CN201889766U - Matching tooling of screw standard part - Google Patents
Matching tooling of screw standard part Download PDFInfo
- Publication number
- CN201889766U CN201889766U CN2010206433013U CN201020643301U CN201889766U CN 201889766 U CN201889766 U CN 201889766U CN 2010206433013 U CN2010206433013 U CN 2010206433013U CN 201020643301 U CN201020643301 U CN 201020643301U CN 201889766 U CN201889766 U CN 201889766U
- Authority
- CN
- China
- Prior art keywords
- screw
- orifice plate
- hole
- standard part
- pad
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Connection Of Plates (AREA)
Abstract
The utility model provides a matching tooling of a screw standard part, which mainly solves the problems of the prior art that, when a screw is assembled, the matching efficiency of manual operation is low, the specification of the screw standard part is wrong, and the screw standard part is easy to drop into a product. The matching tooling of the screw standard part comprises a stud sleeve hole plate, a gasket sleeve hole plate and a screw cap sleeve hole plate which are structurally matched; and the stud sleeve hole plate, the gasket sleeve hole plate and the screw cap sleeve hole plate are respectively provided with at least one hole which is structurally assembled with the part to be assembled, and the quantity of the holes on each sleeve hole plate is equal. Due to adoption of the matching tooling of the screw standard part, so that the matching quality of the screw standard part is improved, the screw standard part is effectively prevented from easily being fallen into the product, and the specification of the screw is wrong; and the matching difficulty of the screw standard part is simplified, the assembly efficiency is improved, different processing can be carried out according to different screw standard part specifications, and the applicability is very wide.
Description
Technical field
The utility model relates to the supporting frock of a kind of standard component, is specifically related to the supporting frock of a kind of screw standard component, is mainly used in the efficiency of assembling that improves screw.
Background technology
Screw is an industrial necessity indispensable in the daily life: as the minimum screw of uses such as camera, glasses, clock and watch, electronics; Screw as one of TV, electric product, musical instrument, furniture etc.; Then use large-scale screw as for engineering, building, bridge; Traffic utensil, aircraft, electric car, automobile etc. then are big Screw and use.
At present, on the machine assembling production lines, carry out plain cushion, bullet pad in the rigging screw process, when screw is supporting, because the volume of plain cushion, bullet pad, screw is less, easily falls in the product, causes the supporting inefficiency of screw, simultaneously, be retained in product if having plain cushion, bullet pad, screw etc. to fall in time not found in the product when inner, may cause machine construction and damage, when serious even cause casualties.
Summary of the invention
The supporting frock of screw standard component that the utility model provides, when mainly having solved in the prior art rigging screw, supporting efficient hand-manipulated is low, screw standard component specification mistake, screw standard component are easily fallen into the problem in the product.
Concrete technical solution of the present utility model is as follows:
The supporting frock of this screw standard component comprises the suitable double-screw bolt cover of structure orifice plate, pad cover orifice plate and spiro cap orifice plate; Described double-screw bolt cover orifice plate is provided with at least one and is assembled the suitable stud bolt hole of bolt structure, pad cover orifice plate is provided with at least one and is assembled the suitable pad hole of gasket construction, and the spiro cap orifice plate is provided with at least one and is assembled the suitable screw cap hole of nut structure; Stud bolt hole, pad hole equate with the quantity of screw cap hole.
Above-mentioned double-screw bolt cover orifice plate is provided with positioner, and pad cover orifice plate is provided with suitable locating hole; Or pad cover orifice plate is provided with positioner, and double-screw bolt cover orifice plate is provided with suitable locating hole.
Above-mentioned stud bolt hole is a through hole; Screw cap hole is a blind hole.
Above-mentioned double-screw bolt cover orifice plate is provided with 40 to 150 stud bolt holes.
Above-mentioned positioner is location-plate and/or reference column.
Advantage of the present utility model is:
The supporting frock of this screw standard component has improved the supporting quality of screw standard component, effectively prevents the screw standard component easily to fall into product inside and screw specification mistake; Simplify the supporting difficulty of screw standard component, improved efficiency of assembling.
The supporting frock of this screw standard component can be carried out different processing according to different screw standard component specifications, applicability very extensively.
Description of drawings
Fig. 1 is the utility model double-screw bolt cover orifice plate schematic diagram;
Fig. 2 is the utility model pad cover orifice plate schematic diagram;
Fig. 3 is the utility model spiro cap orifice plate schematic diagram.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described in detail:
The supporting frock of this screw standard component comprises the double-screw bolt cover orifice plate that structure is suitable, and as shown in Figure 1, pad overlaps orifice plate as shown in Figure 2, and the spiro cap orifice plate as shown in Figure 3;
Double-screw bolt cover orifice plate 1 is provided with at least one and is assembled the suitable stud bolt hole of bolt structure 11, stud bolt hole 11 is through holes, pad cover orifice plate 2 is provided with at least one and is assembled the suitable pad hole 21 of gasket construction, pad hole 21 also is a through hole, spiro cap orifice plate 3 is provided with at least one and is assembled the suitable screw cap hole of nut structure 31, and screw cap hole 31 is blind holes; Based on the consideration of erecting yard actual conditions generally double-screw bolt cover orifice plate 1 be provided with 40 to 150 stud bolt holes 11, stud bolt hole 11, pad hole 21 equate with the quantity of screw cap hole 31.
Because the aperture of the stud bolt hole 11 on the double-screw bolt cover orifice plate 1 is less than the aperture in pad cover orifice plate 2 Upper gasket holes 21, for each hole that makes double-screw bolt cover orifice plate 1, pad cover orifice plate 2 directly all can be suitable, double-screw bolt cover orifice plate 1 is provided with the positioner 12 of pad cover orifice plate 2, and this positioner can be reference column or location-plate; Pad cover orifice plate 2 is provided with the locating hole 22 corresponding with positioner 12 positions simultaneously.
During use, earlier pad is overlapped orifice plate 2 and be arranged on the double-screw bolt cover orifice plate 1,, then be equipped with by positioner 12 if be provided with positioner 12; After the installation, earlier pad is lain against in the pad hole 21, then the double-screw bolt of screw is partly inserted in the stud bolt hole 11 on the double-screw bolt cover orifice plate 1, after screw and pad are laid and are finished, spiro cap orifice plate 3 is installed on double-screw bolt cover orifice plate 1 and the pad cover orifice plate 2, and the nut part that makes each screw is all in screw cap hole 31; At last double-screw bolt cover orifice plate 1, screw, pad cover orifice plate 2 and spiro cap orifice plate 3 integral body are overturn, make it anteposition and now be positioned at the top in the double-screw bolt cover orifice plate 1 of below, and the spiro cap orifice plate 3 that is positioned at the top before now is positioned at below, takes down double-screw bolt cover orifice plate 1 and pad cover orifice plate 2 then; At this moment, because screw cap hole 31 is blind hole, the equal double-screw bolt of then all screws also overlaps up and connects pad.
When a large amount of the use, avoided each screw is carried out manual socket assembling, can directly install with instrument, improved efficiency of assembling greatly; Simultaneously, can the different supporting frocks of screw standard component be set according to different screws and pad model, applicability is very extensive.
Claims (6)
1. the supporting frock of screw standard component is characterized in that: comprise the suitable double-screw bolt cover of structure orifice plate, pad cover orifice plate and spiro cap orifice plate; Described double-screw bolt cover orifice plate is provided with at least one and is assembled the suitable stud bolt hole of bolt structure, pad cover orifice plate is provided with at least one and is assembled the suitable pad hole of gasket construction, and the spiro cap orifice plate is provided with at least one and is assembled the suitable screw cap hole of nut structure; Stud bolt hole, pad hole equate with the quantity of screw cap hole.
2. the supporting frock of screw standard component according to claim 1 is characterized in that: described double-screw bolt cover orifice plate is provided with positioner, and pad cover orifice plate is provided with suitable locating hole.
3. the supporting frock of screw standard component according to claim 1 is characterized in that: described pad cover orifice plate is provided with positioner, and double-screw bolt cover orifice plate is provided with suitable locating hole.
4. according to the supporting frock of the arbitrary described screw standard component of claim 1 to 3, it is characterized in that: described stud bolt hole is a through hole; Screw cap hole is a blind hole.
5. the supporting frock of screw standard component according to claim 4 is characterized in that: described double-screw bolt cover orifice plate is provided with 40 to 150 stud bolt holes.
6. the supporting frock of screw standard component according to claim 5 is characterized in that: described positioner is location-plate and/or reference column.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206433013U CN201889766U (en) | 2010-12-06 | 2010-12-06 | Matching tooling of screw standard part |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206433013U CN201889766U (en) | 2010-12-06 | 2010-12-06 | Matching tooling of screw standard part |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201889766U true CN201889766U (en) | 2011-07-06 |
Family
ID=44219242
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010206433013U Expired - Fee Related CN201889766U (en) | 2010-12-06 | 2010-12-06 | Matching tooling of screw standard part |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201889766U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102431010A (en) * | 2011-10-28 | 2012-05-02 | 苏州金牛精密机械有限公司 | Spring assembly tool |
CN103878744A (en) * | 2014-04-15 | 2014-06-25 | 成都四威高科技产业园有限公司 | Method for rapidly penetrating screw gaskets in sleeved mode |
CN103878734A (en) * | 2014-04-15 | 2014-06-25 | 成都四威高科技产业园有限公司 | Tool for rapidly penetrating screw gaskets in sleeved mode |
-
2010
- 2010-12-06 CN CN2010206433013U patent/CN201889766U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102431010A (en) * | 2011-10-28 | 2012-05-02 | 苏州金牛精密机械有限公司 | Spring assembly tool |
CN103878744A (en) * | 2014-04-15 | 2014-06-25 | 成都四威高科技产业园有限公司 | Method for rapidly penetrating screw gaskets in sleeved mode |
CN103878734A (en) * | 2014-04-15 | 2014-06-25 | 成都四威高科技产业园有限公司 | Tool for rapidly penetrating screw gaskets in sleeved mode |
CN103878734B (en) * | 2014-04-15 | 2015-06-17 | 成都四威高科技产业园有限公司 | Tool for rapidly penetrating screw gaskets in sleeved mode |
CN103878744B (en) * | 2014-04-15 | 2016-03-23 | 成都四威高科技产业园有限公司 | A kind of method wearing screw gasket fast |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201889766U (en) | Matching tooling of screw standard part | |
CN204206664U (en) | A kind of band anti-vibration of electronic product and the device of grounding function | |
CN202756199U (en) | Compressor foot pad and air-conditioning unit | |
CN201934686U (en) | Valve seat connecting structure for electronic expansion valves | |
CN201995236U (en) | Case | |
CN202579574U (en) | Movable nut plate assembly and vehicle | |
CN203622279U (en) | Assembly tool for realizing coaxial clamping of two parts | |
CN202528091U (en) | Tool equipment for assembling upper shell of executor motor | |
CN204320920U (en) | A kind of material pressing core with die case | |
CN103236756B (en) | For the motor flange dish fixed jig of tipper | |
CN204495873U (en) | Electric energy meter | |
CN204165136U (en) | Electrical heating installation component | |
CN203618225U (en) | Electric vehicle controller MOS pipe installation structure | |
CN203843993U (en) | Aluminum mold embedded part fixing frame | |
CN103635055B (en) | A kind of fixing demountable structure of automobile electrical equipment box big current terminal | |
CN201837665U (en) | Housing tool for electric energy meters | |
CN201601578U (en) | Alternating-current generator stator lead connecting structure for automobiles | |
CN202217761U (en) | Mounting structure of locating pin of cavity of filter | |
CN202076152U (en) | Switch mounting structure of electric fan | |
CN204633098U (en) | A kind of new Joining Structure | |
CN202656982U (en) | Structure for connecting grating wisp and front grating main body of electric bicycle | |
CN202418172U (en) | Special shockproof mounting bolt for electrical box | |
CN201936067U (en) | Retrofitted structure for microscope base | |
CN201858683U (en) | Gas stove shell | |
CN209399874U (en) | Cubing for TV outline border ornamental strip |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110706 Termination date: 20151206 |
|
EXPY | Termination of patent right or utility model |