CN201863995U - Novel step device - Google Patents

Novel step device Download PDF

Info

Publication number
CN201863995U
CN201863995U CN2010206124537U CN201020612453U CN201863995U CN 201863995 U CN201863995 U CN 201863995U CN 2010206124537 U CN2010206124537 U CN 2010206124537U CN 201020612453 U CN201020612453 U CN 201020612453U CN 201863995 U CN201863995 U CN 201863995U
Authority
CN
China
Prior art keywords
time
segmentation
utility
marking
convenient
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206124537U
Other languages
Chinese (zh)
Inventor
陈铮
章挺
梁小军
郑先波
巩鹏
邓超
檀鸿飞
杨志明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jiangnan Changxing Heavy Industry Co Ltd
Original Assignee
Shanghai Jiangnan Changxing Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiangnan Changxing Heavy Industry Co Ltd filed Critical Shanghai Jiangnan Changxing Heavy Industry Co Ltd
Priority to CN2010206124537U priority Critical patent/CN201863995U/en
Application granted granted Critical
Publication of CN201863995U publication Critical patent/CN201863995U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a novel step device, which comprises a first step and a second step, wherein the first step and the second step are distributed in a stepped manner; the second step is positioned above the first step; the first step and the second step are connected with each other through at least two support pillars; and collets are arranged at the tops of the support pillars. When the device is mounted, all that is needed is that segments are clamped by the collets for fixation, so that the mounting is very convenient; and when the device is in use, people can step on along the first step and the second step in sequence to achieve vertical segmentation, and the second step can provide a very safe and reliable middle stepping point, so as to facilitate vertical segmentation. By the adoption of the collets for fixation, people can select appropriate positions for mounting according to the condition of a construction site, so as to achieve more convenient vertical segmentation for constructers.

Description

A kind of novel device of marking time
Technical field
The utility model relates to the instrument that uses when a kind of body section is made, particularly a kind of device of marking time that uses when body section is made.
Background technology
Along with the needs of science and technology development and the transportation of modern water route, the volume of the boats and ships of building also becomes increasing now.Because the boats and ships volume becomes huge, hull just can't monolithic construction under these circumstances, can only earlier hull be divided into some and build, and these pieces are called as segmentation.Earlier each section pre-installed after the segmentation, each section location that will install in advance then closes up and builds whole hull.
Because the particularity that segmentation is made, the segmentation manufacturing is the overwhelming majority need finish on moulding bed.Be generally and reserve working space under the segmentation, the moulding bed height is all about 800~1000mm.Climb up 800~1000mm by normal human's requirement and highly needed for two steps, and because the restriction of moulding bed structure, do not step on the position of stepping in the middle of the moulding bed, therefore segmentation is very inconvenient up and down, particularly the workmen needs to hold article segmentation up and down sometimes, the bad thing of holding up of hand is easy to cause safety misadventure.
The utility model content
At above-mentioned the deficiencies in the prior art, the technical problems to be solved in the utility model provides a kind of device of marking time that makes things convenient for upper and lower segmentation.
For solving the problems of the technologies described above, the utility model adopts following technical scheme:
A kind of novel device of marking time, it comprises that first marks time and second mark time, described first mark time, the second stepped distribution of marking time, described second marks time is positioned at described first top of marking time, described first mark time, second mark time and be connected with at least two pillar stiffeners, the top of described pillar stiffener is provided with chuck.
Preferably, described first mark time, second be provided with the reinforcement support beam between marking time.
Preferably, described second mark time and be provided with guardrail.
Preferably, described guardrail is provided with handrail.
Technique scheme has following beneficial effect: this novel apparatus structure of marking time is simple, easy to make; When mounted, only need be clipped in chuck to fix in the segmentation and get final product, and are very convenient; In use, people can be along first marking time, second marking time to step on successively and step on segmentation up and down, and second marks time can provide to step in the middle of the failure-free as safe as a house and step on a little, is convenient for people to upper and lower segmentation; This device of marking time adopts chuck to fix, convenient disassembly, and people can select suitable position to install according to the condition of camp site, make the upper and lower segmentation of workmen more convenient.
Above-mentioned explanation only is the general introduction of technical solutions of the utility model, for can clearer understanding technological means of the present utility model, and can be implemented according to the content of specification sheets, below with preferred embodiment of the present utility model and conjunction with figs. describe in detail as after.The specific embodiment of the present utility model is provided in detail by following examples and accompanying drawing thereof.
Description of drawings
Fig. 1 is the structural representation of the utility model embodiment.
The specific embodiment
Below in conjunction with accompanying drawing preferred embodiment of the present utility model is described in detail.
As shown in Figure 1, this novel device of marking time comprises that first marks time and 1 and second mark time 2, first 1, the second 2 stepped distributions of marking time of marking time, second marks time 2 is positioned at first mark time 1 the top, first marks time 1, second marks time and 2 is connected with two pillar stiffeners 4, the top of pillar stiffener 4 is provided with chuck 5, and the quantity of pillar stiffener 4 can change according to first 1, second mark time 2 the length of marking time.
This is novel marks time device when mounted, only needs chuck 5 fixed in segmentation by screw clamp getting final product, very convenient.In use, people can mark time along first and 1, second mark time and 2 step on successively and step on segmentation up and down, and second marks time 2 can provide to step in the middle of the failure-free as safe as a house and step on a little, is convenient for people to upper and lower segmentation.This is marked time, and device employing chuck 5 is fixed, convenient disassembly, and people can select suitable position to install according to the condition of camp site, make the upper and lower segmentation of workmen more convenient.
Mark time first and 1, second to mark time to be provided with between 2 and strengthen support beam 3, strengthen support beam 3 and can make this apparatus structure of marking time more firm, step on when stepping on not fragile.Second marks time also is provided with guardrail 6 on 2, and guardrail 6 is provided with handrail 7, and the workmen can be hand steered on guardrail or handrail when upper and lower segmentation like this, and more safety is also more convenient thereby make the upper and lower segmentation of workmen, and then improves the efficient of construction.
More than a kind of novel device of marking time that the utility model embodiment is provided be described in detail; for one of ordinary skill in the art; thought according to the utility model embodiment; part in specific embodiments and applications all can change; in sum; this description should not be construed as restriction of the present utility model, and all any changes of being made according to the utility model design philosophy are all within protection domain of the present utility model.

Claims (4)

1. novel device of marking time, it is characterized in that: it comprises that first marks time and second mark time, described first mark time, the second stepped distribution of marking time, described second marks time is positioned at described first top of marking time, described first mark time, second mark time and be connected with at least two pillar stiffeners, the top of described pillar stiffener is provided with chuck.
2. a kind of novel device of marking time according to claim 1 is characterized in that: described first mark time, second be provided with the reinforcement support beam between marking time.
3. a kind of novel device of marking time according to claim 1 is characterized in that: described second marks time is provided with guardrail.
4. a kind of novel device of marking time according to claim 3, it is characterized in that: described guardrail is provided with handrail.
CN2010206124537U 2010-11-16 2010-11-16 Novel step device Expired - Fee Related CN201863995U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206124537U CN201863995U (en) 2010-11-16 2010-11-16 Novel step device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206124537U CN201863995U (en) 2010-11-16 2010-11-16 Novel step device

Publications (1)

Publication Number Publication Date
CN201863995U true CN201863995U (en) 2011-06-15

Family

ID=44135156

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206124537U Expired - Fee Related CN201863995U (en) 2010-11-16 2010-11-16 Novel step device

Country Status (1)

Country Link
CN (1) CN201863995U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111268036A (en) * 2020-03-13 2020-06-12 上海外高桥造船有限公司 Stepping device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111268036A (en) * 2020-03-13 2020-06-12 上海外高桥造船有限公司 Stepping device

Similar Documents

Publication Publication Date Title
CN201863995U (en) Novel step device
CN205116715U (en) Cast -in -situ box girder template bracing device
CN203062152U (en) Stretchable assembling clamp used for welding flange short pipe
CN202731514U (en) Mounting structure of upper guide rail component with adjustable position
CN203821237U (en) Environment-friendly bridge guardrail
CN202164730U (en) Glass sunlight house
CN203402355U (en) Symmetrically-arranged bilge keel device
CN202125120U (en) Elastic piece type rail mounting structure
CN204894902U (en) Scriber for english teaching
CN203729601U (en) Arc line drawing tool in construction
CN202769207U (en) Supporting device for tractor
CN202767752U (en) Magnetic stripe installation device of shower room fixed column
CN204000664U (en) Label column
CN204780615U (en) Template fixing device is pour to bridge cylinder
CN214117474U (en) Construction frame reinforcing apparatus
CN209676155U (en) A kind of solar photovoltaic bracket guide rail
CN219857533U (en) Ultra-high molecular weight polyethylene pipeline buoy
CN203181806U (en) Novel positioning pull rod device of oxygenation device
CN203601751U (en) Rotary type rocker arm
CN206600029U (en) A kind of light steel membrane structure park parking lot
CN203473062U (en) Height-adjustable saddle
CN205499288U (en) Novel fender structure
CN201881116U (en) Part fast fastening clamp
CN205877416U (en) FRP pipe way suit mobile device
CN207972734U (en) A kind of bicycle handle for installing umbrella

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110615

Termination date: 20191116