not guarantee, affects total quality.
Summary of the invention
Main task of the present invention is to provide a kind of heavy sea crane base segmentation method of deep water pipe laying crane ship, specifically a kind of precision is controlled, can also effectively guarantee well the heavy sea crane base of the deep water pipe laying crane ship that base intensity is not damaged divides segment process.
In order to solve above technical matters, the segmentation method of the heavy sea crane base of a kind of deep water pipe laying crane ship of the present invention, its base bottom is arranged on above the platform deck of 9100mm of hull, top is respectively through the A deck of main deck and the 20300mm of 14000mm, it is characterized in that: by this base segment section from described platform deck to main deck is divided into, be designated as 301B; Segment section from this main deck to this A deck being, is designated as 301A; Above this 301A segmentation, it is TUB segmentation.
Also the 301A section of base and 301B section can be divided into 2 segmentations in left and right, dividing range is the 200mm place apart from hull center line face at larboard, the middle part of larboard one side and bottom are respectively 301AC and 301BC section, and the middle part of starboard one side and bottom are respectively 301AD and 301BD section; 301A section be above TUB section still as an independently segmentation, no longer carry out segmentation, and this TUB section is built after the dock of the left and right segmentation of lift-launch 301A, 301B closes up.
Another program is: a kind of segmentation method of heavy sea crane base of deep water pipe laying crane ship, its base bottom is arranged on above the platform deck of 9100mm of hull, top is respectively through the A deck of main deck and the 20300mm of 14000mm, it is characterized in that: this base is drawn and is longitudinally divided into 2 segmentations in left and right, dividing range is the 200mm place apart from hull center line face at larboard, larboard one side is left side segmentation from this platform deck to this A deck, is designated as 301C; Starboard one side is right side segmentation from this platform deck to this A deck, is designated as 301D; The TUB section that to be positioned at part above A deck be this base, still as an independently segmentation, no longer carry out segmentation, and this TUB section is built after the dock that carries the left and right segmentation of 301A, 301B closes up.
The invention has the advantages that: adopt above segmentation, to precision control well, the vertical stiffener of cylindrical base do not disconnect, and when guaranteeing itself intensity, can also effectively realize handling subsection, reduce and stand up difficulty, improve installation effectiveness, guaranteed total quality and precision.
Accompanying drawing explanation
Fig. 1 is the perspective view of the upright state of base of the present invention;
Fig. 2 is the perspective view of base handstand state of the present invention;
Fig. 3 is the present invention's the first scheme segmented mode schematic diagram;
Fig. 4 is alternative plan segmented mode schematic diagram of the present invention;
Fig. 5 is third party's case segmented mode schematic diagram of the present invention.
The specific embodiment
Referring to Fig. 1-Fig. 5, the present invention plans to build heavy sea crane base and is positioned at hull afterbody, and hoisting crane own wt is 4000 tons.During stern fixed mode, radius of turn is 43m, and load-carrying ability is 4000 tons; During full circle swinging pattern, radius of turn 33m, load-carrying ability is 3500 tons.
Planning to build hoist base is that diameter is the cylinder type of 24.3m, and it is highly 13.40m, and cylindrical shell top is that wall thickness is that 45mm material is the steel plate of EH36-Z35, and bottom is the steel plate that thickness of slab 30mm and 45mm material are EH36.Cylinder body bottom is welded on the platform 14 of baseline 9100mm, and the barrel wall that 2.2m is high is still arranged on A deck 2 at its top.
Due to 813.20 tons of hoist base structure gross weights of the present invention, when dock carries, safe load-carrying ability can reach 700 tons, for guaranteeing safe construction, the base of cylinder type must be carried out to sectional construction, this segmentation should guarantee precision, guarantees that again the intensity of cylinder self is unaffected, also will consider technique and lifting while building.It is the main and normal mode combining of building that the build process of whole cylinder type base of the present invention has been defined as counter making.
Understructure of the present invention is as depicted in figs. 1 and 2: base radius of turn is 33m, and take main deck 1 and A deck 2 is the end, is divided into three layers.Every one deck is equipped with deck base plate 3 in its bottom, the equidistant reinforced rib 4 that is provided with on deck base plate 3, and be equipped with crossbeam 5 at the horizontal direction of deck base plate 3, on crossbeam 5, vertically weld transcerse bulkhead 6; Longitudinal direction at deck base plate 3 is laid longeron 7, is vertically welded with longitudinal bulkhead 8 on longeron 7.
Outer at above-mentioned base radius is established stiffener 9 straight up, and at stiffener upper berth barrel plate 10, at base top hoop, has ring stiffener 11.
For main deck 1 can connect, on the cylinder type base on main deck 1 top, have bottom, arch ,Gong hole, hole and lay one deck pipe laying slideway 13.
During fabrication, two schemes are proposed:
The first scheme, as shown in Figure 3: by cylindrical shell segmentation by carrying out up and down segmentation division, from 9100mm A/B platform deck to 14000mm A/B(main deck 1) be segment section, be designated as 301B section; From 14000mm A/B main deck to 20300mmA/B(A deck 2) be segment section, be designated as 301A section.Part more than 301A section is TUB section, and TUB section is also as an independently segmentation, and it is built after closing up in 301A, the lift-launch of 301B section dock, sees Fig. 3.Another pipe laying slideway structure, also as a segmentation, is finally built.
The advantage of this scheme is that 301A section is done as a whole construction, and precision is controlled can be better, and in addition, its height dimension drops to 6.3m, and handling and sectional turn-over are convenient.Shortcoming is that vertical stiffener 9 has been disconnected at segmentation seam place.
Alternative plan, as shown in Figure 4: tube structure is carried out to segmentation division by left and right, from 9100mmA/B platform deck to 20300mm A/B(A deck 2) tube structure be divided into left and right 2 segmentations, dividing range is the 200mm place apart from hull center line face at larboard, larboard one side is 301C section, and starboard one side is 301D section.The TUB section of more than 2 part in A deck is identical with the first scheme.
This scheme advantage is that vertical stiffener 9 does not disconnect, and shortcoming is handling subsection, stand up and increased difficulty.
One of above two scheme are that upper and lower segmentation, one are left and right segmentations, and it has limitation, and impact is built.Finally, the first two scheme is merged, compromise and the 3rd scheme, as shown in Figure 5:
Be mainly base in the segmentation of carrying out with A deck 2 and 1 two basal planes of main deck, its division step is as follows:
By the lower segment section 301B section of the 14000mmA/B main deck of the tube structure shown in Fig. 31 to 9100A/B platform deck, be divided into 2 segmentations in left and right, its dividing range is at larboard apart from hull center line face 200mm place, and larboard one side is 301BC section, and starboard one side is 301BD section.
By the 14000mmA/B of the tube structure shown in Fig. 3 (main deck 1) to 20300mmA/B(A deck 2) upper segment section 301A section, be divided into equally 2 segmentations in left and right, its dividing range is at larboard apart from hull center line face 200mm place, and larboard one side is 301AC section, and starboard one side is 301AD section.
301AC section and the part above 301AD section, 20300mmA/B(A deck 2) above part is as a TUB section independently, no longer divides.
This scheme can be take 4 segmentations respectively the main deck 1 of 14000mm and the A deck 2 of 20300mm as basal plane construction, then two of the left side sections of 301BC sections and 301AC are first assembled, utilize the vertical stiffener structure of hoist base self as template barrel plate 9 in bulk, after standing up, be lifted on hull platform, then two of assembled the right segmentation 301BD sections and 301AD section, after standing up, be lifted on hull platform, then left and right two parts are merged as cylindric; Finally, on the cylindric base of moulding, take A deck 2 as bottom, accurately locate vertical stiffener, take vertical stiffener as template TUB segmentation in bulk barrel plate, complete TUB section and build.
This segmentation method had both solved builds choosing of basal plane, saved the material of extra template, guarantee the intensity of base, solved again the difficult problem of standing up difficulty, lifting difficulty, easily causing the distortion of base out of roundness, effectively realized the accurate construction of manufacturing the segmentation of goliath base.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110144786.0A CN102328727B (en) | 2011-06-01 | 2011-06-01 | Segmenting methods of chassis of heavy oceaneering crane of deepwater pipe-lay crane vessel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110144786.0A CN102328727B (en) | 2011-06-01 | 2011-06-01 | Segmenting methods of chassis of heavy oceaneering crane of deepwater pipe-lay crane vessel |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102328727A CN102328727A (en) | 2012-01-25 |
CN102328727B true CN102328727B (en) | 2014-03-12 |
Family
ID=45480752
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110144786.0A CN102328727B (en) | 2011-06-01 | 2011-06-01 | Segmenting methods of chassis of heavy oceaneering crane of deepwater pipe-lay crane vessel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102328727B (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104476133B (en) * | 2014-11-28 | 2016-09-14 | 南通润力机械制造有限公司 | A kind of by the manufacture method of the self-unloading boom base of nine fluid motor-driven |
CN104495641B (en) * | 2014-11-28 | 2016-10-05 | 南通润力机械制造有限公司 | A kind of by the processing technology of the self-unloading boom base of nine fluid motor-driven |
CN104439974B (en) * | 2014-11-28 | 2016-10-05 | 南通润力机械制造有限公司 | A kind of by the process for machining of the self-unloading boom base of nine fluid motor-driven |
CN106184617B (en) * | 2016-07-11 | 2018-03-02 | 中国葛洲坝集团机械船舶有限公司 | A kind of installation method of support cylinder |
CN106564819B (en) * | 2016-11-02 | 2018-07-10 | 泰州三福船舶工程有限公司 | A kind of heavy loop wheel machine peculiar to vessel and underwater mounting process |
CN108791700A (en) * | 2018-04-27 | 2018-11-13 | 广船国际有限公司 | A kind of wall pier location segment method of construction |
CN110525576A (en) * | 2019-08-26 | 2019-12-03 | 芜湖造船厂有限公司 | A kind of ship deck base construction and ship deck base construction installation method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002046691A (en) * | 2000-08-08 | 2002-02-12 | Japan Hamuwaaji Kk | Steering engine installation method and rotary vane type steering engine |
CN1884001A (en) * | 2006-06-22 | 2006-12-27 | 上海公茂起重设备有限公司 | Marine bulk cargo transferring system ship |
CN101844604A (en) * | 2009-03-24 | 2010-09-29 | 上海外高桥造船有限公司 | Integral hoisting and positioning method for pipe frame structure |
CN101844605A (en) * | 2010-05-31 | 2010-09-29 | 南通中远船务工程有限公司 | Method of manufacturing technology of ultra-deep large cylinder-shaped drilling platform main hull |
-
2011
- 2011-06-01 CN CN201110144786.0A patent/CN102328727B/en not_active IP Right Cessation
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002046691A (en) * | 2000-08-08 | 2002-02-12 | Japan Hamuwaaji Kk | Steering engine installation method and rotary vane type steering engine |
CN1884001A (en) * | 2006-06-22 | 2006-12-27 | 上海公茂起重设备有限公司 | Marine bulk cargo transferring system ship |
CN101844604A (en) * | 2009-03-24 | 2010-09-29 | 上海外高桥造船有限公司 | Integral hoisting and positioning method for pipe frame structure |
CN101844605A (en) * | 2010-05-31 | 2010-09-29 | 南通中远船务工程有限公司 | Method of manufacturing technology of ultra-deep large cylinder-shaped drilling platform main hull |
Also Published As
Publication number | Publication date |
---|---|
CN102328727A (en) | 2012-01-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2009229435B2 (en) | Liquid storing and offloading device and drilling and production installations on the sea based thereon | |
CN102849185B (en) | Pile leg installation method for self-elevating drilling platform | |
CN101328746B (en) | Steel structure high altitude mounting method | |
CN103332611B (en) | The method for making of crane arm support | |
CN105401732B (en) | A kind of assemble method of nuclear power station large-sized steel construction module | |
US10087052B2 (en) | Overhead crane and assembly of at least two overhead cranes | |
CN101967886B (en) | Assembly and installation methods of steel containment vessel of nuclear power station | |
CN204456570U (en) | A kind of Dome roof tank net shell of steel mixed type | |
CN102602712B (en) | Method for shipping of segments of steel box girders by rolling | |
CN102490003B (en) | Method for installing telescopic full-rotating rudder propeller device | |
CN203638060U (en) | Bulkhead type lifting scaffold tooling | |
CN101362505A (en) | Production technology of hatch coaming and hatch cover | |
CN201825671U (en) | Hoisting trolley for track plate | |
CN101117795A (en) | Mounting method for steel case basket arch single-frame segment | |
WO2019019459A1 (en) | Device for transporting ship superstructure as a whole | |
CN100581976C (en) | Trestle crane barge final assembly technique | |
CN103287555B (en) | A kind of movable hydraulic pressure docking block and using method thereof | |
CN104609300B (en) | Railway structure of 10000-ton movable portal crane | |
CN201857618U (en) | Floating guide platform and steel casing supported drilling platform deepwater pile foundation | |
CN201809030U (en) | Lifting appliance of double gantry cranes for lifting large-scale workpieces | |
CN101987651B (en) | Assembling method and assembling bracket of total segments of small ship | |
CN104875847B (en) | A kind of Quick carrying method of container ship centre transverse bulkhead | |
CN101337574B (en) | Mounting method of large ship stern-door transmission system | |
CN106335603A (en) | Method for assembling corrugated bulkhead block | |
CN204775829U (en) | A protect apart from roof beam for container ship transverse bulkhead carries on fast |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140312 Termination date: 20160601 |