CN201896385U - Roof structure - Google Patents

Roof structure Download PDF

Info

Publication number
CN201896385U
CN201896385U CN2010206378590U CN201020637859U CN201896385U CN 201896385 U CN201896385 U CN 201896385U CN 2010206378590 U CN2010206378590 U CN 2010206378590U CN 201020637859 U CN201020637859 U CN 201020637859U CN 201896385 U CN201896385 U CN 201896385U
Authority
CN
China
Prior art keywords
roof structure
grid
top board
gripper shoe
brace summer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010206378590U
Other languages
Chinese (zh)
Inventor
秦升益
秦申二
马金奎
贾屹海
王欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Rechsand Science and Technology Group Co Ltd
Original Assignee
Beijing Rechsand Science and Technology Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Rechsand Science and Technology Group Co Ltd filed Critical Beijing Rechsand Science and Technology Group Co Ltd
Priority to CN2010206378590U priority Critical patent/CN201896385U/en
Application granted granted Critical
Publication of CN201896385U publication Critical patent/CN201896385U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model provides a roof structure which comprises a grid and a top plate. The top plate is covered on the grid; the grid comprises a plurality of first supporting beams which are distributed in parallel; the first supporting beam adopts a metal tubular piece; and concrete is cast in the metal tubular piece. By adopting the technical scheme, the roof structure with higher strength is realized through a simple structure, and the grid is simple to manufacture, therefore, the roof structure is convenient to build, the work efficiency is improved, and the labor intensity of constructors is reduced.

Description

Roof structure
Technical field
The utility model relates to building field, particularly, relates to a kind of roof structure of house.
Background technology
At present, in field of house buildings, roof structure is varied, is adapted to different building structures, and the specific (special) requirements in house environment of living in and house etc. can be used different roof structures.
Though roof structure is varied, it all is made up of braced structures and covered structure usually.For existing various roof structures, if the intensity of roof structure is higher, its building course is will be comparatively complicated, does not need too high intensity usually for the roof structure in common house or highly less house; If roof structure is simple in structure, be convenient to build, will influence the intensity of roof structure so greatly, in some cases even can not satisfy the whole requirement in house.
The utility model content
The purpose of this utility model provides a kind of roof structure of house, and the grid in this roof structure is arranged on the body of wall in house and gripper shoe.
To achieve these goals, the utility model provides a kind of roof structure of house, this roof structure comprises grid and top board, this top board covers on the described grid, described grid comprises many first brace summers that are arranged in parallel with each other, this first brace summer is a tubular metal spare, has built concrete in this tubular metal spare.
By technique scheme, utilize simple structure just to realize the roof structure that intensity is higher, and the making of grid is simple, therefore made things convenient for the roof structure construction, improved operating efficiency, reduced constructor's labour intensity.
Other feature and advantage of the present utility model will partly be described in detail in the specific embodiment subsequently.
Description of drawings
Accompanying drawing is to be used to provide further understanding of the present utility model, and constitutes the part of manual, is used from explanation the utility model with the following specific embodiment one, but does not constitute restriction of the present utility model.In the accompanying drawings:
Fig. 1 is the schematic diagram of grid that the roof structure of the utility model preferred implementation is set on body of wall.
Description of reference numerals
10 bodies of wall, 20 grids
The specific embodiment
Below in conjunction with accompanying drawing the specific embodiment of the present utility model is elaborated.Should be understood that the specific embodiment described herein only is used for description and interpretation the utility model, is not limited to the utility model.
In the utility model, under the situation of not doing opposite explanation, the noun of locality of use as " on ", D score typically refers to upper and lower on the vertical direction, can understand in conjunction with the accompanying drawings.
Fig. 1 is the schematic diagram that the grid of roof structure of the present utility model is set on body of wall.
The roof structure in a kind of house of the present utility model is supported by wall body structure, wherein, this roof structure comprises grid 20 and top board, this top board covers on the described grid 20, described grid 20 comprises many first brace summers that are arranged in parallel with each other, this first brace summer is a tubular metal spare, has built concrete in this tubular metal spare.
The constructor can be provided with grid 20 and lay top board according to the utility model at an easy rate, has improved efficiency of construction.
Usually, the beam of level is arranged on the building block of body of wall, thus grid link to each other with beam by connector, but the beam weight of directly bearing roof structure in this case.Therefore, more preferably, as shown in Figure 1, only shown the embodiment by body of wall 10 supportive grid 20 among the figure, formed horizontal through hole in the body of wall of support roof structure in the utility model, beam is arranged in the horizontal through hole, and this moment, grid 20 was arranged on the described body of wall.Like this, bear the weight of roof structure, so improved the stability that supports by body of wall.
Preferably, described grid 20 also comprises many second brace summers that are arranged in parallel with each other, and this second brace summer is perpendicular to described first brace summer, and described many second brace summers and described many first fixed to one another connections of brace summer.More preferably, described second brace summer is a tubular metal spare, has built concrete in this tubular metal spare.
In order to strengthen the support strength of grid 20 of the present invention, be provided with first brace summer and second brace summer in the preferred implementation of the present invention mutually with disposing, and two kinds of brace summers all are preferably tubular metal spare, in this tubular metal spare, can improve the intensity of brace summer greatly after the concreting, thereby further improve the intensity of grid 20 of the present invention.
Need to prove that in addition this first brace summer and second brace summer can the layering settings, that is to say the second/the first brace summer is set, and interconnect between the two-layer brace summer on the first/the second brace summer; In addition, first brace summer and second brace summer also can be in one plane arranged in a crossed manner, for example make the length of second brace summer equal spacing between adjacent two first brace summers, and such advantage is to improve the support strength of the brace summer on the plane.
Preferably, described top board has at least one lug boss, and this at least one lug boss is arranged on the soffit of described top board, described lug boss and described grid 20 snap-fit; Perhaps
Described top board has depressed part, and this depressed part is arranged on the soffit of described top board, and described grid 20 is clamped in the described depressed part.
In above-mentioned first kind of preferred implementation, the soffit of top board has at least one lug boss, when on grid 20, laying top board, make this lug boss be clamped between adjacent two first or second brace summer (divide two-layer setting or be arranged on for first brace summer and second brace summer and all be suitable for) with the situation on one deck, thereby prevent that top board from moving with respect to grid, form spacing.
And for another kind of preferred implementation, the soffit of top board has depressed part, first and/or second brace summer (first brace summer and second brace summer divide two-layer setting or be arranged on on one deck) is clamped in this depressed part, can play the effect that prevents that top board from moving with respect to grid equally, form spacing.
Preferably, described top board comprises gripper shoe, and this gripper shoe is laid on the described grid 20.More preferably, described gripper shoe is a metal sheet, and perhaps described gripper shoe comprises the polylith metal sheet of splicing each other.The gripper shoe of top board mainly plays the effect of other parts that support the above top board of this gripper shoe, therefore select the metal sheet of rigidity usually, and according to the area in house, this metal sheet can be spliced by the polylith metal sheet.
Preferably, described top board also comprises cover plate, and this cover plate covers on the described gripper shoe.More preferably, described cover plate is a concrete slab, and this concrete slab is laid on the described gripper shoe.Because it is all multi-functional that building structure will play thermal insulation waterproof etc., therefore also need on gripper shoe, lay one deck cover plate, this cover plate can be that prefabricated concrete slab directly covers on this gripper shoe, also can directly build to form on gripper shoe.
Below describe preferred implementation of the present utility model in conjunction with the accompanying drawings in detail; but; the utility model is not limited to the detail in the above-mentioned embodiment; in technical conceive scope of the present utility model; can carry out multiple simple variant to the technical solution of the utility model, these simple variant all belong to protection domain of the present utility model.
Need to prove in addition, each concrete technical characterictic described in the above-mentioned specific embodiment under reconcilable situation, can make up by any suitable manner, for fear of unnecessary repetition, the utility model is to the explanation no longer separately of various possible compound modes.
In addition, also can make up arbitrarily between the various embodiment of the present utility model, as long as it is without prejudice to thought of the present utility model, it should be considered as content disclosed in the utility model equally.

Claims (8)

1. roof structure, it is characterized in that, this roof structure comprises grid (20) and top board, this top board covers on the described grid (20), described grid (20) comprises many first brace summers that are arranged in parallel with each other, this first brace summer is a tubular metal spare, has built concrete in this tubular metal spare.
2. roof structure according to claim 1, it is characterized in that, described grid (20) also comprises many second brace summers that are arranged in parallel with each other, and this second brace summer is perpendicular to described first brace summer, and described many second brace summers and described many first fixed to one another connections of brace summer.
3. roof structure according to claim 2 is characterized in that, described second brace summer is a tubular metal spare, has built concrete in this tubular metal spare.
4. roof structure according to claim 1 and 2 is characterized in that described top board has at least one lug boss, and this at least one lug boss is arranged on the soffit of described top board, described lug boss and described grid (20) snap-fit; Perhaps
Described top board has depressed part, and this depressed part is arranged on the soffit of described top board, and described grid (20) is clamped in the described depressed part.
5. roof structure according to claim 1 is characterized in that described top board comprises gripper shoe, and this gripper shoe is laid on the described grid (20).
6. roof structure according to claim 5 is characterized in that, described gripper shoe is a metal sheet, and perhaps described gripper shoe comprises the polylith metal sheet of splicing each other.
7. roof structure according to claim 5 is characterized in that described top board also comprises cover plate, and this cover plate covers on the described gripper shoe.
8. roof structure according to claim 7 is characterized in that, described cover plate is a concrete slab, and this concrete slab is laid on the described gripper shoe.
CN2010206378590U 2010-09-17 2010-11-26 Roof structure Expired - Lifetime CN201896385U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206378590U CN201896385U (en) 2010-09-17 2010-11-26 Roof structure

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201020541956 2010-09-17
CN201020541956.X 2010-09-17
CN2010206378590U CN201896385U (en) 2010-09-17 2010-11-26 Roof structure

Publications (1)

Publication Number Publication Date
CN201896385U true CN201896385U (en) 2011-07-13

Family

ID=44254297

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206378590U Expired - Lifetime CN201896385U (en) 2010-09-17 2010-11-26 Roof structure

Country Status (1)

Country Link
CN (1) CN201896385U (en)

Similar Documents

Publication Publication Date Title
CN206015895U (en) Prefabricated assembled detachable one off houses
CN203080965U (en) Intelligent steel structure anti-seismic villa
CN109083308B (en) Anti-seismic prefabricated assembly type wall and construction method thereof
CN201635421U (en) Large-sized detachable plank house
TN2009000500A1 (en) Automatic system for construction o f buildings
CN104213717A (en) Integrated reconstruction method for multi-storey residential
CN201972417U (en) Lightweight wood structure roof system
CN202000687U (en) Existing earth building earth wall body reinforcing device through wooden columns and wooden beams
CN201896385U (en) Roof structure
RU2410511C2 (en) House that floats during flood
ES2858339T3 (en) A process for manufacturing a building structure and a building structure obtained by means of said process using a lightweight conglomerate comprising a granular inert material, vegetable fibers and hydraulic lime
JP5226295B2 (en) Building structure
RU2014125844A (en) ADVANCED DESIGN BEAM, CONSTRUCTION SYSTEM USING THE SPECIFIED ADVANCED BEAM AND DESIGN METHOD
CN203856101U (en) Lightgage steel joist frame
CN206941926U (en) A kind of floor based on bamboo matter
CN204876206U (en) Portable wallboard system
CN114045947B (en) Bearing system combining heat-preservation ceiling and light steel roof truss
RU131039U1 (en) ENERGY-SAVING HOUSE
CN219261316U (en) Bottom reinforced concrete frame plus department type rigid frame structure
CN202882205U (en) Light-weight load-bearing building wall body board with steel meshes
CN212478194U (en) Shear wall composite structure of steel structure
Chilton Solid timber in carbon neutral construction in the UK
CN202596236U (en) Precast block stack split mounting type house
CN106854903A (en) A kind of removable disaster relief room of antidetonation fire prevention
CN205242786U (en) Roof post web frame