CN201914984U - Integrated sewage treatment and sedimentation combination device - Google Patents

Integrated sewage treatment and sedimentation combination device Download PDF

Info

Publication number
CN201914984U
CN201914984U CN2010206317296U CN201020631729U CN201914984U CN 201914984 U CN201914984 U CN 201914984U CN 2010206317296 U CN2010206317296 U CN 2010206317296U CN 201020631729 U CN201020631729 U CN 201020631729U CN 201914984 U CN201914984 U CN 201914984U
Authority
CN
China
Prior art keywords
sewage
inclined tube
water distribution
cloth
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206317296U
Other languages
Chinese (zh)
Inventor
刘彩红
田永
刘尚福
Original Assignee
VISION ENVIRONMENT (GUANGZHOU) CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by VISION ENVIRONMENT (GUANGZHOU) CO Ltd filed Critical VISION ENVIRONMENT (GUANGZHOU) CO Ltd
Priority to CN2010206317296U priority Critical patent/CN201914984U/en
Application granted granted Critical
Publication of CN201914984U publication Critical patent/CN201914984U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Separation Of Suspended Particles By Flocculating Agents (AREA)

Abstract

The utility model relates to an integrated sewage treatment and sedimentation combination device, which comprises a coagulation groove for fully mixing the sewage and coagulant, a flocculation groove for fully mixing the sewage and a flocculant and a sedimentation tank for depositing the sludge which are communicated in sequence, wherein a water distribution groove, a drainage groove, a water distribution region, a mud bucket, an inclined tube filling and a mud discharge pipe are arranged in the sedimentation tank; the water distribution groove is arranged at the upper part of the water distribution region; the sewage in the water distribution groove enters the water distribution region by overflowing; a water baffle is arranged between the water distribution region and the inclined tube filling; the lower part of the water distribution region is communicated with the lower part of the inclined tube filling; the mud bucket for collecting the sedimentation sludge is arranged below the water distribution region and the inclined tube filling; and the drainage groove for collecting and discharging the sewage after the sludge is settled is arranged above the inclined tube filling. The combination device is simple in structure, small in occupied area and low in cost. The combination device solves the problem that the environmental-friendly invested funds is limited and the occupied area is in short supply for small processing factories, thereby effectively reducing the environmental protection investment cost of the factory.

Description

A kind of integrated sewage water is handled the precipitation associated plant
Technical field
The utility model is that a kind of integrated sewage water is handled the precipitation associated plant, belongs to the renovation technique of the small-sized suite of equipment of sewage disposal.
Background technology
Along with the deterioration day by day of surface water environment, the implementation dynamics of environmental protection policy progressively strengthens, and increasing small processing factory even handicraft workshop all must be set up corresponding sewage treatment facility.Because the semiworks floor space is little, have quite modest financial resources, and there are shortcomings such as investment cost height, long construction period, floor space be big in traditional skeleton construction Sewage treatment systems, so semiworks can't bear traditional skeleton construction Sewage treatment systems.Though the heavy pond of existing integrated steel associated plant has solved Steel Concrete treatment system long construction period, the shortcoming that floor space is big, but because the corrodibility of sewage is strong, progressively wearing out owing to preservative coat after three to five years, even strengthen the maintenance dynamics, still can't avoid the miserable condition of steel systeming equipment main body, the operation expense height because of corrosion well damage even collapse.
The utility model content
The purpose of this utility model is to consider the problems referred to above and provides a kind of simple in structure that floor space is little, the integrated sewage water processing precipitation associated plant that cost is low.The utility model is reasonable in design, and operation expense is low, and is convenient and practical.
The technical solution of the utility model is: integrated sewage water of the present utility model is handled the precipitation associated plant, include make sewage and the coagulating agent that communicate successively and carry out well-mixed coagulation tank, make sewage and flocculation agent carry out well-mixed flocculation groove, the settling bath that is used for precipitating sludge, wherein be provided with the cloth tank in the settling bath, drainage tray, the cloth pool, bucket, the inclined tube filler, shore pipe, wherein the cloth tank places the top in cloth pool, sewage in the cloth tank enters in the cloth pool by overflow, be provided with water eliminator between cloth pool and the inclined tube filler, the bottom in cloth pool communicates with the bottom of inclined tube filler, the bucket that is used for collecting precipitation mud places the below of cloth pool and inclined tube filler, and the drainage tray that is used to collect and discharge the sewage behind precipitating sludge places the top of inclined tube filler.
The bottom of above-mentioned bucket is provided with the shore pipe that the mud that is used for regularly will being sunken to bucket is drained.
The utility model is owing to the structure that adopts coagulation tank, flocculation groove, settling bath to be combined into one, and simple in structure, floor space is little, and cost is low.The utility model is limited at the environmental protection infusion of financial resources of small processing factory, and the problem that floor space is in short supply has reduced factory's environmental protection investments expense effectively.In addition, coagulation tank of the present utility model, flocculation groove, settling bath adopt high-quality PP plate to do equipment body, PP is anticorrosion for the outsourcing of steel skeleton, because PP plate superior corrosion resistance energy, has also solved the integrated steel settling apparatus later stage and has caused the problem that maintenance cost is high because of corrosion.The utility model is applicable to small-sized sewage treating system, is more suitable in factory site in short supplyly, is unwilling to employ civil engineering structures or Sewage treatment systems and requires situation about putting into operation at short notice.The utility model is a kind of reasonable in design, and operation expense is low, and convenient and practical integrated sewage water is handled the precipitation associated plant.
Description of drawings
Fig. 1 is the plot plan of the utility model equipment;
Fig. 2 is the cut-away view of the utility model settling bath.
Wherein 1 be coagulation tank, 2 for the flocculation groove, 3 for settling bath, 4 for the cloth tank, 5 for drainage tray, 6 for the cloth pool, 7 for bucket, 8 for the inclined tube filler, 9 for shore pipe, 10 for water eliminator.
Embodiment
Embodiment:
Structural representation of the present utility model such as Fig. 1, shown in 2, integrated sewage water of the present utility model is handled the precipitation associated plant, include make sewage and the coagulating agent that communicate successively and carry out well-mixed coagulation tank 1, make sewage and flocculation agent carry out well-mixed flocculation groove 2, the settling bath 3 that is used for precipitating sludge, wherein be provided with cloth tank 4 in the settling bath 3, drainage tray 5, cloth pool 6, bucket 7, inclined tube filler 8, shore pipe 9, wherein cloth tank 4 places the top in cloth pool 6, sewage in the cloth tank 4 enters in the cloth pool 6 by overflow, be provided with water eliminator 10 between cloth pool 6 and the inclined tube filler 8, the bottom in cloth pool 6 communicates with the bottom of inclined tube filler 8, the bucket 7 that is used for collecting precipitation mud places the below of cloth pool 6 and inclined tube filler 8, and the drainage tray 5 that is used to collect and discharge the sewage behind precipitating sludge places the top of inclined tube filler 8.
In addition, the bottom of above-mentioned bucket 7 is provided with the shore pipe 9 that the mud that is used for regularly will being sunken to bucket 7 is drained.
In the present embodiment, coagulation tank 1, flocculation groove 2, settling bath 3 adopt high-quality PP plates to do equipment body, and the measure of steel skeleton outsourcing PP rot-resistant improves the mentality of designing of traditional settling tank simultaneously, save 25% material and also reach identical treatment effect.
Principle of work of the present utility model is as follows: as shown in Figure 1, sewage is pumped into earlier in the coagulation tank 1 by pump, in coagulation tank 1, the coagulated agent thorough mixing of sewage and adding begins to take shape tiny deposit seeds, and the sewage gravity flow enters in the flocculation groove 2 then, 2 li of flocculation grooves, sewage and enter the further thorough mixing of flocculation agent, tiny deposit seeds progressively forms bigger alumen ustum under the effect of flocculation agent, more help follow-up precipitation.Sewage enters in the settling bath 3 shown in the accompanying drawing 2 after flocculating, and flows into earlier in the cloth tank 4 at settling bath 3, and overflows enter cloth pool 6 in the cloth tank 4, and through water eliminator, sewage is from the bottom upruss of inclined tube filler 8.In the process at upper reaches, the alumen ustum that coagulation-flocculation forms progressively precipitates, and major part is sunken in the bucket 7, and the small amount of precipitate particle is sunken to inclined tube filler 8.The water outlet of post precipitation is collected by drainage tray 5 and is discharged, and gets final product qualified discharge, and the mud that is sunken in the bucket 7 needs regularly to drain by shore pipe 9, and the mud that is deposited on the inclined tube filler 8 needs periodic flushing that it is drained, to improve deposition efficiency.

Claims (2)

1. an integrated sewage water is handled the precipitation associated plant, it is characterized in that including make sewage and the coagulating agent that communicate successively and carry out well-mixed coagulation tank (1), make sewage and flocculation agent carry out well-mixed flocculation groove (2), the settling bath (3) that is used for precipitating sludge, wherein be provided with cloth tank (4) in the settling bath (3), drainage tray (5), cloth pool (6), bucket (7), inclined tube filler (8), shore pipe (9), water eliminator (10), wherein cloth tank (4) places the top of cloth pool (6), sewage in the cloth tank (4) enters in the cloth pool (6) by overflow, be provided with water eliminator (10) between cloth pool (6) and the inclined tube filler (8), the bottom in cloth pool (6) communicates with the bottom of inclined tube filler (8), the bucket (7) that is used for collecting precipitation mud places the below of cloth pool (6) and inclined tube filler (8), and the drainage tray (5) that is used to collect and discharge the sewage behind precipitating sludge places the top of inclined tube filler (8).
2. integrated sewage water according to claim 1 is handled the precipitation associated plant, and the bottom that it is characterized in that above-mentioned bucket (7) is provided with the shore pipe (9) that the mud that is used for regularly will being sunken to bucket (7) is drained.
CN2010206317296U 2010-11-25 2010-11-25 Integrated sewage treatment and sedimentation combination device Expired - Fee Related CN201914984U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206317296U CN201914984U (en) 2010-11-25 2010-11-25 Integrated sewage treatment and sedimentation combination device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206317296U CN201914984U (en) 2010-11-25 2010-11-25 Integrated sewage treatment and sedimentation combination device

Publications (1)

Publication Number Publication Date
CN201914984U true CN201914984U (en) 2011-08-03

Family

ID=44414792

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206317296U Expired - Fee Related CN201914984U (en) 2010-11-25 2010-11-25 Integrated sewage treatment and sedimentation combination device

Country Status (1)

Country Link
CN (1) CN201914984U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103837391A (en) * 2014-03-26 2014-06-04 马志明 Water quality monitoring water sample pre-treating device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103837391A (en) * 2014-03-26 2014-06-04 马志明 Water quality monitoring water sample pre-treating device

Similar Documents

Publication Publication Date Title
CN104174191B (en) Integral grit chamber for treating rainwater and treating method
CN107130663A (en) Construction site water recycling system and method
CN204689755U (en) The comprehensive treating pond of construction site Water Sproading cyclic utilization system and construction site Water Sproading cyclic utilization system
CN203095806U (en) Multifunctional rainwater collecting, treating and recycling device
CN208072577U (en) Construction site rainwater recycle utilizes system
CN102198967B (en) Method and tower for quickly precipitating papermaking sewage
CN203878648U (en) Multifunctional rainwater collecting system
CN206368078U (en) A kind of coal yard wastewater recycling system with oil interceptor
CN206408007U (en) A kind of groundwater remediation device
CN201914984U (en) Integrated sewage treatment and sedimentation combination device
CN203989972U (en) A kind of integrated setting pot of processing rainwater
CN204689696U (en) Integration precipitation process system
CN207376783U (en) A kind of non-buried rainwater treatment device
CN203060904U (en) Improved advection setting device
CN207142894U (en) System for coal mine water process
CN206337062U (en) Integrated electric flocculation full automatic water purifier
CN202237406U (en) Automatic clarificator
CN208916952U (en) Mine water integrated combination settler
CN203469560U (en) Site sewage collection and treatment tank of coal preparation plants
CN209033829U (en) A kind of sedimentation pond for water treatment
CN206368079U (en) A kind of coal yard wastewater recycling system
CN203701248U (en) Comprehensive recycling device for waste water resource of thermal power plant
CN207361961U (en) A kind of municipal sewage environmental protection precipitation treatment device
CN205035231U (en) Golf course domestic water processing apparatus
CN219567670U (en) Sewage treatment system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: Science Avenue, Guangzhou Science City 510663 Guangdong Province, Guangzhou City Department of Jingu Kehui Street No. 11 a 202

Patentee after: VISION ENVIRONMENT (GUANGZHOU) CO., LTD.

Address before: Two cross road 510655 Guangdong city of Guangzhou province Tianhe District village of Dong Jing garden E block 1503

Patentee before: Vision Environment (Guangzhou) Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110803

Termination date: 20191125