CN201883611U - Prestress steel pole intelligent anchoring system used for monitoring the pretightening force dynamic of the strengthening engineering - Google Patents

Prestress steel pole intelligent anchoring system used for monitoring the pretightening force dynamic of the strengthening engineering Download PDF

Info

Publication number
CN201883611U
CN201883611U CN201020232149XU CN201020232149U CN201883611U CN 201883611 U CN201883611 U CN 201883611U CN 201020232149X U CN201020232149X U CN 201020232149XU CN 201020232149 U CN201020232149 U CN 201020232149U CN 201883611 U CN201883611 U CN 201883611U
Authority
CN
China
Prior art keywords
steel pole
prestressing force
section
force steel
anchoring system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201020232149XU
Other languages
Chinese (zh)
Inventor
杨滔
钟新谷
沈明燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University of Science and Technology
Hunan University of Science and Technology
Original Assignee
Hunan University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan University of Science and Technology filed Critical Hunan University of Science and Technology
Priority to CN201020232149XU priority Critical patent/CN201883611U/en
Application granted granted Critical
Publication of CN201883611U publication Critical patent/CN201883611U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a prestress steel pole intelligent anchoring system used for monitoring the pretightening force dynamic of the strengthening engineering. The anchoring system comprises a steel pole implanted in the selected strengthening object, a supporting plate and nuts, wherein the steel pole, the supporting plate and the nuts enable the steel pole embedded section and the strengthening object to be bonded and tensioned to form a prestress steel pole; the steel pole embedded section comprises an anchoring section and a free section; the outer end of the prestress steel pole is provided with an exposed section; the top end of the exposed section is provided with an acceleration transducer and a vibration exciter; the acceleration transducer is connected with an intelligent dynamometer which is internally provided with a signal collector, a signal analysis device, a multifunctional calculator program card, a rechargeable battery and a control mainboard. Due to the technical solution, the anchoring system overcomes the defects that the existing system is high in using cost, inconvenient in operation and maintenance, low in testing accuracy, complex in testing device, low in integrated level and narrow in application range, and can not realize large-area detection on the prestress construction quality on site and avoid anchor rod failure caused by overlarge prestress loss or not in-place tensioning, and the like; and the intelligent anchoring system is suitable for the prestress anchoring system strengthening engineering needing large-area monitoring.

Description

The dynamic prestressing force steel pole of monitoring strengthening engineering preload intelligent anchoring system
Technical field
The utility model relates to the dynamic prestressing force steel pole of a kind of monitoring strengthening engineering preload intelligent anchoring system.
Background technology
Pre existing stress stabilization works technology is developed and be applied to rapidly speedway, the city is big-and-middle strides in footpath concrete continuous (structure just) the box girder bridge structural system.It has that the rigidity of structure is big, driving is smooth-going, the shrinkage joint is few, maintenance costs is low, be applicable to advantage such as multiple span.In order to reduce and control cabinet web principal tensile stress, prevent the web concrete cracking, at the case web vertical prestressing bar being set has become one of important content of design.Prick indented bars as concrete box girder web vertical presstressed reinforcing steel with essence, it has connection and is not subjected to the welding constraint, anchoring is convenient, construction is simple, the intensity height, advantages such as relaxation property is good have been built and are striden prestressed concrete that the footpath surpasses 100m at the single span of building and use the smart indented bars vertical prestressing system of pricking continuously in (structure just) box girder bridge beam and reached more than hundreds of seats to China so far.Its weak point is that many concrete box-beam bridges are being constructed and operation process median ventral plate or existence cracking in various degree, and especially the web of large span prestressed concrete box girder bridge is apparent in view.In order to solve this difficult problem, people attempt to adopt and apply web vertical prestressing force preventing the cracking of concrete box beam bridge web, but effect is not really desirable.Trace it to its cause, to be that initial tensioning is not in place for the first time cause the principal element that causes vertical pre-stress rib stretching force to lose efficacy.Because vertical prestressing bar is short, the relative longitudinal prestressing muscle of elongation is much smaller in the stretching process, and One's name is legion (is striden for 100 meters, generally more than 2000), after stretch-draw, only depend on and manually tighten the anchoring nut and be difficult to obtain the design stretching force, if it is not enough to tighten the fastening dynamics of anchoring nut, almost failure phenomenon will appear, and vertical prestressing bar has just become ornaments.Even by calculating the torque value that to determine fastening nut, adopts the torque wrench fastening nut, or adopt two times tensioning, but artificial factor is still very big.
Pre existing stress stabilization works technology is applied to the structure that the high-strength fastening bolt in the high-strength mobile load steel work of high frequency such as trussed bridge, rail beam combines with nut, and its nut is loosening easily in long-term use; Only can determine that torque coefficient guarantees initial pretightning force with the way of setting initial torque at present, and can't determine, and the bolt that finishes to just constructing also can't be made quantitative assessment for the pretightning force in the use by laboratory test; Bearing cast steel supporter is the important structure parts that connect PC rail beam and pier, the upper end that bears cast steel supporter is cast in the PC rail beam body, and the lower end is to be fixed on the pier by the anchorage screw that four long 950 mm, diameters are 36 mm, and the mounting torque of anchorage screw is 800 Nm.Owing to bear the particularity of cast steel supporter mounting structure, in case after bearing was fixed on the pier, the anchorage screw that connects concrete pier base and bearing just was fixed in the steel anchor case of pier inside.So, in the operation security maintenance process of daily rail beam circuit, just being difficult to grasp the situation of change that they are used safely in pier anchor case, this is whether the very difficult PC of grasp rail beam structural system is in the one of the main reasons in the safe handling scope.Moreover, light rail is built employed anchorage screw in forging and machine and heat treatment process on the one hand, though in each technological process of processing, taked strict quality inspection measure, but the small manufacturing deficiency that exists in anchorage screw and other primary structure members is still had higher requirement to check, in case have the anchorage screw of small manufacturing deficiency and primary structure member not to detect, potential safety hazard just can not in time be found and be got rid of.In addition, natural conditions are also used the durability of hardware and are produced corresponding influence.Therefore, how grasping situations such as the fatigue of anchorage screw in the anchor case, fracture, loosening or corrosion variation is to guarantee the key factor of PC rail beam structural system safety.Working environment just because of anchorage screw is under the shielding of concrete and steel anchor case, and general ray detection is impossible, and its stressing conditions complexity, and the quantity of monitoring is huge, so general non-destructive monitoring method difficulty is big, efficient is low.According to the data of grasping in the past, anchorage screw " health " situation in the anchor case is unknown, serious potential safety hazard that Here it is.Still use the periodic maintenance service technique in the conventional P C rail beam structural system operation process not satisfy its security requirement.And present detection method has by sensor installation, pastes convert prestressing force and oil meter of acquisitions strains such as foil gauge, steel pole boring sound ranging and control method and habitual pull-out test etc.
The sensor as aforementioned detection method, used number of sensors is more, for then cost is too high than large-engineering, is only applicable to scientific research; Aforementioned subsides foil gauge detection method, troublesome poeration disturbs construction and inconvenient, can not reuse, and only is suitable for scientific research among a small circle; Aforementioned steel pole boring sound ranging detection method need be holed at steel pole, and be measured initial length, requires end face smooth, troublesome poeration, and accuracy is not high; Also have oil meter control method, loss is judged coarse, its precision is on the low side and size that can not the long term monitoring anchor rod prestress; Habitual pull-out test only can be coarse estimation anchor pole bearing capacity, can not play the effect of dynamic monitoring, and belong to damageability and detect, adaptive surface is narrow.In addition, the detection method of concrete box girder bridge web vertical pre-stress rib stretching force is to adopt the pre-buried pore-forming of corrugated bushing at concrete box girder bridge characteristics, and range of application is narrow, and its computation model is to calculate with energy method, and it influences measuring accuracy; The accounting equation that vertical prestressing anchoring system is only arranged in its calculation procedure, the pretightning force that is not suitable for other clamp structures such as anchor pole, anchor cable and bolt detects; The testing arrangement of this detection method is numerous and jumbled, and integrated level is not high, and on-the-spot will be equipped with more accessory and could work.
Summary of the invention
At above-mentioned situation, the purpose of this utility model provides the dynamic prestressing force steel pole of a kind of monitoring strengthening engineering preload intelligent anchoring system, and this intelligent anchoring system is simple in structure, convenient operating maintenance, it can not only adapt to large tracts of land and detect requirement, and it is low to detect cost, the measuring accuracy height, and system adapts to wide, function is many, compliance is strong, and is safe and reliable, is convenient to penetration and promotion.
For solving above-mentioned task, survey the dynamic prestressing force steel pole of strengthening engineering preload intelligent anchoring system, it is included in selected reinforcing object and is implanted into steel pole and supporting plate and nut, make pre-buried section of steel pole with reinforce object in conjunction with and become the prestressing force steel pole through stretch-draw, steel pole comprises anchoring section and free section for pre-buried section, in prestressing force steel pole outer end revealed section is set, establish an acceleration transducer and click resonator in this revealed section top end, acceleration transducer is connected with intelligent dynamometer, built-in signal collector in this intelligent dynamometer, signal analysis device, multi-functional calculation procedure card, rechargeable battery and control main board.
For implementation structure optimization and precision raising, its further measure is.
Anchoring section in pre-buried section of the steel pole is the well cementing anchoring with reinforcing the mode that object combines.
Anchoring section in pre-buried section of the steel pole is the concrete cast-in-situ anchoring with reinforcing the mode that object combines.
Prestressing force steel pole revealed section length is the long L of nut end face to prestress steel bar top end 2Should be greater than 4 times of prestress steel shank diameter.
The material that the prestressing force steel pole is pre-buried section is to select for use rigid material to make.
The rigid material that the prestressing force steel pole is pre-buried section is an indented bars.
The material that the prestressing force steel pole is pre-buried section is to select for use flexible material to make.
The flexible material that the prestressing force steel pole is pre-buried section is a cable wire.
The utility model adopts the dynamic prestressing force steel pole of monitoring strengthening engineering preload intelligent anchoring system, it is included in selected reinforcing object and is implanted into steel pole and supporting plate and nut, make pre-buried section of steel pole with reinforce object in conjunction with and become the prestressing force steel pole through stretch-draw, steel pole comprises anchoring section and free section for pre-buried section, in prestressing force steel pole outer end revealed section is set, establish an acceleration transducer and click resonator in this revealed section top end, acceleration transducer is connected with intelligent dynamometer, built-in signal collector in this intelligent dynamometer, signal analysis device, multi-functional calculation procedure card, the technical solution of rechargeable battery and control main board, overcome the dynamic prestressing force steel pole of existing monitoring strengthening engineering preload intelligent anchoring system use cost height, the Operation and Maintenance inconvenience, measuring accuracy is low, and testing arrangement is numerous and jumbled, integrated level is low, range of application is narrow, can not satisfy on-the-spot the pretightning force construction quality to be carried out that large tracts of land detects and the excessive or stretch-draw defective such as anchor pole inefficacy that causes not in place because of loss of prestress.
The beneficial effect that the utility model is produced compared to existing technology:
(I) prestressing force indented bars anchor pole stretching force detector is integrated as a whole with necessary parts such as signal picker, signal analysis device, multi-functional calculation procedure cards, and it has simplified equipment, can adapt to large tracts of land and detect requirement;
(II) prestressing force steel pole revealed section is grown up in 4 times of the prestress steel shank diameter, the influence of shearing effect to the accounting equation precision can be reduced in 5%;
The inner mode that connects firmly with the reinforcing object of (III) steel pole is the different characteristics according to stabilization works, has expanded range of application greatly;
(IV) selects rigid material or flexible material making prestressing force steel pole pre-buried section for use, and the stabilization works that requires steel pole arrangement of curves or straight line can both effectively be monitored;
Store the calculation procedure of multiple nut commonly used and screw thread steel pole combination in (V) multi-functional calculation procedure card, increased function of use, improved compliance;
Equation in (VI) calculation procedure is set up based on stairstepping fixed end semi girder model, has eliminated to be in the boundary conditions of reinforcing in the object and geometric parameter to the influence of computational accuracy, adopts analytic method to resolve model, and it is more accurate to resolve the result;
It is dynamic that (VII) this monitoring system is to use the mode of test pretightning force to monitor stabilization works, and it is more accurate than the mode of use test displacement, and the inaccurate difficult problem of stabilization works dynamic monitoring is effectively solved;
(VIII) it solved up hill and dale that pretightning force loss is excessive, stretch-draw not in place cause reinforcing lost efficacy and the prestressed reinforcement engineering such as dynamically can't monitor at a difficult problem, to preventing that the prestressed reinforcement engineering lost efficacy, the stability and the reliability of raising stabilization works have important techniques, economic effect, commercial promise is very considerable;
(IX) is simple in structure, and Operation and Maintenance is fast, convenient and safe, can repeat to install, and the integrated level height is easy to carry, and use cost is low, and range of application enlarges, and test specification is convenient to penetration and promotion between 0~200 ton.
The utility model is fit to the prestress anchoraging pattern rock reinforcement engineering of needs large tracts of land monitoring, and as unstable geotechnical body side slope, deep foundation ditch, retaining wall, coal mine roadway, concrete box-beam bridge, high-strength bolt connects steel work etc.
Below in conjunction with the drawings and specific embodiments test macro of the present utility model and operating process are described in further detail.
Description of drawings
Fig. 1 is the front view of the dynamic prestressing force steel pole of the utility model monitoring strengthening engineering preload intelligent anchoring system.
Fig. 2 is prestressing force steel pole pretightning force schematic diagram calculation in the dynamic prestressing force steel pole of the utility model monitoring strengthening engineering preload intelligent anchoring system.
Fig. 3 is the inner pre-buried section structure chart that adopts flexible material to make of prestressing force steel pole in the dynamic prestressing force steel pole of the utility model monitoring strengthening engineering preload intelligent anchoring system.
Fig. 4 is the utility model monitoring strengthening engineering preload dynamic prestressing force steel pole intelligent anchoring system prestressing force steel pole stretching force and the long interior cross section bending rigidity graph of relation of nut.
Among the figure: 1, reinforce object, 2, anchoring body, 3, steel pole, 3a, prestressing force steel pole, 4, supporting plate, 5, nut, 6, revealed section, 7, click resonator, 8, intelligent dynamometer, 81, acceleration transducer, 82, signal picker, 83, signal analysis device, 84, multi-functional calculation procedure card, 85, rechargeable battery, 86, control main board, 87, magnetic force suction base, L-nut 5 bottom surfaces are to the length of prestressing force steel pole 3a revealed section 6 top end faces, L 1-nut 5 is long, L 2-nut 5 end faces are to the length of prestressing force steel pole 3a revealed section 6 top end faces, L 3-nut 5 bottom surfaces are to the length of acceleration transducer 81 inward flanges.
The specific embodiment
In conjunction with the accompanying drawings, the dynamic prestressing force steel pole of monitoring strengthening engineering preload intelligent anchoring system, it is included in the selected reinforcing object 1 and requires to implant steel pole 3 and supporting plate 4 and nut 5 at assigned position according to monitoring, make 3 pre-buried sections of steel poles with reinforce object 1 in conjunction with and become prestressing force steel pole 3a through stretch-draw, steel pole comprises anchoring section and free section for 3 pre-buried sections, and the anchoring section of steel pole 3 is well cementing anchoring or concrete cast-in-situ anchoring with the mode that reinforcing object 1 combines; In prestressing force steel pole 3a outer end revealed section 6 is set, prestressing force steel pole 3a revealed section 6 length are the long Ls of nut 5 end faces to prestressing force steel pole 3a top end face 2, L 2Should be greater than 4 times of prestressing force steel pole 3a diameter; Steel pole is for 3 pre-buried sections to select the indented bars making in the rigid material for use or select for use the cable wire in the flexible material to make, when 3 pre-buried sections of steel poles select for use cable wire in the flexible material to make, the prestressing force steel pole 3a revealed section 6 that cable wire and rigid materials such as selecting indented bars for use must be made adopts modes such as welding or padlock to be connected into integral body; Establish an acceleration transducer 81 and click resonator 7 at prestressing force steel pole 3a revealed section 6 top ends, acceleration transducer 81 is connected with intelligent dynamometer 8, built-in signal collector 82 in this intelligent dynamometer 8, signal analysis device 83, multi-functional calculation procedure card 84, rechargeable battery 85 and control main board 86 are provided with the calculation procedure of the various nuts 5 that call for intelligent dynamometer 8 and steel pole 3 combinations in the multi-functional calculation procedure card 84.Corresponding calculation procedure equation is set up based on stairstepping fixed end semi girder model in the multi-functional calculation procedure card 84, adopts analytic method to find the solution.Use click resonator 7, make prestressing force steel pole 3a revealed section 6 produce micro breadth oscillation, the main interface of operation control main board 86, input prestressing force steel pole 3a revealed section 6 long L 2, L 2Be the length of nut 5 end faces to prestressing force steel pole 3a revealed section 6 top end faces, and run signal collector 82 is carried out the signals collecting order, signal picker 82 picks up the vibration signal of telecommunication of prestressing force steel pole 3a revealed section 6, this vibration signal of telecommunication converts the intrinsic frequency spectrum of prestressing force steel pole 3a revealed section 6 to and by the main interface display of control main board 86 through signal analysis device 83, in the main interface of control main board 86, choose intrinsic frequency, and the intrinsic frequency of choosing is transferred to corresponding calculation procedure in the multi-functional calculation procedure card 84, thereby obtain the pretightning force that prestressing force steel pole 3a passes to supporting plate 4, realize strengthening engineering preload is monitored dynamically.
Installation of the present utility model, detection principle.
Embodiment A.
1. the constructor positions pre-buried according to the design drawing of prestressed reinforcement engineering to anchor system, make installation site and inclination angle, when stabilization works required steel pole 3 arrangement of curves, prestressing force steel pole 3a revealed section 6 was to select for use the indented bars in the rigid material to make; Steel pole is for 3 pre-buried sections to select for use the cable wire in the flexible material to make, and cable wire and prestressing force steel pole 3a revealed section 6 are connected and fixed by modes such as welding or snappings at the free section 150mm place apart from supporting plate 5 of 3 pre-buried sections of steel poles; Working procedure is: welding or the snapping → tensioning fixation → anti-corrosion protection of reinforcing object 1 internal drilling or reservation installation site → installation steel pole 3 → steel pole 3 bottom anchor → cable wire and prestressing force steel pole 3a revealed section 6; Prestressing force steel pole 3a revealed section 6 is reserved the above prestressing force steel pole 3a revealed section 6 long L of 4 times of steel pole 3 diameters on request 2, promptly nut 5 bottom surfaces are to the length of acceleration transducer 81 inward flanges.
2. monitor the dynamic prestressing force steel pole of strengthening engineering preload intelligent anchoring system, it comprises the effect that steel pole 3, supporting plate 4 and nut 5 are common with reinforcing object 1, and the free section tension between supporting plate 4 and anchoring body 2 makes steel pole 3 become prestressing force steel pole 3a; The symbol definition of prestressing force steel pole 3a revealed section 6 is: L-nut 5 bottom surfaces are to the length of prestressing force steel pole 3a revealed section 6 top end faces, L 1-nut 5 is long, L 2-nut 5 end faces are to the length of prestressing force steel pole 3a revealed section 6 top end faces, L 3-nut 5 bottom surfaces are to the length of acceleration transducer 81 inward flanges.
3. monitor the dynamic prestressing force steel pole of strengthening engineering preload intelligent anchoring system, supporting intelligent dynamometer 8 is by the acceleration transducer 81 of outside connection and built-in signal picker 82, signal analysis device 83, multi-functional calculation procedure card 84, rechargeable battery 85 and control main board 86 are formed, use 81 absorption of magnetic force suction base 87 degree of will speed up sensors fixing at prestressing force steel pole 3a revealed section 6 top ends, and prepare click resonator 7 simultaneously, acceleration transducer 81 is connected with signal picker 82, signal picker 82 is gathered the signal of telecommunication that acceleration transducer 81 produces, signal analysis device 83 links to each other with signal picker 82 and is used to analyze the signal of telecommunication and obtains frequency spectrum, be provided with the intrinsic frequency of prestressing force steel pole 3a pretightning force and prestressing force steel pole 3a revealed section 6 in the multi-functional calculation procedure card 84, the equation that the physical geometry key element is relevant, these equations are because of the different difference that exist of nut 5 and steel pole 3, the equation kind is many, the tester can choose in the equation storehouse that multi-functional calculation procedure card 84 is provided with according to the classification of nut 5 that uses in the stabilization works and steel pole 3, control main board 86 can enabling signal analytical equipment 83 with signal picker 82 and call relevant equation in the multi-functional calculation procedure card 84, the main interface input prestressing force steel pole 3a revealed section 6 long L of operation control main board 86 2And run signal collector 82 is carried out the signals collecting order, use click resonator 7 to make 6 vibrations of prestressing force steel pole 3a revealed section, signal picker 82 picks up the vibration signal of telecommunication of this prestressing force steel pole 3a revealed section 6, this vibration signal of telecommunication converts the intrinsic frequency spectrum of prestressing force steel pole 3a revealed section 6 to and by the main interface display of control main board 86 through signal analysis device 83, in the main interface of control main board 86, choose intrinsic frequency, and the intrinsic frequency of choosing is transferred to multi-functional calculation procedure card 84, thereby obtain the pretightning force that prestressing force steel pole 3a passes to supporting plate 4.
Embodiment B.
1. finished the process that is changed into prestressing force steel pole 3a by steel pole 3 through constructing operation, the long L of prestressing force steel pole 3a revealed section 6 should be greater than 4 times of prestressing force steel pole 3a diameter on request, and promptly nut 5 bottom surfaces are to the length of prestressing force steel pole 3a revealed section 6 top end faces; Prestressing force steel pole 3a generally uses diameter to be in vertical prestressed anchor pole spacing cob wall Finish rolling deformed bar, supporting nut 5 height 52mm, profile is a hexagon, opposite side distance is 48mm, prestressing force steel pole 3a revealed section 6 long L 2Equal 152mm, promptly nut 5 bottom surfaces are to the long L of acceleration transducer 81 inward flanges 2Equal 152mm.
2. the top end of prestressing force steel pole 3a revealed section 6 connects firmly by magnetic force suction base 87 acceleration transducer 81 is installed, the direction of vibration of acceleration transducer 81 should be perpendicular to prestressing force steel pole 3a revealed section 6 axis, as shown in Figure 1, acceleration transducer 81 is chosen LC0152 type product, charge sensitivity is 100mv/g, frequency measurement scope 0.7 is to 10000Hz, resonant frequency 30kHz, resolution ratio 0.0002g, weight 17g, the installation screw thread is M5, and supporting magnetic force suction base 87 arranged, the gross weight of acceleration transducer 81 and magnetic force suction base 87 is 32g, and acceleration transducer 81 diameters are 16mm.
3. present embodiment can be determined nut 5 long L 1Be 52mm; Nut 5 end faces are to the long L of prestressing force steel pole 3a revealed section 6 top end faces 2Be 152mm; Nut 5 bottom surfaces are to the long L=L of prestressing force steel pole 3a revealed section 6 top end faces 1+ L 2Be 204mm; Nut 5 bottom surfaces are to the long L of acceleration transducer 81 inward flanges 3=L 1+ L 2-sensor diameter is L 3186mm; Nut 5 long L 1With acceleration transducer 81 diameters in same stabilization works, be fixed value, for different samples, as long as measure the long L of nut 5 end faces to prestressing force steel pole 3a revealed section 6 top end faces 2The geometric element of then whole stairstepping fixed end semi girder model is just determined that geometric element is the key of solving equation.
4. acceleration transducer 81 links to each other with signal picker 82 in the intelligent dynamometer 8 by H cable.
5. be connected by integrated circuit between data acquisition unit 82, signal analysis device 83, multi-functional calculation procedure card 84 and the control main board 86, click intelligent dynamometer 8 interfaces by control main board 86 run signal collectors 82 and signal analysis device 83 and call multi-functional calculation procedure card 84.
6. connect acceleration transducer 81 and data acquisition unit 82, operative intelligence dynamometer 8 interfaces are by the 82 commencing signal collections of control main board 86 run signal collectors, use click resonator 7 simultaneously, this click resonator 7 should be able to make prestressing force steel pole 3a revealed section 6 produce vibration, slightly hit the top end of the prestressing force steel pole 3a revealed section 6 that shakes by artificial employing pulse mode, hitting the direction of shaking should be perpendicular to prestressing force steel pole 3a revealed section 6 axis, operative intelligence dynamometer 8 interfaces make signal picker 82 stop to gather and run signal analytical equipment 83 by control main board 86 after 3 seconds, eigenfrequency spectrum figure to intelligent dynamometer 8 interface display analyzes, and chooses the single order vibration frequency of prestressing force steel pole 3a revealed section 6.
7. the equation that calls in the multi-functional calculation procedure card 84 carries out the calculating of prestressing force steel pole 3a pretightning force.
Referring to accompanying drawing 2.
1) calculates principle.
Look whole steel pole 3 outer ends that prestressing force steel pole 3a revealed section 6 promptly comprises nut 5, promptly nut 5 end faces are to the long L of prestressing force steel pole 3a revealed section 6 top end faces 2It is a stairstepping fixed end semi girder model, under the different pretightning force effects, cap nut 5 partial prestressing steel pole 3a are different with the exposure level between nut 5 and nut 5 and the supporting plate 4, can infer different pretightning forces, the part of prestressing force steel pole 3a outer end cap nut 5 has different bending rigidities, then semi girder should have different eigentones mutually, utilizes the relation of intrinsic frequency and rigidity, by the test intrinsic frequency, identification rigidity is from the variation acquisition stretching force of rigidity.The use exact Analytic Method makes up the relation of rigidity and frequency, and is more stable accurately than energy method.
As follows by three sections uniform beam row undamped kinetic equations:
Figure DEST_PATH_DEST_PATH_IMAGE002
Figure DEST_PATH_RE-DEST_PATH_IMAGE003
(1)
Figure DEST_PATH_DEST_PATH_IMAGE004
Figure DEST_PATH_RE-DEST_PATH_IMAGE005
(2)
Figure DEST_PATH_DEST_PATH_IMAGE006
(3)
12 fringe conditionss of substitution, 12 equations of simultaneous get its matrix expression:
Figure DEST_PATH_DEST_PATH_IMAGE008
(4)
The coefficient matrix housing in row that utilizes the perturbation decree to comprise frequency and rigidity is zero
Figure DEST_PATH_RE-DEST_PATH_IMAGE009
(5)
In the formula:
Figure DEST_PATH_DEST_PATH_IMAGE010
, ,
Figure DEST_PATH_DEST_PATH_IMAGE012
For or not zero equation coefficient entirely, For only comprising single order vibration circular frequency
Figure DEST_PATH_DEST_PATH_IMAGE014
And stiffness parameters
Figure DEST_PATH_RE-DEST_PATH_IMAGE015
The matrix of two unknown numbers, wherein The bending rigidity of the revealed section 6 that is provided with on request for prestressing force steel pole 3a,
Figure DEST_PATH_RE-DEST_PATH_IMAGE017
The unit head's of nut 5 anchorage zones that are provided with on request for prestressing force steel pole 3a outer end quality,
Figure DEST_PATH_DEST_PATH_IMAGE018
The unit head's of the revealed section 6 that is provided with on request for prestressing force steel pole 3a outer end quality,
Figure DEST_PATH_RE-DEST_PATH_IMAGE019
For considering the quality dimension of acceleration transducer 81 and magnetic force suction base 87.
(5) formula is tried to achieve
Figure DEST_PATH_DEST_PATH_IMAGE020
Substitution is demarcated through test
Figure DEST_PATH_711926DEST_PATH_IMAGE020
-
Figure DEST_PATH_RE-DEST_PATH_IMAGE021
Relation (figure below) equation:
Figure DEST_PATH_DEST_PATH_IMAGE022
(2)
Figure DEST_PATH_272743DEST_PATH_IMAGE020
Bending rigidity for cross section in the stairstepping fixed end semi girder model nut 5 long scopes.
Figure DEST_PATH_114797DEST_PATH_IMAGE021
Be the pretightning force of prestressing force steel pole 3a to supporting plate 4.
Prestressing force steel pole 3a exposes segment length L in the foregoing description 2Be 152mm, measured single order vibration frequency is 540.8Hz, and then stretching force is 32.5 tons.
Is the calculating principle of a stairstepping fixed end semi girder model according to the utility model based on looking the whole outer end that comprises nut 5 and prestressing force steel pole 3a revealed section 6, steel pole is for 3 pre-buried sections to select for use rigid material or flexible material to make not influence result of calculation in the foregoing description, promptly as long as revealed section 6 is the indented bars making in the rigid material, then steel pole adopts indented bars or cable wire to make for 3 pre-buried sections, all is adapted to calculating principle of the present utility model.
Below only be preferred embodiment of the present utility model, according to above-mentioned design of the present utility model, those skilled in the art also can make various modifications and conversion to this, yet, based on the conversion of same principle with revise and all belong to essence of the present utility model.

Claims (8)

1. monitor the dynamic prestressing force steel pole of strengthening engineering preload intelligent anchoring system, it is characterized in that it is included in selected reinforcing object (1) and is implanted into steel pole (3) and supporting plate (4) and nut (5), make pre-buried section of steel pole (3) with reinforce object (1) in conjunction with and become prestressing force steel pole (3a) through stretch-draw, steel pole (3) comprises anchoring section and free section for pre-buried section, in prestressing force steel pole (3a) outer end revealed section (6) is set, establish an acceleration transducer (81) and click resonator (7) in this revealed section (6) top end, acceleration transducer (81) is connected with intelligent dynamometer (8), built-in signal collector (82) in this intelligent dynamometer (8), signal analysis device (83), multi-functional calculation procedure card (84), rechargeable battery (85) and control main board (86).
2. the dynamic prestressing force steel pole of monitoring strengthening engineering preload according to claim 1 intelligent anchoring system is characterized in that the anchoring section in pre-buried section of the steel pole (3) is the well cementing anchoring with reinforcing the mode that object (1) combines.
3. the dynamic prestressing force steel pole of monitoring strengthening engineering preload according to claim 1 intelligent anchoring system is characterized in that the anchoring section in pre-buried section of the steel pole (3) is the concrete cast-in-situ anchoring with reinforcing the mode that object (1) combines.
4. the dynamic prestressing force steel pole of monitoring strengthening engineering preload according to claim 1 intelligent anchoring system is characterized in that prestressing force steel pole (3a) revealed section (6) length is the long L of nut (5) end face to prestressing force steel pole (3a) top end 2Should be greater than 4 times of prestressing force steel pole (3a) diameter.
5. the dynamic prestressing force steel pole of monitoring strengthening engineering preload according to claim 1 intelligent anchoring system, the material that it is characterized in that pre-buried section of prestressing force steel pole (3a) are to select for use rigid material to make.
6. the dynamic prestressing force steel pole of monitoring strengthening engineering preload according to claim 5 intelligent anchoring system, the rigid material that it is characterized in that pre-buried section of prestressing force steel pole (3a) is an indented bars.
7. the dynamic prestressing force steel pole of monitoring strengthening engineering preload according to claim 1 intelligent anchoring system, the material that it is characterized in that pre-buried section of prestressing force steel pole (3a) are to select for use flexible material to make.
8. the dynamic prestressing force steel pole of monitoring strengthening engineering preload according to claim 7 intelligent anchoring system, the flexible material that it is characterized in that pre-buried section of prestressing force steel pole (3a) is a cable wire.
CN201020232149XU 2010-06-22 2010-06-22 Prestress steel pole intelligent anchoring system used for monitoring the pretightening force dynamic of the strengthening engineering Expired - Fee Related CN201883611U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201020232149XU CN201883611U (en) 2010-06-22 2010-06-22 Prestress steel pole intelligent anchoring system used for monitoring the pretightening force dynamic of the strengthening engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201020232149XU CN201883611U (en) 2010-06-22 2010-06-22 Prestress steel pole intelligent anchoring system used for monitoring the pretightening force dynamic of the strengthening engineering

Publications (1)

Publication Number Publication Date
CN201883611U true CN201883611U (en) 2011-06-29

Family

ID=44181150

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201020232149XU Expired - Fee Related CN201883611U (en) 2010-06-22 2010-06-22 Prestress steel pole intelligent anchoring system used for monitoring the pretightening force dynamic of the strengthening engineering

Country Status (1)

Country Link
CN (1) CN201883611U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104075835A (en) * 2014-06-30 2014-10-01 天地科技股份有限公司 Test bed for installing and pre-tightening of anchor rod and test method
CN107084812A (en) * 2017-06-14 2017-08-22 湖南科技大学 The detecting system and method for concrete box beam bridge web vertical pre-stress rib stretching force

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104075835A (en) * 2014-06-30 2014-10-01 天地科技股份有限公司 Test bed for installing and pre-tightening of anchor rod and test method
CN107084812A (en) * 2017-06-14 2017-08-22 湖南科技大学 The detecting system and method for concrete box beam bridge web vertical pre-stress rib stretching force

Similar Documents

Publication Publication Date Title
CN101864845B (en) Prestress steel rod intelligent anchoring system monitoring dynamic state of strengthening engineering preload
CN101865739B (en) Pre-tightening force dynamic monitoring system for pre-stressed anchor bar strengthening project
CN101419104B (en) Detecting based on concrete box beam bridge web vertical pre-stress rib stretching force
AU2006345338B2 (en) A random, nondestructive and dynamic testing apparatus and method of the stressed state of a roof bolt
CN107503386A (en) Anchor rod body holds the detection means and detection method of load
CN104316108A (en) Method for establishing and analyzing online monitoring system for 500kv power transmission tower in mountain environment
CN103335747B (en) Prestress wire stretching force intelligent detecting method
CN101936795A (en) High-precision cable tension force test method based on model analysis
CN103837279A (en) Prestress anchoring structure tensioning force detecting system based on single-freedom-degree system
CN101893497A (en) Out-of-plane frequency method for testing cable force of planar cable rod system
CN101762347A (en) Method for measuring rope force of multi-span steel stay rope by using half-wave method
CN110132478A (en) Wind driven generator base anchor bolt pre-fastening moment detection system and detection method
CN108534730A (en) A kind of device for measuring soil body deeply mixing cement-soil pile and surface settlement in real time
CN202430702U (en) Probe based on multifunctional piezocone penetration test
CN201883611U (en) Prestress steel pole intelligent anchoring system used for monitoring the pretightening force dynamic of the strengthening engineering
CN201335748Y (en) Detecting system based on concrete box girder bridge web-plate vertical pre-stressed reinforcing steel tensioning force
CN206469864U (en) A kind of intelligent bolt for bridge structural health monitoring
CN201826335U (en) Pre-tightening force dynamic monitor system of prestressed anchor bolt reinforcement engineering
CN208238763U (en) A kind of device for real-time measurement soil body deeply mixing cement-soil pile and surface settlement
CN105423880B (en) A kind of method for hanging main push-towing rope measurement deflection of bridge span
CN1963459A (en) Random lossless dynamical testing apparatus and method for anchor arm and anchoring
CN107084812A (en) The detecting system and method for concrete box beam bridge web vertical pre-stress rib stretching force
CN205638513U (en) Stock sensor
CN204575459U (en) A kind of flexural member Mechanics Performance Testing device
CN104807607A (en) Structure disease detecting system based on response spectrum characteristic in excited state and detecting method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110629

Termination date: 20130622