CN201873915U - 预应力板铁路立交桥 - Google Patents
预应力板铁路立交桥 Download PDFInfo
- Publication number
- CN201873915U CN201873915U CN2010201006712U CN201020100671U CN201873915U CN 201873915 U CN201873915 U CN 201873915U CN 2010201006712 U CN2010201006712 U CN 2010201006712U CN 201020100671 U CN201020100671 U CN 201020100671U CN 201873915 U CN201873915 U CN 201873915U
- Authority
- CN
- China
- Prior art keywords
- side wall
- railway
- prestressed slab
- overpass
- railway overpass
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本实用新型公开了一种预应力板铁路立交桥,旨在有效地降低结构高度,并最大程度地减小对既有线路行车的影响。包括桥面结构的支撑结构,其特征是:所述支撑结构为设置在正线铁路两侧的第一侧墙(11)和第二侧墙(12),第一侧墙(11)、第二侧墙(12)为嵌固桩;所述桥面结构是支撑固定于第一侧墙(11)和第二侧墙(12)顶部的预应力板(20)。本实用新型的有益效果是,很好地解决了净空控制结构高度,侧墙结合路基边坡处理措施,可大幅度地降低了工程造价;结构新颖,与环境条件结合好,经济效益明显。
Description
技术领域
本实用新型涉及铁路,特别涉及一种铁路立交桥。
背景技术
贵阳客运站改造工程中,需新建机走联络线和出入段I线跨贵广正线(双线)。机走联络线与贵广正线交角为14°,桥长度(沿贵广线)120m,跨度16m。桥的一端接贵阳客站,另一端接既有黔桂线客车外绕线望城坡隧道。线位两侧建筑物多,线路右侧为既有的改建南客I线,施工时应保证既有线行车安全。
按常规的设计方法通常可采取如下两种方案,1、采用跨度16m预应力简支道岔T梁。该梁式桥结构高度高,增长了两端连接的长度,对车站布置及望城坡隧道的改建影响大;2、净宽16m钢筋混凝土框架桥。该钢筋混凝土框架顶板高度略高,由于斜交角度小,箱体易开裂,施工工作面大,对既有线行车影响大,基坑防护费用高。
实用新型内容
本实用新型所要解决的技术问题是提供一种预应力板铁路立交桥,能有效地降低结构高度,而且对既有线路行车影响小。
本实用新型解决其技术问题所采用的技术方案是:本实用新型的预应力板铁路立交桥,包括桥面结构的支撑结构,其特征是:所述支撑结构为设置在正线铁路两侧的第一侧墙和第二侧墙,第一侧墙、第二侧墙为嵌固桩;所述桥面结构是支撑固定于第一侧墙和第二侧墙顶部的预应力板。
本实用新型的有益效果是,很好地解决了净空控制结构高度,侧墙结合路基边坡处理措施,可大幅度地降低了工程造价;结构新颖,与环境条 件结合好,经济效益明显。
附图说明
本说明书包括如下三幅附图:
图1是本实用新型预应力板铁路立交桥的平面结构图;
图2是本实用新型预应力板铁路立交桥的立面结构图;
图3是图2中局部A的放大视图。
图中示出部件、部位名称及所对应的标记:第一侧墙11、第二侧墙12、第一挡水凸台13、防水层14、泄水管30、反滤层31、预应力板20、防水坡面21、第二挡水凸台22。
具体实施方式
下面结合附图和实施例对本实用新型进一步说明。
参照图1和图2,本实用新型的预应力板铁路立交桥,包括桥面结构的支撑结构。所述支撑结构为设置在正线铁路两侧的第一侧墙11和第二侧墙12,第一侧墙11、第二侧墙12为嵌固桩,顺线路方向4m,跳槽开挖,对既有线行车影响最小,最大限度降低了施工风险,侧墙与路基边坡防护措施结合,大幅度地降低了工程造价。所述桥面结构是支撑固定于第一侧墙11、第二侧墙12顶部的预应力板20。板的高度为1.0m,降低了结构高度,很好地满足设计限界的要求。
参照图2,所述第一侧墙11、第二侧墙1顶部具有支撑槽,预应力板20的纵向两端嵌于支撑槽上。所述预应力板20及第一侧墙11、第二侧墙12上布设有防水排水构造。参照图2和图3,所述防水排水构造包括铺设在预应力板20顶面的防水坡面21,以及铺设第一侧墙11、第二侧墙12顶面的防水层14。所述防水排水构造还包括设置在预应力板20纵向端部的第二挡水凸台22,以及设置第一侧墙11、第二侧墙12顶部支撑槽外侧的第一挡水凸台13,第一挡水凸台13、第二挡水凸台22作用是阻止桥面 水通过桥面板端缝流入第一侧墙11、第二侧墙12内侧壁,影响本立交桥使用功效及美观。所述防水排水构造还包括布设在第一侧墙11与侧墙后背之间的反滤层31,反滤层31与泄水管30相连通,泄水管30与正线铁路既有的排水沟连。
以上所述只是用图解说明本实用新型预应力板铁路立交桥的一些原理,并非是要将本实用新型预应力板铁路立交桥局限在所示和所述的具体结构和适用范围内,故凡是所有可能被利用的相应修改以及等同物,均属于本实用新型所申请的专利范围。
Claims (6)
1.预应力板铁路立交桥,包括桥面结构的支撑结构,其特征是:所述支撑结构为设置在正线铁路两侧的第一侧墙(11)和第二侧墙(12),第一侧墙(11)、第二侧墙(12)为嵌固桩;所述桥面结构是支撑固定于第一侧墙(11)和第二侧墙(12)顶部的预应力板(20)。
2.如权利要求1所述的预应力板铁路立交桥,其特征是:所述第一侧墙(11)和第二侧墙(12)顶部具有支撑槽,预应力板(20)的纵向两端嵌于支撑槽上。
3.如权利要求2所述的预应力板铁路立交桥,其特征是:所述预应力板(20)及第一侧墙(11)和第二侧墙(12)上布设有防水排水构造。
4.如权利要求3所述的预应力板铁路立交桥,其特征是:所述防水排水构造包括铺设在预应力板(20)顶面的防水坡面(21),以及铺设第一侧墙(11)和第二侧墙(12)顶面的防水层(14)。
5.如权利要求4所述的预应力板铁路立交桥,其特征是:所述防水排水构造还包括设置在预应力板(20)纵向端部的第二挡水凸台(22),以及第一侧墙(11)和第二侧墙(12)顶部支撑槽外侧的第一挡水凸台(13)。
6.如权利要求5所述的预应力板铁路立交桥,其特征是:所述防水排水构造还包括布设在第一侧墙(11)与侧墙后背之间的反滤层(31),反滤层(31)与泄水管(30)相连通,泄水管(30)与正线铁路既有排水沟连。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201006712U CN201873915U (zh) | 2010-01-25 | 2010-01-25 | 预应力板铁路立交桥 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201006712U CN201873915U (zh) | 2010-01-25 | 2010-01-25 | 预应力板铁路立交桥 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201873915U true CN201873915U (zh) | 2011-06-22 |
Family
ID=44161840
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010201006712U Expired - Lifetime CN201873915U (zh) | 2010-01-25 | 2010-01-25 | 预应力板铁路立交桥 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201873915U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106294925A (zh) * | 2016-06-29 | 2017-01-04 | 西南交通大学 | 一种重载铁路隧道两侧沟槽结构体应力的获得方法 |
CN110424988A (zh) * | 2019-08-16 | 2019-11-08 | 招商局重庆交通科研设计院有限公司 | 隧道防水结构及隧道防水方法 |
-
2010
- 2010-01-25 CN CN2010201006712U patent/CN201873915U/zh not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106294925A (zh) * | 2016-06-29 | 2017-01-04 | 西南交通大学 | 一种重载铁路隧道两侧沟槽结构体应力的获得方法 |
CN106294925B (zh) * | 2016-06-29 | 2019-10-22 | 西南交通大学 | 一种重载铁路隧道两侧沟槽结构体应力的获得方法 |
CN110424988A (zh) * | 2019-08-16 | 2019-11-08 | 招商局重庆交通科研设计院有限公司 | 隧道防水结构及隧道防水方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201593203U (zh) | 地下室底板暗布式防渗导水系统 | |
CN102434175A (zh) | 隧道衬砌自防排水系统 | |
CN202483588U (zh) | 隧道衬砌自防排水系统 | |
CN208072088U (zh) | 强富水地段铁路膨胀土路堑基床构造 | |
CN103046579B (zh) | 一种双向八车道湖底明挖暗埋隧道结构 | |
CN203256774U (zh) | 一种电气工程用地下电缆沟施工结构 | |
CN109610509A (zh) | 一种综合管廊自控断面的可调模架系统和施工方法 | |
CN109236322A (zh) | 一种防止软岩巷道底鼓的人工底板及其构筑和维修方法 | |
CN201873915U (zh) | 预应力板铁路立交桥 | |
CN101532386A (zh) | 用于浅层地下空间施工的减摩隔板托换方法及装置 | |
CN207568626U (zh) | 一种用于膨胀性地层的隧道结构 | |
CN201865023U (zh) | 公路封闭防水型中央分隔带 | |
CN205999769U (zh) | 一种高速铁路钢混组合独塔部分斜拉桥 | |
CN210529471U (zh) | 一种城市轨道交通电缆上桥包墩 | |
CN219653488U (zh) | 桩板挡墙与桥台共建结构 | |
CN209603182U (zh) | 一种综合管廊自控断面的可调模架系统 | |
CN208104910U (zh) | 一种中低速磁悬浮低置线路路基结构 | |
CN102628278B (zh) | U管墩型城市地下铁路 | |
CN203440749U (zh) | 一种更平稳的桥梁结构 | |
CN205000290U (zh) | 库底沥青混凝面板和库坡混凝土面板连接结构 | |
CN205171281U (zh) | 路堤式u型支挡结构 | |
CN208917611U (zh) | 一种可防软化的路基结构 | |
CN209779371U (zh) | 一种公路路基防水装置 | |
CN107151954A (zh) | 一种crtsⅲ型无砟轨道底座板滴增压灌养护装置及灌养方法 | |
CN203145044U (zh) | 一种双向八车道湖底明挖暗埋隧道结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20110622 |
|
CX01 | Expiry of patent term |