CN201915612U - Wall-hang type scaffold - Google Patents
Wall-hang type scaffold Download PDFInfo
- Publication number
- CN201915612U CN201915612U CN2010206052223U CN201020605222U CN201915612U CN 201915612 U CN201915612 U CN 201915612U CN 2010206052223 U CN2010206052223 U CN 2010206052223U CN 201020605222 U CN201020605222 U CN 201020605222U CN 201915612 U CN201915612 U CN 201915612U
- Authority
- CN
- China
- Prior art keywords
- wall
- guardrail
- hanging
- scaffold
- adjacent
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model discloses a wall-hang type scaffold including a plurality of rows of hanging covers fixedly connected to wall plates, a tripod is inserted into each row of the hanging covers, sleeves are fixedly connected on the tripods, columns are inserted into the sleeves and are fixedly connected with orifice plates, a middle guardrail is penetrated through every two adjacent orifice plates, and an upper guardrail is fixedly connected to the upper parts of every two adjacent columns; a gangplank is join on every two adjacent tripods. The wall-hang type scaffold provided is fast in installation speed and high in work efficiency, the original large-area high scaffold is reduced to a horizontal operating console, thereby substantially reducing the installation and material costs of the scaffold, furthermore, the scaffold provided is simple in structure and convenient in installation.
Description
Technical field
The utility model relates to a kind of scaffold, particularly a kind of wall-hanging scaffold.
Background technology
Along with the continuous development of China's Petrochemical and the rapid construction in national petroleum reserve base, crude oil in China storage tank forward maximizes, group's tank development, the built on-site engineering of vertical cylinder storage tank is more and more, at present, in vertical cylinder storage tank built on-site process, tank shell is one to enclose and install, tank shell is installed, generally set up around the double logical high scaffold of jar, the tower merogenesis also is like this when installing, wallboard is in assembling process, and the operator generally works on the platform of scaffold building.Storage tank or tower install that the general cycle is all longer, and the scaffolding holding time is long, and input cost is bigger, and expense is higher.
Summary of the invention
The utility model for solve the technical problem that exists in the known technology provide a kind of easy for installation, cost of manufacture is low, safe and reliable wall-hanging scaffold.
The technical scheme that the utility model is taked for the technical problem that exists in the solution known technology is: a kind of wall-hanging scaffold, comprise the hanging sleeve that multiple row and wallboard are affixed, be fitted with a tripod in the described hanging sleeve of every row, be connected with sleeve above the described tripod, be fitted with column in the described sleeve, be connected with orifice plate on the described column; Be coated with middle guardrail in adjacent two described orifice plates, adjacent two described column tops are connected with guardrail; Be erected with springboard above adjacent two described tripods.
Described hanging sleeve is formed by steel band, and the both ends of described steel band all are fixed on the described wallboard, is formed with jack between the middle part of described steel band and the described wallboard.
Described tripod is welded by angle steel.
Guardrail is made by steel wire or reinforcing bar in described.
The described guardrail of going up is made by steel pipe.
Advantage and the good effect that the utlity model has are: installation rate is fast, high efficiency, and the logical high scaffold of original large tracts of land is tapered to the horizontal plane operating desk, has reduced installation, the material cost of scaffold very significantly.And the utility model is simple in structure, and is easy for installation.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the tripod in the utility model and the structural representation of upper connector thereof;
Fig. 3 is the structural representation of the utility model hanging sleeve.
Among the figure: 1, hanging sleeve, 2, tripod, 3, sleeve, 4, column, 5, orifice plate, 6, go up guardrail, 7, middle guardrail, 8, springboard, 9, wallboard.
The specific embodiment
For further understanding summary of the invention of the present utility model, characteristics and effect, exemplify following examples now, and conjunction with figs. is described in detail as follows:
See also Fig. 1~Fig. 3, a kind of wall-hanging scaffold comprises the hanging sleeve 1 that multiple row and wallboard 9 are affixed, is fitted with a tripod 2 in every row hanging sleeve 1, welded sleeves 3 above the tripod 2, plug-in mounting columns 4 in the sleeve 3, welding orifice plate 5 on the column 4; Guardrail 7 in installing in adjacent two orifice plates 5, the affixed guardrail 6 of going up in adjacent two column 4 tops; Set up springboard 8 above adjacent two tripods 2.
See also Fig. 3, above-mentioned hanging sleeve 1 is made by steel band, and the both ends of steel band all are fixed on the wallboard 9, forms the jack for the pin plug-in mounting of tripod 2 between the middle part of steel band and wallboard 9.
Above-mentioned tripod 2 is welded by angle steel.Middle guardrail 7 is made by steel wire or reinforcing bar.Last guardrail is made by steel pipe.Column 4, sleeve 3 and last guardrail 6 are made by steel pipe.Orifice plate 5 adopts to punch on band steel to be made.
Although in conjunction with the accompanying drawings preferred embodiment of the present utility model is described above; but the utility model is not limited to the above-mentioned specific embodiment; the above-mentioned specific embodiment only is schematic; be not restrictive; those of ordinary skill in the art is under enlightenment of the present utility model; not breaking away under the scope situation that the utility model aim and claim protect, can also make a lot of forms, these all belong within the protection domain of the present utility model.
Claims (5)
1. a wall-hanging scaffold is characterized in that, comprises the hanging sleeve that multiple row and wallboard are affixed, is fitted with a tripod in the described hanging sleeve of every row, is connected with sleeve above the described tripod, is fitted with column in the described sleeve, is connected with orifice plate on the described column; Be coated with middle guardrail in adjacent two described orifice plates, adjacent two described column tops are connected with guardrail; Be erected with springboard above adjacent two described tripods.
2. wall-hanging scaffold according to claim 1 is characterized in that described hanging sleeve is formed by steel band, and the both ends of described steel band all are fixed on the described wallboard, is formed with jack between the middle part of described steel band and the described wallboard.
3. wall-hanging scaffold according to claim 1 is characterized in that described tripod is welded by angle steel.
4. wall-hanging scaffold according to claim 1 is characterized in that, described middle guardrail is made by steel wire or reinforcing bar.
5. wall-hanging scaffold according to claim 1 is characterized in that, the described guardrail of going up is made by steel pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206052223U CN201915612U (en) | 2010-11-13 | 2010-11-13 | Wall-hang type scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206052223U CN201915612U (en) | 2010-11-13 | 2010-11-13 | Wall-hang type scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201915612U true CN201915612U (en) | 2011-08-03 |
Family
ID=44415415
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010206052223U Expired - Fee Related CN201915612U (en) | 2010-11-13 | 2010-11-13 | Wall-hang type scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201915612U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107060305A (en) * | 2017-04-26 | 2017-08-18 | 中国十九冶集团有限公司 | External wall construction operating platform and construction method |
-
2010
- 2010-11-13 CN CN2010206052223U patent/CN201915612U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107060305A (en) * | 2017-04-26 | 2017-08-18 | 中国十九冶集团有限公司 | External wall construction operating platform and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201864516U (en) | Lifting appliance special for overhauling isolating switch | |
CN203247868U (en) | Large-span steel structure construction temporary supporting frame | |
CN201915612U (en) | Wall-hang type scaffold | |
CN211898414U (en) | Combined type supporting construction for building | |
CN204938800U (en) | Tower crane rood beam basis | |
CN203096729U (en) | Storage tank pile cap assembling type pouring platform | |
CN203393721U (en) | Inner support main purlin component | |
CN203924659U (en) | Hanging frame type construction platform device | |
CN103388336B (en) | Main purline part for inner support | |
CN202429925U (en) | Tower crane | |
CN203022366U (en) | Temporary supporting latticed column for grid frame | |
CN102277957B (en) | Overhaul platform of desulfurizing tower | |
CN201679271U (en) | Power triangular tower | |
CN203247871U (en) | Frame type crawling ladder for closed construction of outer wall plates in windy area | |
CN203961126U (en) | A kind of side welding column | |
CN204849808U (en) | Basis is assembled in prefabrication of large -scale tower machine concrete | |
CN204898708U (en) | Assembled steel construction conversion layer of tower crane | |
CN203961124U (en) | A kind of flange post | |
CN204238220U (en) | The concrete construction passage that vertically puts in storage | |
CN203322485U (en) | Novel petroleum platform pipeline protecting tube | |
CN204609422U (en) | Three pipe tower platform structures | |
CN204947514U (en) | A kind of substation secondary device room cable laying device | |
CN203334297U (en) | Connecting cover plate | |
CN203336137U (en) | Petroleum pipeline connector protection tube | |
CN203257320U (en) | Ladder for installing arm rest of dynamic compactor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110803 Termination date: 20161113 |
|
CF01 | Termination of patent right due to non-payment of annual fee |