CN201865674U - Mold bag for concreting gob-side entry retaining partition wall - Google Patents
Mold bag for concreting gob-side entry retaining partition wall Download PDFInfo
- Publication number
- CN201865674U CN201865674U CN2010205476223U CN201020547622U CN201865674U CN 201865674 U CN201865674 U CN 201865674U CN 2010205476223 U CN2010205476223 U CN 2010205476223U CN 201020547622 U CN201020547622 U CN 201020547622U CN 201865674 U CN201865674 U CN 201865674U
- Authority
- CN
- China
- Prior art keywords
- mould bag
- partition wall
- side entry
- entry retaining
- bag
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model discloses a mould bag for concreting a gob-side entry retaining partition wall. The mould bag is an enclosed bag. The mould bag structurally comprises a fixing ear drum, a perfusion air vent, a mould bag top, a reinforcing rib, a connecting feather eave, an anchoring hole and a grouting pore path, wherein the fixing ear drum is a cylindrical structure. With the adoption of the structure, the mold bag is convenient to manufacture and can be the quickly fixed. The mould bag is applicable to the concreting of the gob-side entry retaining partition wall, has simple structure and fast construction speed, and is widely applied to civil engineering industries such as coal mine, building, metallurgy mine, water conservancy, underground building and national defense and the like.
Description
Technical field
The utility model relates to the mould bag that a kind of concreting uses, and is specifically related to the mould bag that a kind of gob side entry retaining partition wall concreting uses.
Background technology
Rigid template is used in concreting always.Sometimes there is serious spillage in rigid template.Especially when the isolation body of wall of building by laying bricks or stones between roof and floor, can not be implemented in the pouring of template top.If adopt the pumping liquid concrete technology in rigid template, the seam spillage of template can influence the concrete filling compaction rate.So just had such as the device of application (patent) number 200920034356.1 mining activity face gob-side entry retaining casting concrete continuous walls and the such patent of flexible filling bag of application (patent) number 200720046802.1 1 kinds of carrying pipes.These all are to the utility model after the improvement of rigid template defective.But existing this class filling bag comes with some shortcomings in construction.The not enough simplicity of mould bag manufacture craft for example, mould bag connection reliability is not good, and the mould bag sets up and has defective etc.
Summary of the invention
The purpose of this utility model is at the deficiencies in the prior art, especially builds the convenient and swift of divider wall by laying bricks or stones in order to adapt to coal mine gob-side entry retaining, provides a kind of simple in structure, and speed of application is fast, the mould bag that the gob side entry retaining partition wall concreting of reliable in structure uses.
In order to realize above-mentioned task, the technical solution adopted in the utility model is:
The mould bag that a kind of gob side entry retaining partition wall concreting uses is characterized in that this mould bag is an enclosed construction, includes fixedly ear tube, perfusion steam vent, mould bag top, ribs, connection plumage eaves, dowel hole and grouting duct on the described mould bag constructions.
Described fixedly ear tube is a tubular structure.Its tubular diameter is 10-150mm, and length is identical with mould bag top margin.
Described perfusion steam vent diameter is 10-150mm.
Make for a slice soft cloth on described mould bag top.
Described connection plumage eaves is a bar shaped cloth sheet or tubular construction, has a plurality of connecting holes on it, and the diameter of connecting hole is 10-20mm, and the connecting hole spacing is 50-200mm.
Described dowel hole and grouting duct are one and connect the inside and outside tubular soft cloth of mould bag.Length in the mould bag is greater than 2 times channel diameter.
Described grouting duct is positioned at the first half of mould bag more than 1/5th.
Described ribs is evenly distributed on mould bag both sides.
Of the present utility modelly compared with prior art have the following advantages:
Tubular fixedly ear barrel structure bag is convenient, and can reach fixing fast, and the edge of mould bag can be good at connecing the top, can guarantee that concrete seals between roof and floor.Soft roof construction is convenient to pumping liquid concrete and is connect the top.Have a plurality of connecting holes on the connection plumage eaves and be very beneficial for closely linking fast between two mould bags.The grouting pore passage structure of tubular can realize that self sealss prevent spillage.Adopt the utility model speed of application fast, the efficiency height.This mould bag can be widely used in the colliery, building, metallurgical mine, water conservancy, underground building, civil engineering industries such as national defence.
Description of drawings
Fig. 1 is a gob-side entry retaining concrete partition wall construction mold bag constructions schematic diagram of the present utility model.
Fig. 2 is for adopting the utility model gob-side entry retaining concrete partition wall construction mold bag construction embodiment schematic diagram.
Number in the figure is represented respectively: 1, fixing ear tube, 2, the perfusion steam vent, 3, mould bag top, 4, ribs, 5, first connects the plumage eaves, and 6, the dowel hole, 7, the grouting duct, 8, individual prop, 9, rigid bar, 10, second connects the plumage eaves, and 11, roof, 12, seat earth.
The specific embodiment
Referring to Fig. 1,, make a gob-side entry retaining concrete partition wall construction mold bag according to the physical dimension of gob side entry retaining divider wall, this mould bag constructions is by fixing ear tube 1, slip casting steam vent 2, flexible fiber top 3, ribs 4 connects plumage eaves 5, and dowel hole 6 and grouting duct 7 are formed.
Gu top ear tube diameter is 30mm; Perfusion steam vent 2 diameters are 10-150mm.
Slip casting steam vent orifice throat length is 120mm;
Make for knitting cloth on flexible fiber 3 tops;
Connect plumage eaves 5 and do not make a call to the connecting hole of a diameter phi 15 every 50mm for not sewing up the tubular construction that forms, connecting on the plumage eaves 5 with giving a discount.
Dowel hole 6 and grouting duct 7 are one and run through the inside and outside tubular soft cloth structure of mould bag that grouting duct 7 is made for the tubular cloth of diameter phi 150;
Described grouting duct 7 is positioned at the first half of mould bag more than 1/5th.
Ribs 4 is evenly distributed on mould bag both sides.
It is as follows to adopt above-mentioned gob-side entry retaining concrete partition wall construction mold bag to carry out construction sequence:
1, the gob-side entry retaining concrete partition wall construction mold bag is placed on the seat earth 12, rope is pierced into first connecting hole that connects plumage eaves 5 the mould bag is connected plumage eaves 10 with second of adjacent mould bag is fixed together;
2, rigidity back timber 9 is penetrated fixedly ear tube 1;
3, rigidly fix back timber 9 until to roof 11 with what individual prop 8 jackings were positioned at fixing ear tube 1;
4, elephant trunk is connected with grouting duct 7, in the mould bag, injects a small amount of concrete from grouting duct 7;
5, adjust construction mold bag and shaping location;
6, push up until pasting from grouting duct 7 pumping liquid concretes continuously;
7, slowly extract elephant trunk out.
Gob-side entry retaining concrete partition wall construction mold bag constructions of the present utility model is simple, easy to use, and speed of application is fast, the efficiency height.Can be widely used in coal mine gob-side entry retaining divider wall and military water conservancy and field of civil engineering.
Claims (8)
1. the mould bag that uses of a gob side entry retaining partition wall concreting, it is characterized in that, this mould bag is an enclosed construction, includes fixedly ear tube (1), perfusion steam vent (2), mould bag top (3), ribs (4), connection plumage eaves (5), dowel hole (6) and grouting duct (7) on the described mould bag constructions.
2. the mould bag that gob side entry retaining partition wall concreting as claimed in claim 1 uses is characterized in that described fixedly ear tube (1) is a tubular structure, and its tubular diameter is 10-150mm, and length is identical with mould bag top margin.
3. the mould bag that gob side entry retaining partition wall concreting as claimed in claim 1 uses is characterized in that described perfusion steam vent (2) diameter is 10-150mm.
4. the mould bag that gob side entry retaining partition wall concreting as claimed in claim 1 uses is characterized in that described mould bag pushes up (3) and makes for a slice soft cloth.
5. the mould bag that gob side entry retaining partition wall concreting as claimed in claim 1 uses, it is characterized in that described connection plumage eaves (5) is a cloth or cloth barrel structure, on the connection plumage eaves (5) a plurality of connecting holes are set, the connecting hole spacing is 50-200mm, and the diameter of connecting hole is 10-20mm.
6. the mould bag that gob side entry retaining partition wall concreting as claimed in claim 1 uses, it is characterized in that described dowel hole (6) and grouting duct (7) are to connect an inside and outside tubular soft cloth interface of mould bag, the length of described tubular cloth interface in the mould bag is greater than 2 times channel diameter.
7. the mould bag that gob side entry retaining partition wall concreting as claimed in claim 1 uses is characterized in that described grouting duct (7) is positioned at the first half of mould bag more than 1/5th.
8. the mould bag that gob side entry retaining partition wall concreting as claimed in claim 1 uses is characterized in that described ribs (4) is evenly distributed on mould bag both sides.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010205476223U CN201865674U (en) | 2010-09-29 | 2010-09-29 | Mold bag for concreting gob-side entry retaining partition wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010205476223U CN201865674U (en) | 2010-09-29 | 2010-09-29 | Mold bag for concreting gob-side entry retaining partition wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201865674U true CN201865674U (en) | 2011-06-15 |
Family
ID=44136831
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010205476223U Expired - Fee Related CN201865674U (en) | 2010-09-29 | 2010-09-29 | Mold bag for concreting gob-side entry retaining partition wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201865674U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101929342A (en) * | 2010-09-29 | 2010-12-29 | 西安科技大学 | Gob-side entry retaining concrete partition wall construction mold bag and construction method thereof |
CN105937407A (en) * | 2016-06-22 | 2016-09-14 | 西安科技大学 | Gob-side entry retaining concrete filled wall annular air bag construction method |
CN106089295A (en) * | 2016-06-08 | 2016-11-09 | 太原理工大学 | A kind of filling template of coal mine underground exploitation |
CN106870001A (en) * | 2017-02-21 | 2017-06-20 | 长沙矿山研究院有限责任公司 | Tunnel is layered pocket type self-support filling counterfort construction method |
-
2010
- 2010-09-29 CN CN2010205476223U patent/CN201865674U/en not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101929342A (en) * | 2010-09-29 | 2010-12-29 | 西安科技大学 | Gob-side entry retaining concrete partition wall construction mold bag and construction method thereof |
CN101929342B (en) * | 2010-09-29 | 2012-05-23 | 西安科技大学 | Gob-side entry retaining concrete partition wall construction mold bag and construction method thereof |
CN106089295A (en) * | 2016-06-08 | 2016-11-09 | 太原理工大学 | A kind of filling template of coal mine underground exploitation |
CN106089295B (en) * | 2016-06-08 | 2018-04-10 | 太原理工大学 | A kind of filling template of coal mine underground exploitation |
CN105937407A (en) * | 2016-06-22 | 2016-09-14 | 西安科技大学 | Gob-side entry retaining concrete filled wall annular air bag construction method |
CN105937407B (en) * | 2016-06-22 | 2017-11-10 | 西安科技大学 | A kind of construction method of gob-side entry retaining concrete filling wall annular air-pocket |
CN106870001A (en) * | 2017-02-21 | 2017-06-20 | 长沙矿山研究院有限责任公司 | Tunnel is layered pocket type self-support filling counterfort construction method |
CN106870001B (en) * | 2017-02-21 | 2019-05-21 | 长沙矿山研究院有限责任公司 | Tunnel is layered pocket type self-support filling counterfort construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101929342B (en) | Gob-side entry retaining concrete partition wall construction mold bag and construction method thereof | |
CN102337906B (en) | Construction method for pouring airtight partition wall between recovered roadway and reserved roadway | |
CN201865674U (en) | Mold bag for concreting gob-side entry retaining partition wall | |
CN203603930U (en) | Device for preventing tunnel secondary lining vault from disengaging | |
CN202557970U (en) | Multi-room mine goaf filling string bag | |
CN102996159A (en) | Multiphase medium plugging device and method for gas extraction drill hole | |
CN101845944A (en) | Method for sealing gas drainage boreholes at specified positions | |
CN201412163Y (en) | Circular tunnel lining structure for construction of open-type tunnel boring machine | |
CN101270672A (en) | Artificial ore pillar construction method | |
CN101649744A (en) | Device and method for casting concrete continuous walls along gob-side entry retaining by mining working face | |
CN101936065A (en) | Template with rigid-flexible composite structure and partition wall construction method by retaining roadway along goaf thereof | |
CN201486566U (en) | Device for pouring concrete continuous wall through gob-side entry retaining of mining working surface | |
CN201770981U (en) | Tube-side injection grouting apparatus for simultaneous drilling pipe pile | |
CN202851078U (en) | High water material filling column bag body | |
CN204185844U (en) | Draining slip casting structure | |
CN206143771U (en) | Belted steel strip aerify stock | |
CN205260049U (en) | Deep roadway support uses novel concrete support | |
CN102852140B (en) | Curtain type cave filling pile construction method and elastic mesh cloth | |
CN208056108U (en) | A kind of prefabricated assembled underground pipe gallery depression Disease Treatment structure | |
CN204492855U (en) | Detachable adaptive multistage increases resistance high-strength hollow grouting anchor pile | |
CN205369230U (en) | Anti -floating pile and underwater concrete tongue -and -groove coupling mechanism | |
CN208996752U (en) | A kind of soft mould filling mining bracket | |
CN202187288U (en) | Compound tunnel anchorage | |
CN201747385U (en) | Rigid and flexible composite shuttering | |
CN202731960U (en) | Mine goaf filling and roadway retaining device system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110615 Termination date: 20120929 |