CN201915966U - Fixing device of hanging scaffold - Google Patents

Fixing device of hanging scaffold Download PDF

Info

Publication number
CN201915966U
CN201915966U CN2010202784735U CN201020278473U CN201915966U CN 201915966 U CN201915966 U CN 201915966U CN 2010202784735 U CN2010202784735 U CN 2010202784735U CN 201020278473 U CN201020278473 U CN 201020278473U CN 201915966 U CN201915966 U CN 201915966U
Authority
CN
China
Prior art keywords
circular tube
pipe
diameter
hanging scaffold
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202784735U
Other languages
Chinese (zh)
Inventor
杨海涛
王利廷
赵志红
马曼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal No 1 Construction Co Ltd
Original Assignee
China Coal No 1 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal No 1 Construction Co Ltd filed Critical China Coal No 1 Construction Co Ltd
Priority to CN2010202784735U priority Critical patent/CN201915966U/en
Application granted granted Critical
Publication of CN201915966U publication Critical patent/CN201915966U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Surgical Instruments (AREA)

Abstract

The utility model discloses a fixing device of a hanging scaffold, which mainly comprises an outer circular tube, an inner circular tube, a pin shaft, a base vertical plate, a base transverse bar and a base plate, wherein the inner circular tube is connected in the outer circular tube; the walls of the inner circular tube and the outer circular tube are respectively provided with 5-10 circular holes; the pin shaft is inserted into the circular holes on the walls of the inner circular tube and the outer circular tube; and the base vertical plate, the base transverse bar 5 and the base plate are sequentially connected at the lower part of the outer circular tube. In the utility model, the positions and diameters of the circular holes respectively arranged on the walls of the outer circular tube and the inner circular tube are consistent, the inner diameter of the outer circular tube is greater than the outer diameter of the inner circular tube, the diameter of the pin shaft is smaller than the diameter of the circular holes respectively arranged on the walls of the outer circular tube and the inner circular tube, and the length of the pin shaft is greater than the diameter of the outer circular tube. The fixing device can reduce the swing of the hanging scaffold, improve the safety of operating personnel on the hanging scaffold and ensure the construction quality. In addition, the fixing device has the advantages of low manufacturing cost, and is easy to process and install.

Description

The hanging scaffold fixator
Technical field
The utility model relates to a kind of fixator, relates in particular to the hanging scaffold fixator in the mine shaft of vertical well installation engineering.
Background technology
For many years, in construction mine shaft of vertical well New Equipment Engineering, because vertical ventilation section must reach relevant technical requirements, there are difference in hanging scaffold diameter and the mineshaft diameter of design, and generally the hanging scaffold diameter is less than the about 300mm of mineshaft diameter, so, hanging scaffold can slight swing during operation on hanging scaffold for the constructor, make troubles for constructor's operation on hanging scaffold, have unsafe factors such as weighing down people, bob thing, also influenced construction quality simultaneously.
Summary of the invention
Slightly swing in order to solve hanging scaffold, the constructor is operation inconvenience on hanging scaffold, has designed the hanging scaffold fixator.
The technical scheme in the invention for solving the technical problem can be:
The hanging scaffold fixator mainly is made up of outer pipe, interior pipe, bearing pin, base riser, base horizontal bar, bed plate, pipe is connected in the pipe pipe outside in it, be respectively arranged with 5-10 circular hole on interior pipe and the outer tube wall, in the circular hole in bearing pin inserts on pipe and the outer tube wall, base riser, base horizontal bar 5, bed plate connect the pipe bottom outside successively.
The technical scheme in the invention for solving the technical problem is also to be:
Described hanging scaffold fixator, the circular hole position that is provided with respectively on its described outer pipe and the interior tube wall is consistent with diameter, the internal diameter of outer pipe is greater than the external diameter of interior pipe, the diameter of bearing pin is less than the diameter of the circular hole that is provided with respectively on outer pipe and the interior tube wall, and length is greater than the diameter of outer pipe.
The beneficial effects of the utility model are:
1, reduces the swing of hanging scaffold, improve the safety of operating personnel on the hanging scaffold, guaranteed engineering construction quality;
2, cheap, processing and fabricating is simple, is easy to install.
Description of drawings
Fig. 1 is a hanging scaffold fixator general assembly drawing
Fig. 2 is interior pipe outer tube connection diagram
Fig. 3 is a hanging scaffold holder base vertical view
Fig. 4 is a hanging scaffold holder base front view
Fig. 5 is a hanging scaffold holder base left view
Fig. 6 is fixator arrangement diagram on hanging scaffold
Among the figure, 1. outer pipe, 2. in pipe, 3. bearing pin, 4. base riser, 5. base horizontal bar, 6. bed plate.
The specific embodiment
Fig. 1 Fig. 2, the hanging scaffold fixator mainly is made up of outer pipe 1, interior pipe 2, bearing pin 3, base riser 4, base horizontal bar 5, bed plate 6, pipe 2 is connected in pipe 1 pipe outside in it, be respectively arranged with 5-10 circular hole on interior pipe 2 and outer pipe 1 tube wall, in the circular hole in bearing pin 3 inserts on pipe 2 and outer pipe 1 tube wall, base riser 4, base horizontal bar 5, bed plate 6 connect pipe 1 bottom outside successively.The circular hole position that is provided with respectively on described outer pipe 1 and interior pipe 2 tube walls is consistent with diameter, the internal diameter of outer pipe 1 is greater than the external diameter of interior pipe 2, the diameter of bearing pin 3 is less than the diameter of the circular hole that is provided with respectively on outer pipe 1 and interior pipe 2 tube walls, and length is greater than the diameter of outer pipe 1.
Fig. 3 Fig. 4 Fig. 5 is hanging scaffold holder base schematic diagram, and base riser, base horizontal bar and bed plate are welded to form the hanging scaffold holder base, and the base riser is a rectangular slab, and base horizontal bar top is circular arc, and its arc is consistent with the profile of outer pipe 1.
Fig. 6 is for for fixator arrangement diagram on hanging scaffold, uniform on hanging scaffold 4-6 fixator is set.

Claims (2)

1. the hanging scaffold fixator mainly is made up of outer pipe (1), interior pipe (2), bearing pin (3), base riser (4), base horizontal bar (5), bed plate (6), it is characterized in that: interior pipe (2) is connected in pipe (1) pipe outside, be respectively arranged with 5-10 circular hole on interior pipe (2) and outer pipe (1) tube wall, in the circular hole in bearing pin (3) inserts on pipe (2) and outer pipe (1) tube wall, base riser (4), base horizontal bar (5), bed plate (6) connect pipe (1) bottom outside successively.
2. hanging scaffold fixator according to claim 1, it is characterized in that: the circular hole position that is provided with respectively on described outer pipe (1) and interior pipe (2) tube wall is consistent with diameter, the internal diameter of outer pipe (1) is greater than the external diameter of interior pipe (2), the diameter of bearing pin (3) is less than the diameter of the circular hole that is provided with respectively on outer pipe (1) and interior pipe (2) tube wall, and length is greater than the diameter of outer pipe (1).
CN2010202784735U 2010-08-02 2010-08-02 Fixing device of hanging scaffold Expired - Fee Related CN201915966U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202784735U CN201915966U (en) 2010-08-02 2010-08-02 Fixing device of hanging scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202784735U CN201915966U (en) 2010-08-02 2010-08-02 Fixing device of hanging scaffold

Publications (1)

Publication Number Publication Date
CN201915966U true CN201915966U (en) 2011-08-03

Family

ID=44415766

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202784735U Expired - Fee Related CN201915966U (en) 2010-08-02 2010-08-02 Fixing device of hanging scaffold

Country Status (1)

Country Link
CN (1) CN201915966U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102562073A (en) * 2012-01-11 2012-07-11 中国矿业大学 Telescopic boom of walking hanging scaffold
CN103277104A (en) * 2013-06-17 2013-09-04 中国矿业大学 Sinking platform in-well hanging equipment and method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102562073A (en) * 2012-01-11 2012-07-11 中国矿业大学 Telescopic boom of walking hanging scaffold
CN102562073B (en) * 2012-01-11 2014-04-16 中国矿业大学 Telescopic boom of walking hanging scaffold
CN103277104A (en) * 2013-06-17 2013-09-04 中国矿业大学 Sinking platform in-well hanging equipment and method
CN103277104B (en) * 2013-06-17 2016-01-13 中国矿业大学 Hanging equipment and method in sinking platform well

Similar Documents

Publication Publication Date Title
CN204781899U (en) That adheres to whole electric lift scaffold of formula multi -functionally attaches wall support
CN201915966U (en) Fixing device of hanging scaffold
CN202709411U (en) Lift type air conditioner bracket
CN202639761U (en) Bearing frame for assembling and disassembling AGD (Agar Gel Diffusion) pipeline of reducing furnace
CN201541085U (en) Lifting device for rotary insulated platform
CN201852096U (en) Lifting type gas stove burner
CN208138879U (en) A kind of gas pipeline controller being easily installed
CN202810169U (en) Built-in scaffold for coke oven masonry and building
CN202082571U (en) Embedded display screen mounting seat
CN210263967U (en) Installation device for house prefabricated part
CN203624768U (en) Construction hoist capable of carrying climbing formwork
CN201555338U (en) Separated mounting bracket for outdoor unit of air conditioner
CN203665188U (en) Split type screw auxiliary support base
CN205689897U (en) A kind of detachable cable support
CN202755633U (en) Rebar hanger platform for installing wall template
CN204920171U (en) Elevartor shaft is platform for safety protection
CN205242988U (en) Bottom has diagonal bracing's shaped steel of encorbelmenting
CN201953241U (en) Joint mechanism of wall between windows for steel structure
CN104929358A (en) Multifunctional wall attachment support of attachment type overall electric lifting scaffold and use method
CN204823980U (en) Internal hoisting device of jar
CN215951191U (en) Explosion-proof lighting emergency dual-purpose lamp for low gas shield tunnel
CN201892006U (en) Liftable base for safe
CN204875557U (en) Rhombus false work
CN203452847U (en) Pendant pipeline hook for channel
CN202000375U (en) Eccentric plastic inspection well

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110803

Termination date: 20120802