CN201892950U - Engineering survey data processing system using total station - Google Patents
Engineering survey data processing system using total station Download PDFInfo
- Publication number
- CN201892950U CN201892950U CN2010206272632U CN201020627263U CN201892950U CN 201892950 U CN201892950 U CN 201892950U CN 2010206272632 U CN2010206272632 U CN 2010206272632U CN 201020627263 U CN201020627263 U CN 201020627263U CN 201892950 U CN201892950 U CN 201892950U
- Authority
- CN
- China
- Prior art keywords
- data
- total station
- data processing
- engineering survey
- survey data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000012545 processing Methods 0.000 title abstract description 11
- 230000008676 import Effects 0.000 claims abstract description 12
- 238000004458 analytical method Methods 0.000 claims abstract description 8
- 238000005259 measurement Methods 0.000 claims description 10
- 238000013461 design Methods 0.000 abstract description 7
- 230000008901 benefit Effects 0.000 abstract description 3
- 238000013507 mapping Methods 0.000 description 5
- 238000004364 calculation method Methods 0.000 description 4
- 238000006243 chemical reaction Methods 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000009466 transformation Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000007405 data analysis Methods 0.000 description 1
- 238000013479 data entry Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000035800 maturation Effects 0.000 description 1
- 108700039855 mouse a Proteins 0.000 description 1
- 230000008569 process Effects 0.000 description 1
Images
Landscapes
- Control By Computers (AREA)
Abstract
The utility model relates to an engineering survey data processing system using a total station, which comprises the total station, wherein the total station is connected with a computer with survey data import, processing and analysis functions through a data line. The engineering survey data processing system using the total station has the advantages that the structure is simple, the design is scientific and reasonable, the data processing speed is fast, the time is short, the labor intensity of workers is greatly reduced, and the survey work efficiency and the data processing capacity are improved.
Description
Technical field
The utility model belongs to the data handling system field, especially a kind of engineering survey data handling system of using total powerstation.
Background technology
In measuring, engineering construction has more problem, and the one, aspect mapping, the 2nd, aspect survey establishes.The problem that the mapping aspect runs into mainly is: ⑴ records the coordinate that data need hand computation institute measuring point, and record, the unavoidable mistake of calculating cause doing over again; ⑵ whether control survey in time error in judgement satisfies code requirement, in time adjustment; ⑶ draw engineering drawing needs artificial input coordinate could become figure, because the multidata amount of counting is big, and the error rate height, drawing efficiency is low.The problem that the aspect runs into is established in survey: ⑴ design coordinate system and actually select for use coordinate system not simultaneously, need carry out coordinate conversion, calculated amount is big, current coordinate Calculation mainly relies on Casio hand-manipulated counter, the error rate height, during the setting-out of inefficiency ⑵ curve, calculation of complex and workload are bigger, and these factors have seriously reduced the efficient and the data-handling efficiency of surveying work.
Summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art, a kind of engineering survey data handling system of using total powerstation is provided, this system design is scientific and reasonable, data processing speed is fast, time is short, greatly reduce hand labor intensity, improved surveying work efficient and data-handling capacity.
The utility model solves its technical matters and is achieved through the following technical solutions:
A kind of engineering survey data handling system of using total powerstation, its system comprises a total powerstation, this total powerstation connects one by data line and has the computing machine that measurement data imports the Treatment Analysis function.
Advantage of the present utility model and beneficial effect are:
1, should comprise a total powerstation with the engineering survey data handling system of total powerstation, this total powerstation connects one by data line and has the computing machine that measurement data imports the Treatment Analysis function, this system can realize that the total station survey data directly import in the computing machine with measurement data importing Treatment Analysis function, by computing machine fast processing measurement data, drawing data figure, save manpower, improved measurement data and deal with data efficient.
2, should have simple to operately with the engineering survey data handling system of total powerstation, can directly import total station survey gained data; Fundamental figure is drawn complete function; Data computation is accurate; . can export various forms according to the form of standard, form such as can directly print at advantage, improve engineering mapping surveying work personnel work efficiency greatly, by intelligent data analysis, data computation, alleviate mapping surveying work personnel's work load greatly, improve operating efficiency, reduce expenditure of time and job costs.Related data information is represented with Autocad graph data form, reduces the typing repeatedly of data message, guarantees consistance, accuracy and the intuitive of data.
3, the utility model is simple in structure, design science is reasonable, and data processing speed is fast, and the time is short, greatly reduces hand labor intensity, has improved surveying work efficient and data-handling capacity.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Embodiment
The utility model is described in further detail below by specific embodiment, and following examples are descriptive, is not determinate, can not limit protection domain of the present utility model with this.
A kind of engineering survey data handling system of using total powerstation, its system comprises a total powerstation 1, this total powerstation connects one by data line 2 and has the computing machine 3 that measurement data imports the Treatment Analysis function.
The data that the utility model is gathered total powerstation directly import has the computing machine that measurement data imports the Treatment Analysis function, and data are carried out quickness and high efficiency analysis and processing.
Data entry mode: can directly import the measured data of total station survey, need not manually import, only need mouse a bit just the data that measure can be opened up in the software and directly draw, settle at one go to calculating again from measuring importing software one-tenth figure.
Generate the DTM model, draw a contour line: behind the measurement data machine plotting with total powerstation, both can generate the DTM model automatically, and then draw a contour line, can carry out land deeds again, that landform mapping has realized that data become figure to build the storehouse is integrated, satisfies the needs that drawing of landform land deeds specialty and GIS build the storehouse simultaneously.Realized that really data production, graphics process, data build the storehouse and settle at one go.When generating the triangulation network, adopted up-to-date triangulation network growth algorithm, if dissatisfied, can also carry out edit-modify to the triangulation network to the triangulation network net type that generates.
The highway alignment Aided Design: the highway route design at different shape aspect Highway Auxiliary Design all has a cover solution.Engineering surveying software is to inquire about by the function of AutoCAD itself behind machine plotting, does not need to repeat input again.
Road vertical and horizontal section figure draws: technology maturation aspect the processing of road vertical and horizontal section data, and it is accurate to handle achievement, and it is clear to illustrate, and can directly print also and can edit in CAD, and operation tool on a series of figure is provided.Data are directly imported by Microsoft Excel.
Earthwork Calculation: utilize the square grid method of optimizing to carry out Earthwork calculation, fill out the excavation statistics in conjunction with figure, and can generate three-dimensional model.Can calculate dispersed elevation, from the animation zero line.Can calculate the dispersed elevation in place, any irregular border, and then calculate excavation and filling side.
Two kinds of coordinate conversion: on coordinate transformation, not only can handle the positive inverse of Gauss, can also handle three Parameters Transformation between the planar coordinate.Algorithm one is by input translational movement X, Y, and rotation angle is changed, and algorithm two is by common point inverse translational movement and rotation angle between two coordinates, converted coordinate then.Coordinate data after the conversion can be presented at the .dat form that also can be output as total station data in the software.
Traverse adjustment: can carry out adjustment to the control net in the engineering survey.With the length of side and angular error of closure is the adjustment foundation, can handle complete loop, echo lead.And automatically computational scheme length overall and mis-tie are carried out precision control.If measuring accuracy does not meet the level accuracy requirement of national Specification, software will eject prompting automatically.If measurement data meets accuracy requirement, software then is presented at adjustment result and control net figure in the software together.
Axis figure draws: the interval that drafting axis figure only need import between each horizontal longitudinal axis just can be finished, and the sign on the axis figure is to adopt national standard, axis figure can be added on plant area's planimetric map by the figure layer operation.
Claims (1)
1. engineering survey data handling system of using total powerstation, it is characterized in that: this system comprises a total powerstation, this total powerstation connects one by data line and has the computing machine that measurement data imports the Treatment Analysis function.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206272632U CN201892950U (en) | 2010-11-26 | 2010-11-26 | Engineering survey data processing system using total station |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206272632U CN201892950U (en) | 2010-11-26 | 2010-11-26 | Engineering survey data processing system using total station |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201892950U true CN201892950U (en) | 2011-07-06 |
Family
ID=44222421
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010206272632U Expired - Lifetime CN201892950U (en) | 2010-11-26 | 2010-11-26 | Engineering survey data processing system using total station |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201892950U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102733273A (en) * | 2012-07-05 | 2012-10-17 | 中铁上海工程局华海工程有限公司 | Method for adjusting control benchmark point of rail by means of approximate adjustment |
-
2010
- 2010-11-26 CN CN2010206272632U patent/CN201892950U/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102733273A (en) * | 2012-07-05 | 2012-10-17 | 中铁上海工程局华海工程有限公司 | Method for adjusting control benchmark point of rail by means of approximate adjustment |
CN102733273B (en) * | 2012-07-05 | 2014-10-29 | 中铁上海工程局集团华海工程有限公司 | Method for adjusting control benchmark point of rail by means of approximate adjustment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104091215B (en) | A kind of project planning management system based on BIM | |
CN105547301B (en) | Indoor map construction method based on earth magnetism and device | |
CN107010542B (en) | A kind of assembled architecture intelligence hanging method | |
CN104463717A (en) | Construction expert information system applicable to extra-large underground cavern group | |
CN102495413B (en) | Method for acquiring transmission line tower coordinate | |
CN205262429U (en) | Job site earth volume survey system | |
CN108009349B (en) | A Computational Grid Optimization Drawing Method for Two-dimensional Water Quality Numerical Simulation Model of Rivers | |
CN103500371A (en) | Change control method based on BIM | |
CN101685471A (en) | Highway route CAD aided design system | |
CN106097149A (en) | The method for designing of project of transmitting and converting electricity cost software based on BIM technology | |
CN109885966A (en) | The method of the conflict of sliding slot section of jurisdiction and preferred arrangement based on BIM technology | |
CN102073645B (en) | Virtual city model machine and operation method thereof | |
CN111879300A (en) | Method for monitoring collapse erosion development based on three-dimensional laser scanning technology | |
CN114739312B (en) | Hand-held type road surface structure degree of depth laser survey device | |
CN110765677B (en) | Modeling method of finite element model of high-precision and rapid three-dimensional geological model | |
CN109711680A (en) | River System Hydropower planing method based on GIS digitizing technique | |
CN110990923A (en) | Rapid engineering calculation method, system and medium for hyperbolic arch dam of water conservancy and hydropower engineering | |
CN106839980A (en) | Rockfill Dam material transporter amount monitoring method | |
CN101510273A (en) | Method for rapidly counting city planning earth area and computer program | |
CN102982494A (en) | A channel water depth information generation method based on electronic channel chart and water level data | |
CN103207923A (en) | Computer aided design method for vertical design of road plane intersection | |
CN201892950U (en) | Engineering survey data processing system using total station | |
CN201820263U (en) | Field pipeline data acquisition and update system based on topological relation | |
CN102968470B (en) | A kind of accurate calculating has the method for the gully head furrow bank metamorphosis of washing hole | |
CN201903653U (en) | Comprehensive treatment device for topographic survey in reclamation areas |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20110706 |