CN204823980U - Internal hoisting device of jar - Google Patents
Internal hoisting device of jar Download PDFInfo
- Publication number
- CN204823980U CN204823980U CN201520571668.1U CN201520571668U CN204823980U CN 204823980 U CN204823980 U CN 204823980U CN 201520571668 U CN201520571668 U CN 201520571668U CN 204823980 U CN204823980 U CN 204823980U
- Authority
- CN
- China
- Prior art keywords
- mounting cylinder
- thick bamboo
- tank body
- installation section
- jar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
The utility model relates to a storage tank interior arrangement installation device technical field is an internal hoisting device of jar, it has the through -hole including a jar body, guiding axle, an installation section of thick bamboo and electric hoist at the top of the jar body, and fixed mounting has the bearing frame in the through -hole. The chain for stripping the bark has a reasonable structure, high durability and convenient use, in operation, with the highest position's in the jar facility fixed mounting on an installation section of thick bamboo, it will install a section of thick bamboo and the direction rebound of guiding axle along the bearing to start the electric hoist, thereby it reachs the assigned position to drive the highest position's facility, then, install an installation section of thick bamboo again at the lower extreme of an installation section of thick bamboo, on the facility fixed mounting installation section of thick bamboo below with the second height, similarly, all facilities are sent to behind the assigned position the most at last, fix a final installation section of thick bamboo again and can accomplish the construction bottom the jar body. Like this, work efficiency has not only greatly been improved, still the construction cycle is reduced.
Description
Technical field
The utility model relates to tank inside device erecting device technical field, is bont in a kind of tank body.
Background technology
At present, in Storage Tank, the installation of facility adopts the mode setting up scaffold usually, and workmen stands on scaffold and installs, and by the restriction of tank inner working face, there is construction efficiency low and operating personnel's unsafe problem during construction.In addition, setting up and remove scaffold needs a large amount of time, also extends the engineering time.
Summary of the invention
The utility model provides bont in a kind of tank body, overcomes the deficiency of above-mentioned prior art, and it effectively can solve the problem adopting scaffold construct in tank body to exist operating efficiency low and time to grow.
The technical solution of the utility model is achieved like this: bont in a kind of tank body, comprise tank body, the axis of guide, mounting cylinder and hoist ceiling crane, through hole is had at the top of tank body, at through hole internal fixtion, bearing seat is installed, the bearing that axis direction is above-below direction is installed in bearing seat, the upper end of the axis of guide is positioned at bearing, mounting cylinder is fixed with in the lower end of the axis of guide, the base part seat of mounting cylinder is in tank base, tank body internal fixtion outside mounting cylinder is provided with two hoist ceiling cranes, the chain sling of hoist ceiling crane is fixedly mounted on the lower end of mounting cylinder, negative thread is provided with in the lower end of mounting cylinder.
As preferably, the lower end of above-mentioned mounting cylinder is provided with hook.
As preferably, the above-mentioned axis of guide and mounting cylinder are fixedly installed togather by screw thread.
As preferably, above-mentioned mounting cylinder is provided with mount pad.
The utility model is rational in infrastructure, easy to use, during work, the facility of extreme higher position in tank is fixedly mounted on mounting cylinder, start hoist ceiling crane mounting cylinder and the axis of guide direction along bearing is moved up, thus drive the facility of extreme higher position to arrive assigned address, now, a mounting cylinder is installed in the lower end of mounting cylinder again, the facility of the second height is fixedly mounted on mounting cylinder below, by that analogy, after the most all facilities send to assigned address, then last mounting cylinder is fixed on tank base can completes construction.Like this, not only drastically increase work efficiency, also shorten construction period.
Accompanying drawing explanation
Fig. 1 is that master of the present utility model looks perspective structure schematic diagram.
Coding in figure is respectively: 1 is tank body, and 2 is the axis of guide, and 3 is mounting cylinder, and 4 is hoist ceiling crane, and 5 is bearing seat, and 6 is hook.
Detailed description of the invention
As shown in Figure 1, bont in this tank body, comprise tank body 1, the axis of guide 2, mounting cylinder 3 and hoist ceiling crane 4, through hole is had at the top of tank body 1, at through hole internal fixtion, bearing seat 5 is installed, the bearing that axis direction is above-below direction is installed in bearing seat, the upper end of the axis of guide 2 is positioned at bearing, mounting cylinder 3 is fixed with in the lower end of the axis of guide 2, the base part seat of mounting cylinder 3 is bottom tank body 1, tank body 1 internal fixtion outside mounting cylinder 3 is provided with two hoist ceiling cranes 4, the chain sling of hoist ceiling crane 4 is fixedly mounted on the lower end of mounting cylinder 3, negative thread is provided with in the lower end of mounting cylinder 3.During work, the facility of extreme higher position in tank is fixedly mounted on mounting cylinder 3, start hoist ceiling crane 4 mounting cylinder 3 and the axis of guide 2 direction along bearing is moved up, thus drive the facility of extreme higher position to arrive assigned address, now, a mounting cylinder 3 is installed in the lower end of mounting cylinder 3 again, the facility of the second height is fixedly mounted on mounting cylinder 3 below, by that analogy, after the most all facilities send to assigned address, then last mounting cylinder 3 is fixed on bottom tank body 1 and can completes construction.Like this, not only drastically increase work efficiency, also shorten construction period.
As shown in Figure 1, the lower end of mounting cylinder 3 is provided with hook 6.Be convenient to like this be connected with the chain sling of hoist ceiling crane 4.
As shown in Figure 1, for the ease of Assembly &Disassembly, the axis of guide 2 and mounting cylinder 3 are fixedly installed togather by screw thread.
As required, for the ease of being connected with the facility that needs are installed, mounting cylinder 3 is provided with mount pad.
Claims (5)
1. bont in a tank body, it is characterized in that, comprise tank body (1), the axis of guide (2), mounting cylinder (3) and hoist ceiling crane (4), through hole is had at the top of tank body (1), at through hole internal fixtion, bearing seat (5) is installed, in bearing seat (5), the bearing that axis direction is above-below direction is installed, the upper end of the axis of guide (2) is positioned at bearing, mounting cylinder (3) is fixed with in the lower end of the axis of guide (2), the base part seat of mounting cylinder (3) is in tank body (1) bottom, at tank body (1) internal fixtion in mounting cylinder (3) outside, two hoist ceiling cranes (4) are installed, the chain sling of hoist ceiling crane (4) is fixedly mounted on the lower end of mounting cylinder (3), negative thread is provided with in the lower end of mounting cylinder (3).
2. bont in tank body according to claim 1, is characterized in that, the lower end of mounting cylinder (3) is provided with hook (6).
3. bont in tank body according to claim 1 and 2, is characterized in that, the axis of guide (2) and mounting cylinder (3) are fixedly installed togather by screw thread.
4. bont in tank body according to claim 1 and 2, is characterized in that, mounting cylinder (3) is provided with mount pad.
5. bont in tank body according to claim 3, is characterized in that, mounting cylinder (3) is provided with mount pad.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520571668.1U CN204823980U (en) | 2015-07-27 | 2015-07-27 | Internal hoisting device of jar |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520571668.1U CN204823980U (en) | 2015-07-27 | 2015-07-27 | Internal hoisting device of jar |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204823980U true CN204823980U (en) | 2015-12-02 |
Family
ID=54681603
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520571668.1U Expired - Fee Related CN204823980U (en) | 2015-07-27 | 2015-07-27 | Internal hoisting device of jar |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204823980U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111305627A (en) * | 2020-03-24 | 2020-06-19 | 中化二建集团有限公司 | Concrete tank room construction method |
-
2015
- 2015-07-27 CN CN201520571668.1U patent/CN204823980U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111305627A (en) * | 2020-03-24 | 2020-06-19 | 中化二建集团有限公司 | Concrete tank room construction method |
| CN111305627B (en) * | 2020-03-24 | 2021-10-26 | 中化二建集团有限公司 | Concrete tank room construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202423956U (en) | Hoisting device for power transmission line maintenance | |
| CN103010943B (en) | Large wind turbine generator system variable pitch speed reducer hanger and use method thereof | |
| CN203345950U (en) | Dismounting control system of tower crane | |
| CN204038849U (en) | A kind of cable drum lifting device | |
| CN204737595U (en) | Roof beam hoist gyration hoist is hung to four hoisting point electromagnetism | |
| CN203544752U (en) | Simple gear suspension bracket | |
| CN205310867U (en) | Tire aerify forming machine | |
| CN204823649U (en) | Roof beam hoist gyration hoist is hung to four hoisting point electromagnetism | |
| CN202226567U (en) | Lifter | |
| CN202575762U (en) | Electric lifting rod for construction elevator | |
| CN203806971U (en) | Portal device for caterpillar crane | |
| CN203112395U (en) | Loop wheel machine device for maintenance of spinning cake vehicle | |
| CN103628663A (en) | Plaster coating machine for outer wall of tall building | |
| CN204584683U (en) | Multiaxis tightens up equipment apart from spring | |
| CN204384775U (en) | Hydraulic pressure oblique-arm type elevator chamber | |
| CN203251018U (en) | Transmission line lifting tool | |
| CN204823896U (en) | Four bars balance crane | |
| CN203215080U (en) | Novel stable cable support | |
| CN205465958U (en) | Axle installation device | |
| CN104626082A (en) | Production line assisting frame | |
| CN203359837U (en) | Double-fly-jib device of tire crane | |
| CN204686542U (en) | A kind of portable steel support frame | |
| CN203474226U (en) | T-shaped lifting balancing beam | |
| CN203497921U (en) | Special lifting appliance for lifting slender rod piece | |
| CN204848095U (en) | European style hangs electric block |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151202 Termination date: 20160727 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |