CN106089295B - A kind of filling template of coal mine underground exploitation - Google Patents
A kind of filling template of coal mine underground exploitation Download PDFInfo
- Publication number
- CN106089295B CN106089295B CN201610400033.4A CN201610400033A CN106089295B CN 106089295 B CN106089295 B CN 106089295B CN 201610400033 A CN201610400033 A CN 201610400033A CN 106089295 B CN106089295 B CN 106089295B
- Authority
- CN
- China
- Prior art keywords
- bar
- rod
- flexible
- filling
- supporting rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000003245 coal Substances 0.000 title claims abstract description 26
- 239000004744 fabric Substances 0.000 claims abstract description 35
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 19
- 239000010959 steel Substances 0.000 claims abstract description 19
- 239000004677 Nylon Substances 0.000 claims abstract description 11
- 229920001778 nylon Polymers 0.000 claims abstract description 11
- 230000008093 supporting effect Effects 0.000 claims description 13
- 239000000463 material Substances 0.000 claims description 12
- 230000008602 contraction Effects 0.000 claims description 2
- 229920002521 macromolecule Polymers 0.000 claims 1
- 230000002787 reinforcement Effects 0.000 claims 1
- 238000005065 mining Methods 0.000 abstract description 24
- 238000009415 formwork Methods 0.000 abstract description 16
- 230000003014 reinforcing effect Effects 0.000 abstract description 4
- 238000010586 diagram Methods 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 5
- 230000000694 effects Effects 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- 238000011084 recovery Methods 0.000 description 3
- 239000002699 waste material Substances 0.000 description 3
- 239000004566 building material Substances 0.000 description 2
- 238000005429 filling process Methods 0.000 description 2
- -1 gangue Substances 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 229920000915 polyvinyl chloride Polymers 0.000 description 2
- 239000004800 polyvinyl chloride Substances 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000002485 combustion reaction Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 229920000642 polymer Polymers 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 238000000518 rheometry Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 230000002269 spontaneous effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
- E21F15/02—Supporting means, e.g. shuttering, for filling-up materials
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Tents Or Canopies (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
本发明公开了一种煤矿地下开采的充填模板,包括固定约束框架、四个伸缩式支撑杆、柔性布、锚杆、柔性钢丝绳;所述固定约束框架为矩形框架,下方连接伸缩式支撑杆;伸缩式支撑杆由下部杆、中部杆和上部杆组成,内部设有加强筋;所述柔性布由内外两层防水层及其中心的尼龙布组成,柔性布与固定约束框架粘接在一起,在柔性布的一面设有排气孔和充填孔;在固定约束框架的任意两对边上方分别各设有一根锚杆;所述柔性钢丝绳分别位于伸缩式支撑杆围成的空间内。该充填模板的整个框架可以折叠成板状,其体积小重量轻,方便运输;井下安装快速,方便工人操作,不用拆模,降低了劳动强度,提高了工作效率,减少了工人在采空区内的时间,提高了安全性。
The invention discloses a filling template for underground mining of coal mines, which comprises a fixed restraint frame, four telescopic support rods, a flexible cloth, an anchor rod, and a flexible steel wire rope; the fixed restraint frame is a rectangular frame, and the telescopic support rod is connected below; The telescopic support rod is composed of a lower rod, a middle rod and an upper rod, with reinforcing ribs inside; the flexible cloth is composed of two layers of waterproof layers inside and outside and a nylon cloth in the center, and the flexible cloth is bonded to the fixed restraint frame. Vent holes and filling holes are arranged on one side of the flexible cloth; an anchor rod is respectively arranged above any two opposite sides of the fixed restraint frame; the flexible steel wire ropes are respectively located in spaces surrounded by telescopic support rods. The entire frame of the filling formwork can be folded into a plate shape, which is small in size and light in weight, and is convenient for transportation; it is quick to install underground, convenient for workers to operate, and does not need to remove the formwork, which reduces labor intensity, improves work efficiency, and reduces the number of workers in the goaf. time, improving safety.
Description
技术领域technical field
本发明涉及一种煤矿地下开采的充填模板,属于充填开采技术领域。The invention relates to a filling formwork for underground mining of coal mines, belonging to the technical field of filling mining.
背景技术Background technique
我国煤矿传统的开采技术有离层注浆、条带式开采、房式开采、充填开采,其中离层注浆成本高,效率低且不能有效控制地表下沉;条带式以及房式开采,资源回收率低,资源浪费严重。充填开采不仅能有效控制地表下沉,而且资源回收率可达90%以上。The traditional mining technologies of my country's coal mines include layer-separated grouting, strip mining, room mining, and filling mining. Among them, layer-separated grouting has high cost, low efficiency and cannot effectively control surface subsidence; strip and room mining, The resource recovery rate is low and the resource waste is serious. Filling mining can not only effectively control the surface subsidence, but also the resource recovery rate can reach more than 90%.
充填开采是随着采煤工作面的推进,向采空区送入矸石、沙石、膏体等充填材料,并在充填体保护下进行采煤的技术。充填开采一方面保障了煤矿安全生产,另一方面提高了煤炭资源的利用,同时保护生态环境。传统的垮落式开采容易带来采空区大面积垮落导致瓦斯大量涌出、采空区自燃发火等问题,引起煤矿事故。Filling mining is a technology in which filling materials such as gangue, sand, and paste are sent to the goaf along with the advancement of the coal mining face, and coal mining is carried out under the protection of the filling body. On the one hand, filling mining ensures the safe production of coal mines, on the other hand, it improves the utilization of coal resources and protects the ecological environment. Traditional caving mining is likely to cause problems such as large-scale caving of goafs, gas gushing out, spontaneous combustion of goafs, and coal mine accidents.
通过充填开采的实施,可以减少井下瓦斯积聚空间,降低瓦斯及危险气体突出爆炸等事故的发生;也能够有效减少煤层顶板的下沉量,抑制煤层及顶底板的动力现象,降低回采工作面超前支承压力;能够大量消化地面矸石及城市建筑垃圾,节约土地,有效减轻地层变动和沉陷,保护水资源,维护生态环境,提高资源回收率,延长矿井服务年限。因此,充填开采对于提高矿井安全保障程度,促进煤矿安全生产具有重要作用。Through the implementation of filling mining, it can reduce the gas accumulation space in the mine, reduce the occurrence of accidents such as gas and dangerous gas outburst explosions; it can also effectively reduce the sinking of the coal seam roof, suppress the dynamic phenomenon of the coal seam and the roof and floor, and reduce the advance of the mining face. Bearing pressure; it can digest a large amount of ground gangue and urban construction waste, save land, effectively reduce stratum changes and subsidence, protect water resources, maintain ecological environment, improve resource recovery rate, and extend mine service life. Therefore, filling mining plays an important role in improving mine safety and promoting safe production in coal mines.
但是,当前我国煤矿多采用充填技术,而全部充填面临充填材料成本高、技术推广难的问题,这是制约充填开采的关键因素。为此,诸如废弃混凝土、黄土、垃圾等多种低成本的材料被研究,但是仍难满足充填开采的需求。部分充填相对于全部充填具有充填材料用量少、成本低的优点,但是充填工艺相对复杂,所用的充填材料具有一定的流变特性,因此,应用很少。部分充填工艺需用充填模板的辅助这是制约部分充填技术发展的关键。目前使用的充填模板一般为刚模板采用现场支模拆模工艺,存在几点不足:(1)模板体积庞大而笨重,不易输运;(2)工作人员在采空区现场支模及后期拆模时耗费时间长,危险性增加;(3)充填材料具有流变性,长时强度降低;(4)接顶率低,早期支承作用小,降低充填效果;(5)支模、充填、拆模工序复杂,成本高。However, most coal mines in my country currently use filling technology, and full filling faces the problems of high cost of filling materials and difficulty in technology promotion, which are key factors restricting filling mining. For this reason, various low-cost materials such as waste concrete, loess, and garbage have been studied, but it is still difficult to meet the needs of filling mining. Compared with full filling, partial filling has the advantages of less filling material and low cost, but the filling process is relatively complicated, and the filling material used has certain rheological properties, so it is rarely used. The partial filling process requires the assistance of filling templates, which is the key to restricting the development of partial filling technology. The currently used filling formwork is generally rigid formwork and adopts the on-site formwork dismantling process, which has several shortcomings: (1) the formwork is bulky and heavy, and is not easy to transport; It takes a long time to mold, and the risk increases; (3) The filling material has rheology, and the long-term strength decreases; (4) The top connection rate is low, and the early support effect is small, which reduces the filling effect; (5) Formwork support, filling, dismantling The mold process is complicated and the cost is high.
发明内容Contents of the invention
针对上述部分充填中遇到的问题,本发明提出一种煤矿地下开采的充填模板,能够方便、安全、经济、有效地实现煤矿工作面采空区的部分充填。Aiming at the above-mentioned problems encountered in partial filling, the present invention proposes a filling template for underground mining of coal mines, which can conveniently, safely, economically and effectively realize partial filling of goafs in coal mine working faces.
本发明提供了一种煤矿地下开采的充填模板,包括固定约束框架、四个伸缩式支撑杆、柔性布、两根锚杆、柔性钢丝绳;The invention provides a filling formwork for underground coal mine mining, which includes a fixed restraint frame, four telescopic support rods, a flexible cloth, two anchor rods, and a flexible steel wire rope;
所述固定约束框架为矩形框架,其四个角下方分别设有短杆,便于连接伸缩式支撑杆;The fixed restraint frame is a rectangular frame, and short rods are respectively arranged under its four corners, which are convenient for connecting telescopic support rods;
所述伸缩式支撑杆的内部设有加强筋,由下部杆、中部杆和上部杆三根杆组成,上部杆在中部杆内滑动,中部杆在下部杆内滑动,所述上部杆连接固定约束框架的短杆,中部杆和下部杆设有紧定螺钉,所述紧定螺钉能沿中部杆和下部杆边缘滑槽滑动,当支撑杆伸长时,用于紧固支撑杆,防止上部杆及中部杆向下部杆自由滑动;The inside of the telescopic support rod is provided with reinforcing ribs, which are composed of three rods: a lower rod, a middle rod and an upper rod. The upper rod slides in the middle rod, and the middle rod slides in the lower rod. The upper rod is connected to a fixed restraint frame The short bar, the middle bar and the lower bar are provided with set screws, and the set screws can slide along the edge chute of the middle bar and the lower bar. When the support bar is extended, it is used to fasten the support bar to prevent the upper bar and the The middle rod slides freely to the lower rod;
所述柔性布由内外两层防水层及其中心的尼龙布组成,所述尼龙布中织入柔性钢丝网,以增强柔性布的整体强度;所述柔性布与固定约束框架粘接在一起,在柔性布的一面设有两个孔洞分别为排气孔和充填孔,排气孔位于充填孔的上方;The flexible cloth is composed of inner and outer waterproof layers and a nylon cloth in the center, and a flexible steel wire mesh is woven into the nylon cloth to enhance the overall strength of the flexible cloth; the flexible cloth is bonded to a fixed restraint frame, There are two holes on one side of the flexible cloth, which are the vent hole and the filling hole, and the vent hole is located above the filling hole;
所述锚杆下端通过挂环与固定约束框架连接,上端固定在上部顶板上,从而使整个充填框架与上部顶板固定,衔接更加密切,同时起到支护的作用;在固定约束框架的任意两对边上方分别各设有一根锚杆;The lower end of the anchor rod is connected with the fixed restraint frame through a hanging ring, and the upper end is fixed on the upper roof, so that the entire filling frame is fixed with the upper roof, and the connection is closer, and at the same time it plays the role of support; any two sides of the fixed restraint frame An anchor rod is respectively arranged on the top of the opposite side;
所述柔性钢丝绳分别位于伸缩式支撑杆围成的空间内,在上部杆和中部杆连接处设有一条柔性钢丝绳,在中部杆和下部杆连接处设有一条柔性钢丝绳,柔性钢丝绳围在支撑杆四周;柔性钢丝绳用于支护固定支撑杆,增强其稳定性。The flexible steel wire ropes are respectively located in the space surrounded by the telescopic support rods, a flexible steel wire rope is provided at the connection between the upper rod and the middle rod, and a flexible steel wire rope is provided at the connection between the middle rod and the lower rod, and the flexible steel wire rope is surrounded by the support rod. Around; the flexible steel wire rope is used to support and fix the support rod to enhance its stability.
上述方案中,所述短杆与固定约束框架通过螺钉连接;短杆与伸缩式支撑杆的上部杆铰接;固定约束框架与挂环铰接,用于连接锚杆。In the above solution, the short rod is connected to the fixed restraint frame by screws; the short rod is hinged to the upper rod of the telescopic support rod; the fixed restraint frame is hinged to the hanging ring for connecting the anchor rod.
上述方案中,所述防水层与房屋建筑材料的防水卷材一致,由高分子聚氯乙烯材料制成,具有一定柔韧性和较大延伸率,分别设置在尼龙布的内外两侧。In the above solution, the waterproof layer is consistent with the waterproof coiled material of the house building materials, is made of polymer polyvinyl chloride material, has certain flexibility and relatively large elongation, and is arranged on the inner and outer sides of the nylon cloth respectively.
上述方案中,所述伸缩式支撑杆的中部杆及下部杆内有相应滑槽,滑槽对应相扣,收缩后最外层是下部杆,内部依次是中部杆和上部杆。此伸缩式支撑杆最外面的下部杆可通过拧紧紧定螺钉以限制其伸长。In the above solution, the middle rod and the lower rod of the telescopic support rod have corresponding chute, the chute is correspondingly interlocked, the outermost layer is the lower rod after contraction, and the inner part is the middle rod and the upper rod in turn. The outermost lower rod of the telescopic support rod can limit its elongation by tightening a set screw.
上述方案中,伸缩式支撑杆能向固定约束框架中心折叠。In the above solution, the telescopic support rod can be folded toward the center of the fixed constraint frame.
本发明的有益效果:Beneficial effects of the present invention:
本发明提供了一种煤矿地下开采的充填模板,其采用固定约束框架、伸缩式支撑杆件及柔性布等构成,整个框架可以折叠成板状,其体积小重量轻,方便运输;井下安装快速,方便工人操作,不用拆模,降低了劳动强度,提高了工作效率,减少了工人在采空区内的时间,提高了安全性;该框架通过锚杆与上部顶板固定,接顶率高,充填效果好,同时有一定支护作用;支撑杆四周设有柔性钢丝绳,使得支撑杆间有约束作用,增强其稳定性,与现场支模相比成本低。The invention provides a filling formwork for underground mining of coal mines, which is composed of a fixed restraint frame, telescopic support rods and flexible cloth. , which is convenient for workers to operate without removing the formwork, which reduces labor intensity, improves work efficiency, reduces the time of workers in the goaf, and improves safety; the frame is fixed to the upper roof by anchor rods, and the roof connection rate is high. The filling effect is good, and at the same time, it has a certain supporting effect; there are flexible steel wire ropes around the supporting rods, so that there is a restraint effect between the supporting rods, enhancing its stability, and the cost is lower than that of on-site formwork.
附图说明Description of drawings
图1:去除柔性布的充填框架的立体结构图;Figure 1: Stereoscopic structural view of the filling frame with the flexible cloth removed;
图2:去除柔性布的充填框架折叠图;Figure 2: Folding diagram of the filling frame with the flexible cloth removed;
图3:有柔性布的充填框架折叠图;Figure 3: Folded diagram of the filling frame with flexible cloth;
图4:柔性布的横截面示意图;Figure 4: Schematic diagram of the cross section of the flexible cloth;
图5:伸缩式支撑杆的内部结构图;Figure 5: The internal structure diagram of the telescopic support rod;
图6:本发明的使用状态示意图。Figure 6: Schematic diagram of the use state of the present invention.
图中:1、固定约束框架,2、支撑杆,3、螺钉,4、柔性布,5、挂环,6、锚杆,7、短杆,8、排气孔,9、充填孔,10、上部杆,11、中部杆,12、下部杆,13、加强筋,14、紧定螺钉,15、尼龙布,16、防水层,17、柔性钢丝绳。In the figure: 1. Fixed restraint frame, 2. Support rod, 3. Screw, 4. Flexible cloth, 5. Hanging ring, 6. Anchor rod, 7. Short rod, 8. Vent hole, 9. Filling hole, 10 , upper rod, 11, middle rod, 12, lower rod, 13, reinforcing rib, 14, set screw, 15, nylon cloth, 16, waterproof layer, 17, flexible wire rope.
具体实施方式Detailed ways
下面通过实施例来进一步说明本发明,但不局限于以下实施例。The present invention is further illustrated by the following examples, but not limited to the following examples.
实施例:Example:
如图1~6所示,一种煤矿地下开采的充填模板,包括固定约束框架1、四个伸缩式支撑杆2、柔性布4、两根锚杆6、柔性钢丝绳17;As shown in Figures 1 to 6, a filling template for underground mining of coal mines includes a fixed restraint frame 1, four telescopic support rods 2, a flexible cloth 4, two anchor rods 6, and a flexible steel wire rope 17;
所述固定约束框架1为矩形框架,其四个角下方分别设有短杆7,便于连接伸缩式支撑杆2;The fixed restraint frame 1 is a rectangular frame, and short rods 7 are respectively arranged under its four corners, which are convenient for connecting telescopic support rods 2;
所述伸缩式支撑杆2的内部设有加强筋13,由下部杆12、中部杆11和上部杆10三根杆组成,上部杆10在中部杆11内滑动,中部杆11在下部杆12内滑动,所述上部杆10连接固定约束框架的短杆7,中部杆11和下部杆12设有紧定螺钉14,所述紧定螺钉14能沿中部杆11和下部杆12边缘滑槽滑动,当支撑杆2伸长时,用于紧固支撑杆2,防止上部杆10及中部杆11向下部杆12自由滑动;The inside of the telescopic support rod 2 is provided with a reinforcing rib 13, which is composed of three rods, the lower rod 12, the middle rod 11 and the upper rod 10. The upper rod 10 slides in the middle rod 11, and the middle rod 11 slides in the lower rod 12. , the upper bar 10 is connected to the short bar 7 of the fixed restraint frame, the middle bar 11 and the lower bar 12 are provided with set screws 14, and the set screws 14 can slide along the edge chute of the middle bar 11 and the lower bar 12, when When the support rod 2 is extended, it is used to fasten the support rod 2 to prevent the upper rod 10 and the middle rod 11 from sliding freely to the lower rod 12;
所述柔性布4由内外两层防水层16及其中心的尼龙布15组成,所述尼龙布15中织入柔性钢丝网,以增强柔性布4的整体强度;所述柔性布4与固定约束框架4粘接在一起,在柔性布4的一面设有两个孔洞分别为排气孔8和充填孔9,排气孔8位于充填孔9的上方;Described flexible cloth 4 is made up of inner and outer two-layer waterproof layer 16 and the nylon cloth 15 of its center, in described nylon cloth 15, weaves flexible steel mesh, to strengthen the overall strength of flexible cloth 4; Described flexible cloth 4 and fixed constraint The frame 4 is bonded together, and two holes are provided on one side of the flexible cloth 4, which are respectively a vent hole 8 and a filling hole 9, and the vent hole 8 is located above the filling hole 9;
所述锚杆6下端通过挂环5与固定约束框架1连接,上端固定在上部顶板上,从而使整个充填框架与上部顶板固定,衔接更加密切,同时起到支护的作用;在固定约束框架的任意两对边上方分别各设有一根锚杆;The lower end of the anchor rod 6 is connected to the fixed restraint frame 1 through the hanging ring 5, and the upper end is fixed on the upper roof, so that the entire filling frame and the upper roof are fixed, the connection is closer, and the role of support is played at the same time; in the fixed restraint frame An anchor rod is respectively provided above any two opposite sides of ;
所述柔性钢丝绳17分别位于伸缩式支撑杆2围成的空间内,在上部杆10和中部杆11连接处设有一条柔性钢丝绳17,在中部杆11和下部杆12连接处设有一条柔性钢丝绳17,柔性钢丝绳17围在支撑杆四周;柔性钢丝绳17用于支护固定支撑杆2,增强其稳定性。The flexible steel wire ropes 17 are respectively located in the space surrounded by the telescopic support rods 2, a flexible steel wire rope 17 is provided at the junction of the upper rod 10 and the middle rod 11, and a flexible steel wire rope is arranged at the junction of the middle rod 11 and the lower rod 12. 17. The flexible steel wire rope 17 surrounds the support rod; the flexible steel wire rope 17 is used to support and fix the support rod 2 to enhance its stability.
上述方案中,所述短杆7与固定约束框架1通过螺钉3连接;短杆7与伸缩式支撑杆2的上部杆铰接;固定约束框架1与挂环5铰接,用于连接锚杆6。In the above solution, the short rod 7 is connected to the fixed restraint frame 1 by screws 3; the short rod 7 is hinged to the upper rod of the telescopic support rod 2; the fixed restraint frame 1 is hinged to the hanging ring 5 for connecting the anchor rod 6.
上述方案中,所述防水层16与房屋建筑材料的防水卷材一致,由高分子聚氯乙烯材料制成,具有一定柔韧性和较大延伸率,分别设置在尼龙布15的内外两侧。In the above solution, the waterproof layer 16 is consistent with the waterproof coiled material of the house building material, made of high molecular polyvinyl chloride material, has certain flexibility and relatively large elongation, and is respectively arranged on the inner and outer sides of the nylon cloth 15 .
上述方案中,所述伸缩式支撑杆件2的中部杆11及下部杆12内有相应滑槽,滑槽对应相扣,收缩后最外层是下部杆12,内部依次是中部杆11及上部杆10,与收音机接受天线相反,收音机接受天线使用时,直接拉最里面杆件伸长,而此伸缩式支撑杆2拉最外面的下部杆12,最后拧紧紧定螺钉14以限制其伸长。In the above scheme, the middle rod 11 and the lower rod 12 of the telescopic support rod 2 have corresponding chutes inside, and the chutes are correspondingly interlocked. After shrinking, the outermost layer is the lower rod 12, and the inside is the middle rod 11 and the upper The rod 10 is opposite to the radio receiving antenna. When the radio receiving antenna is used, the innermost rod is directly pulled to elongate, and the telescopic support rod 2 pulls the outermost lower rod 12, and finally tightens the set screw 14 to limit its elongation. .
上述方案中,伸缩式支撑杆2能向固定约束框架1的中心折叠。In the above solution, the telescopic support rod 2 can be folded toward the center of the fixed constraining frame 1 .
以西山煤电集团白家庄煤矿工作面为例进一步说明本发明充填模板的应用,采用上述充填模板进行地下煤矿开采充填的具体操作步骤如下:Taking the working face of Baijiazhuang coal mine of Xishan Coal and Electricity Group as an example to further illustrate the application of the filling formwork of the present invention, the specific operation steps of using the above-mentioned filling formwork to carry out underground coal mine mining and filling are as follows:
步骤一:该充填模板运输到工作面采空区后,将四个伸缩式支撑杆2的上部杆10和中部杆11伸长,通过紧定螺钉14扣紧固定,支撑杆腿与采空区地面相抵接;Step 1: After the filling template is transported to the goaf of the working face, the upper rod 10 and the middle rod 11 of the four telescopic support rods 2 are extended, fastened and fixed by the set screw 14, and the legs of the support rod are connected to the goaf. butt against the ground;
步骤二:将锚杆6的另一端与上部顶板固定,使整个充填模板与上部顶板衔接固定,如图1所示安装好充填模板;Step 2: Fix the other end of the anchor rod 6 to the upper roof, so that the entire filling formwork is connected and fixed with the upper roof plate, and the filling formwork is installed as shown in Figure 1;
步骤三:如图6所示,将注浆管对着充填孔9进行充填,同时充填模板内的气体随之由排气孔8排出完成,由于充填材料具有一定的流变特性,柔性钢丝绳17围在伸缩式支撑杆四周,用于支护固定支撑杆,增强其稳定性。Step 3: As shown in Figure 6, fill the grouting pipe against the filling hole 9, and at the same time, the gas in the filling template is discharged from the exhaust hole 8. Since the filling material has certain rheological characteristics, the flexible steel wire rope 17 Surrounding the telescopic support rod, it is used to support and fix the support rod to enhance its stability.
Claims (5)
- A kind of 1. filling template of coal mine underground exploitation, it is characterised in that:Including fixed constraint framework, four telescoping supports Bar, flexible cloth, two anchor poles, flexible wire ropes;The fixed constraint framework is rectangular frame, and its four angles are respectively arranged below with quarter butt, is easy to connect Telescopic supporting rod;The inside of the Telescopic supporting rod is provided with reinforcement, is made up of three lower pole, middle part bar and upper bar bars, upper bar Slided in the bar of middle part, middle part bar slides in lower pole, the upper bar be connected constraint framework quarter butt, middle part bar and Lower pole is provided with holding screw, and the holding screw can work as Telescopic supporting rod along middle part bar and lower pole edge slide During elongation, for fastening Telescopic supporting rod, prevent upper bar and middle part bar successively to lower pole slidably;The flexible cloth is made up of the nylon cloth of inside and outside two layers of waterproof layer and its center, and flexible steel wire is woven into the nylon cloth Net;The flexible cloth bonds together with fixed constraint framework, provided with two circular cavities is respectively steam vent in the one side of flexible cloth And pack hole, steam vent are located at the top of pack hole;The anchor pole lower end is connected by link with fixed constraint framework, and upper end is fixed on the top plate of top;In fixed constraint frame An anchor pole is respectively provided with respectively above any two opposite side of frame;The flexible wire ropes are located in the space that Telescopic supporting rod surrounds, and one is provided with upper bar and middle part bar junction Flexible wire ropes, at middle part, bar and lower pole junction are provided with a flexible wire ropes, flexible wire ropes connection telescoping support Bar, flexible wire ropes are used for supporting and fix Telescopic supporting rod, strengthen its stability.
- 2. the filling template of coal mine underground exploitation according to claim 1, it is characterised in that:The quarter butt and fixed constraint Framework is connected by screw;The upper bar of quarter butt and Telescopic supporting rod is hinged;Fixed constraint framework is hinged with link, for even Connect anchor pole.
- 3. the filling template of coal mine underground exploitation according to claim 1, it is characterised in that:The waterproof layer is by macromolecule Pvc material is made, and is separately positioned on inside and outside nylon cloth.
- 4. the filling template of coal mine underground exploitation according to claim 1, it is characterised in that:Telescopic supporting rod can be to admittedly Conclude a contract or treaty the folding of beam frame center.
- 5. the filling template of coal mine underground exploitation according to claim 1, it is characterised in that:The Telescopic supporting rod There are respective slide slots in middle part bar and lower pole, chute correspondingly interlocks, and outermost layer is lower pole after contraction, and inside is middle part bar successively And upper bar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610400033.4A CN106089295B (en) | 2016-06-08 | 2016-06-08 | A kind of filling template of coal mine underground exploitation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610400033.4A CN106089295B (en) | 2016-06-08 | 2016-06-08 | A kind of filling template of coal mine underground exploitation |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106089295A CN106089295A (en) | 2016-11-09 |
CN106089295B true CN106089295B (en) | 2018-04-10 |
Family
ID=57228130
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610400033.4A Active CN106089295B (en) | 2016-06-08 | 2016-06-08 | A kind of filling template of coal mine underground exploitation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106089295B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108180038A (en) * | 2017-12-18 | 2018-06-19 | 太原理工大学 | A kind of pier stud type filling template and its application method |
CN111794794A (en) * | 2020-06-13 | 2020-10-20 | 包月祥 | Replacement mining support frame |
CN113107587B (en) * | 2021-04-19 | 2022-06-07 | 太原理工大学 | Coal mine cemented filling device and method for directionally arranging coal gangue aggregates |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4277204A (en) * | 1979-09-13 | 1981-07-07 | Bochumer Eisenhutte Heintzmann Gmbh & Co. | Excavation roof support and method of installing the same |
CN101975085A (en) * | 2010-09-09 | 2011-02-16 | 中国矿业大学 | Gob-side entry retaining reinforcing filling body structure and construction method thereof |
CN201865674U (en) * | 2010-09-29 | 2011-06-15 | 西安科技大学 | Mold bag for concreting gob-side entry retaining partition wall |
CN203308509U (en) * | 2013-06-22 | 2013-11-27 | 山东黄金矿业(玲珑)有限公司 | Grid steel frame type filling siding wall |
CN204175332U (en) * | 2014-10-21 | 2015-02-25 | 河南理工大学 | A kind of multi-layer airbag bag for coal mine gob filling |
CN103696802B (en) * | 2013-12-16 | 2015-06-24 | 河北工程大学 | Gob-side entry retaining lane-side filling device and method of using same to construct lane-side filler |
-
2016
- 2016-06-08 CN CN201610400033.4A patent/CN106089295B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4277204A (en) * | 1979-09-13 | 1981-07-07 | Bochumer Eisenhutte Heintzmann Gmbh & Co. | Excavation roof support and method of installing the same |
CN101975085A (en) * | 2010-09-09 | 2011-02-16 | 中国矿业大学 | Gob-side entry retaining reinforcing filling body structure and construction method thereof |
CN201865674U (en) * | 2010-09-29 | 2011-06-15 | 西安科技大学 | Mold bag for concreting gob-side entry retaining partition wall |
CN203308509U (en) * | 2013-06-22 | 2013-11-27 | 山东黄金矿业(玲珑)有限公司 | Grid steel frame type filling siding wall |
CN103696802B (en) * | 2013-12-16 | 2015-06-24 | 河北工程大学 | Gob-side entry retaining lane-side filling device and method of using same to construct lane-side filler |
CN204175332U (en) * | 2014-10-21 | 2015-02-25 | 河南理工大学 | A kind of multi-layer airbag bag for coal mine gob filling |
Also Published As
Publication number | Publication date |
---|---|
CN106089295A (en) | 2016-11-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101864987B (en) | Building method of filled wall body for gob-side entry retaining of large-inclination coal seam | |
CN103485820B (en) | Ya Hu lane filled wall and construction method thereof is allowed without coal column filling mining flexibility | |
CN102661169B (en) | Gob-side entry retaining method for anchor bolt network gangue bag wall body for coal mining without pillars | |
CN102852550B (en) | Coal-pillar-free semi-normal-position goaf-side entry retaining method | |
CN103147793B (en) | Girdle roadside packing non chain pillar entryprotection method | |
CN103628911B (en) | Work plane segmented gob-side entry retaining method is adopted/put to a kind of combining | |
CN105298514B (en) | A kind of cast-in-place continuous concrete support and its installation method | |
CN107013229A (en) | Folding telescopic gob side entry retaining roadside packing Flexible formwork assembly and its construction method | |
CN105735995A (en) | Gob-side roadway retaining method based on roof cutting of soft roof plate | |
CN106870001B (en) | Tunnel is layered pocket type self-support filling counterfort construction method | |
CN106968676B (en) | The Method of Roadway Excavation Through the Cavity | |
CN105019924B (en) | Strong roof support pier column and method for protecting section coal pillar | |
CN103993891A (en) | Rapid roadway construction method for soft and broken surrounding rocks of deep coal mine and support system | |
CN103643979A (en) | Hydraulic support used for roadway temporary support and erecting and use method of hydraulic support | |
CN106089295B (en) | A kind of filling template of coal mine underground exploitation | |
CN101936065A (en) | Template with rigid-flexible composite structure and partition wall construction method by retaining roadway along goaf thereof | |
CN105937407A (en) | Gob-side entry retaining concrete filled wall annular air bag construction method | |
CN102337925B (en) | Method for enlarging, filling and supporting coal-pillar-free mining roadway for fully-mechanized top coal caving | |
CN106194250B (en) | A kind of gob-side entry retaining concrete filling wall annular air-pocket template | |
CN106677806B (en) | A kind of tubular type canopy frame support structure for underworkings, tunnel | |
CN202851079U (en) | High water material filling column | |
CN206360720U (en) | A kind of novel flexible filling isolation barricade | |
CN204098954U (en) | Dehydration barricade | |
CN102678173A (en) | High-strength leakproof packing structure of gob-side entry retaining roadside and construction method thereof | |
CN108049890A (en) | A kind of suspension device and method for protecting support to empty lane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |