CN201922025U - Cooling device of storage battery electrode group cast welding machine - Google Patents

Cooling device of storage battery electrode group cast welding machine Download PDF

Info

Publication number
CN201922025U
CN201922025U CN2011200072228U CN201120007222U CN201922025U CN 201922025 U CN201922025 U CN 201922025U CN 2011200072228 U CN2011200072228 U CN 2011200072228U CN 201120007222 U CN201120007222 U CN 201120007222U CN 201922025 U CN201922025 U CN 201922025U
Authority
CN
China
Prior art keywords
cooling
water
cooling bath
tank
welding machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200072228U
Other languages
Chinese (zh)
Inventor
张涛
石月明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Changxin Roebert automation equipment Co., Ltd.
Original Assignee
CHANGXING OUDESHEN MACHINERY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGXING OUDESHEN MACHINERY Co Ltd filed Critical CHANGXING OUDESHEN MACHINERY Co Ltd
Priority to CN2011200072228U priority Critical patent/CN201922025U/en
Application granted granted Critical
Publication of CN201922025U publication Critical patent/CN201922025U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Molds, Cores, And Manufacturing Methods Thereof (AREA)

Abstract

The utility model discloses a cooling device of a storage battery electrode group cast welding machine, which comprises a cooling water tank arranged below an electrode group die. The cooling water tank comprises an outer cooling tank and an inner cooling tank arranged in the outer cooling tank, the upper edge of the inner cooling tank is higher than that of the outer cooling tank, the inner cooling tank is connected with a water inlet pipe to realize continuous water supply, and the outer cooling tank is connected with a water outlet pipe to realize continuous water drainage. The cooling water tank structurally comprises an inner layer and an outer layer, the inner cooling tank is higher than the outer cooling tank, and the water inlet pipe of the inner cooling tank pumps water continuously via a water pump, so that the inner cooling tank always keeps a water overflowing state. Compared with a traditional cooling system, the cooling system has the advantages of simplicity, practicality, safety, reliability and capability of reducing the cost of the die, is high in cooling effect, realizes recycling of cooling water, and seldom affects environments.

Description

Accumulator pole group cast welding machine cooling device
Technical field
The utility model relates to the accumulator pole group welding equipment.
Background technology
In the battery automated production equipment, accumulator pole group needs to cool off after welding is finished, so that the carrying out of next process.As application number is that 200910154185.0 Chinese invention patent applies for and disclosed a kind of polar group welder of battery on May 12nd, 2010, wherein cooling device is made up of the cooling tube and the magnetic valve of pressure in one, can be in the cooling tube by air or liquid cools (also available gas-liquid spraying cooling), the working time of solenoid control cooling tube.But this cooling device, cool time is long, and cooled liquid easily collecting not, and working environment is worsened.
The utility model content
Technical problem to be solved in the utility model just provides a kind of cooling effectiveness height, the accumulator pole group cast welding machine cooling device little to ambient influnence.
For solving the problems of the technologies described above, the utility model adopts following technical scheme: accumulator pole group cast welding machine cooling device, it is characterized in that: comprise the bosh of being located at utmost point group mould below, described bosh comprises outer cooling bath and is located at the interior interior cooling bath of outer cooling bath, the cooling bath upper edge is higher than outer cooling bath upper edge in described, cooling bath connects the water inlet pipe continuous water supply in described, and described outer cooling bath connects the outlet pipe continuous drainage.
As preferably, described water inlet pipe and outlet pipe are connected with same water tank, and the described water tank water surface is lower than described bosh bottom surface, and described water inlet pipe is provided with water pump.Water outlet is flowed out naturally, and water inlet pumps into by water pump, forms circulation.
Improved, the water inlet end of described water inlet pipe is positioned at the cooling bath bottom, and the water side of described outlet pipe is positioned at the bottom of outer cooling bath.
Preferably, described bosh is located on the bosh support, and described bosh support lower end is fixed on the cylinder.By moving mold cools down on the cold groove that anhydrates of air cylinder driven.
Improved, described utmost point group mould below is provided with a groove, and the groove outer edge surrounds the cooling surface of mould, and described interior cooling bath upper edge is positioned at inboard one centimetre of groove outer edge.Good cooling results.
Outer double-layer structure design in the double-deck bosh of core component of the present utility model adopts, wherein interior cooling bath is higher than outer cooling bath, interior cooling bath water inlet pipe is by not stop pumping of water pump water, cooling bath keeps the full water overflow status always in making, when mould rotates so far station, with bosh jack-up, mold bottom is immersed in the water cool off by cylinder, water overflows to outer cooling bath, and the outlet pipe by outer cooling bath flows back into water tank then.This cooling system is compared with traditional cooling system to have simple and practical, safe and reliable and can reduce the advantage of die cost, and the cooling effectiveness height, and cooling water obtains circulation, and is little to ambient influnence.
Description of drawings
Below in conjunction with the drawings and specific embodiments the utility model is further described:
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is a vertical view of the present utility model.
The specific embodiment
As depicted in figs. 1 and 2, embodiment for the utility model accumulator pole group cast welding machine cooling device, comprise the bosh 1 of being located at utmost point group mould 8 belows, described bosh comprises outer cooling bath 11 and is located at the interior interior cooling bath 12 of outer cooling bath, the cooling bath upper edge is higher than outer cooling bath upper edge in described, cooling bath connects water inlet pipe 2 continuous water supplies in described, and described outer cooling bath connects outlet pipe 3 continuous drainages.Described water inlet pipe 2 and outlet pipe 3 are connected with same water tank 4, and the described water tank water surface is lower than described bosh bottom surface, and described water inlet pipe is provided with water pump 5.The water inlet end of described water inlet pipe 2 is positioned at cooling bath 12 bottoms, and the water side of described outlet pipe 3 is positioned at the bottom of outer cooling bath 11.Described bosh 1 is located on the bosh support 6, and described bosh support lower end is fixed on the cylinder 7.Described utmost point group mould 8 belows are provided with a groove 9, and the groove outer edge surrounds the cooling surface of mould, and described interior cooling bath 12 upper edges are positioned at inboard one centimetre of groove outer edge.

Claims (5)

1. accumulator pole group cast welding machine cooling device, it is characterized in that: comprise the bosh (1) of being located at utmost point group mould (8) below, described bosh comprises outer cooling bath (11) and is located at the interior interior cooling bath (12) of outer cooling bath, the cooling bath upper edge is higher than outer cooling bath upper edge in described, cooling bath connects water inlet pipe (2) continuous water supply in described, and described outer cooling bath connects outlet pipe (3) continuous drainage.
2. accumulator pole group cast welding machine cooling device according to claim 1, it is characterized in that: described water inlet pipe (2) and outlet pipe (3) are connected with same water tank (4), the described water tank water surface is lower than described bosh bottom surface, and described water inlet pipe is provided with water pump (5).
3. accumulator pole group cast welding machine cooling device according to claim 2 is characterized in that: the water inlet end of described water inlet pipe (2) is positioned at cooling bath (12) bottom, and the water side of described outlet pipe (3) is positioned at the bottom of outer cooling bath (11).
4. accumulator pole group cast welding machine cooling device according to claim 1 is characterized in that: described bosh (1) is located on the bosh support (6), and described bosh support lower end is fixed on the cylinder (7).
5. accumulator pole group cast welding machine cooling device according to claim 4, it is characterized in that: described utmost point group mould (8) below is provided with a groove (9), the groove outer edge surrounds the cooling surface of mould, and described interior cooling bath (12) upper edge is positioned at inboard one centimetre of groove outer edge.
CN2011200072228U 2011-01-11 2011-01-11 Cooling device of storage battery electrode group cast welding machine Expired - Fee Related CN201922025U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200072228U CN201922025U (en) 2011-01-11 2011-01-11 Cooling device of storage battery electrode group cast welding machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200072228U CN201922025U (en) 2011-01-11 2011-01-11 Cooling device of storage battery electrode group cast welding machine

Publications (1)

Publication Number Publication Date
CN201922025U true CN201922025U (en) 2011-08-10

Family

ID=44425894

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200072228U Expired - Fee Related CN201922025U (en) 2011-01-11 2011-01-11 Cooling device of storage battery electrode group cast welding machine

Country Status (1)

Country Link
CN (1) CN201922025U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102069333A (en) * 2011-01-11 2011-05-25 长兴欧德申机械有限公司 Cooling device of storage battery polar group cast welding machine
CN108044085A (en) * 2018-01-18 2018-05-18 佛山市恒学科技服务有限公司 A kind of foundry machinery cooling device for facilitating metal liquid coagulation forming

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102069333A (en) * 2011-01-11 2011-05-25 长兴欧德申机械有限公司 Cooling device of storage battery polar group cast welding machine
CN108044085A (en) * 2018-01-18 2018-05-18 佛山市恒学科技服务有限公司 A kind of foundry machinery cooling device for facilitating metal liquid coagulation forming

Similar Documents

Publication Publication Date Title
CN102899705A (en) Electroplated diamond wire saw sand-applying device
CN102240785A (en) Continuous casting machine for electrode plate grid of lead-acid storage battery
CN104032328A (en) Environmental-protection and energy-conversion type diaphragm electrolysis device
CN201922025U (en) Cooling device of storage battery electrode group cast welding machine
CN102069333A (en) Cooling device of storage battery polar group cast welding machine
CN202824203U (en) Environment-friendly-type wire drawing liquid filtering, cooling and circulating system
CN207834024U (en) A kind of cable cooling drying system
CN211194822U (en) Multi-runner circulating cooling water supply system for injection molding
CN201818471U (en) Vacuum pump unit cooling system
CN203625506U (en) Electroplating device for acidic zinc-nickel alloy
CN203046232U (en) Automatic water level control device of vacuum sizing box
CN201817473U (en) Fermentation tank cooling device
CN204295153U (en) Steel-pipe welding cooling water circulating device
CN203320169U (en) Plating tank solution cooling device
CN202123197U (en) Device for improving dimensional accuracy of thick and large wax moulds undergoing precision investment casting
CN203923395U (en) Environment-friendly and energy-efficient diaphragm electrolysis apparatus
CN202062065U (en) Storage cell electrode group cast welding device
CN205183668U (en) Be used for forging water -cooled siphon bucket
CN202660830U (en) Electro-deposition copper rectifier cooling water cyclic utilization system
CN105375069A (en) Cooling water bath used in acid filling process of accumulator battery
CN205744642U (en) A kind of reciprocating cylinder system of high thrust
CN206157242U (en) Electrolyte cooling system
CN203333807U (en) Device for recycling electroplating liquid from electroplating bath
CN203238159U (en) Tin bath with cooling structure at bottom
CN203568235U (en) Material storage tank for copper-clad plate production

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: ZHEJIANG OUDESHEN AUTOMATION EQUIPMENT CO., LTD.

Free format text: FORMER NAME: OUDESHEN MECHANICAL CO., LTD., CHANGXING

CP03 Change of name, title or address

Address after: 313100 Zhejiang city of Huzhou province Changxing County pheasant emerging urban industrial park

Patentee after: Zhejiang Oudeshen Automation Equipments Co., Ltd.

Address before: 313100 new industrial park, pheasant City, Huzhou, Zhejiang, Changxing County

Patentee before: Changxing Oudeshen Machinery Co., Ltd.

ASS Succession or assignment of patent right

Owner name: ZHEJIANG CHANGXIN NUOBOTE AUTOMATION EQUIPMENT CO.

Free format text: FORMER OWNER: ZHEJIANG OUDESHEN AUTOMATION EQUIPMENT CO., LTD.

Effective date: 20140804

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20140804

Address after: 313100 Zhejiang city of Huzhou province Changxing County pheasant emerging urban industrial park

Patentee after: Zhejiang Changxin Roebert automation equipment Co., Ltd.

Address before: 313100 Zhejiang city of Huzhou province Changxing County pheasant emerging urban industrial park

Patentee before: Zhejiang Oudeshen Automation Equipments Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110810

Termination date: 20160111