CN201863995U - Novel step device - Google Patents
Novel step device Download PDFInfo
- Publication number
- CN201863995U CN201863995U CN2010206124537U CN201020612453U CN201863995U CN 201863995 U CN201863995 U CN 201863995U CN 2010206124537 U CN2010206124537 U CN 2010206124537U CN 201020612453 U CN201020612453 U CN 201020612453U CN 201863995 U CN201863995 U CN 201863995U
- Authority
- CN
- China
- Prior art keywords
- time
- segmentation
- utility
- marking
- convenient
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model discloses a novel step device, which comprises a first step and a second step, wherein the first step and the second step are distributed in a stepped manner; the second step is positioned above the first step; the first step and the second step are connected with each other through at least two support pillars; and collets are arranged at the tops of the support pillars. When the device is mounted, all that is needed is that segments are clamped by the collets for fixation, so that the mounting is very convenient; and when the device is in use, people can step on along the first step and the second step in sequence to achieve vertical segmentation, and the second step can provide a very safe and reliable middle stepping point, so as to facilitate vertical segmentation. By the adoption of the collets for fixation, people can select appropriate positions for mounting according to the condition of a construction site, so as to achieve more convenient vertical segmentation for constructers.
Description
Technical field
The utility model relates to the instrument that uses when a kind of body section is made, particularly a kind of device of marking time that uses when body section is made.
Background technology
Along with the needs of science and technology development and the transportation of modern water route, the volume of the boats and ships of building also becomes increasing now.Because the boats and ships volume becomes huge, hull just can't monolithic construction under these circumstances, can only earlier hull be divided into some and build, and these pieces are called as segmentation.Earlier each section pre-installed after the segmentation, each section location that will install in advance then closes up and builds whole hull.
Because the particularity that segmentation is made, the segmentation manufacturing is the overwhelming majority need finish on moulding bed.Be generally and reserve working space under the segmentation, the moulding bed height is all about 800~1000mm.Climb up 800~1000mm by normal human's requirement and highly needed for two steps, and because the restriction of moulding bed structure, do not step on the position of stepping in the middle of the moulding bed, therefore segmentation is very inconvenient up and down, particularly the workmen needs to hold article segmentation up and down sometimes, the bad thing of holding up of hand is easy to cause safety misadventure.
The utility model content
At above-mentioned the deficiencies in the prior art, the technical problems to be solved in the utility model provides a kind of device of marking time that makes things convenient for upper and lower segmentation.
For solving the problems of the technologies described above, the utility model adopts following technical scheme:
A kind of novel device of marking time, it comprises that first marks time and second mark time, described first mark time, the second stepped distribution of marking time, described second marks time is positioned at described first top of marking time, described first mark time, second mark time and be connected with at least two pillar stiffeners, the top of described pillar stiffener is provided with chuck.
Preferably, described first mark time, second be provided with the reinforcement support beam between marking time.
Preferably, described second mark time and be provided with guardrail.
Preferably, described guardrail is provided with handrail.
Technique scheme has following beneficial effect: this novel apparatus structure of marking time is simple, easy to make; When mounted, only need be clipped in chuck to fix in the segmentation and get final product, and are very convenient; In use, people can be along first marking time, second marking time to step on successively and step on segmentation up and down, and second marks time can provide to step in the middle of the failure-free as safe as a house and step on a little, is convenient for people to upper and lower segmentation; This device of marking time adopts chuck to fix, convenient disassembly, and people can select suitable position to install according to the condition of camp site, make the upper and lower segmentation of workmen more convenient.
Above-mentioned explanation only is the general introduction of technical solutions of the utility model, for can clearer understanding technological means of the present utility model, and can be implemented according to the content of specification sheets, below with preferred embodiment of the present utility model and conjunction with figs. describe in detail as after.The specific embodiment of the present utility model is provided in detail by following examples and accompanying drawing thereof.
Description of drawings
Fig. 1 is the structural representation of the utility model embodiment.
The specific embodiment
Below in conjunction with accompanying drawing preferred embodiment of the present utility model is described in detail.
As shown in Figure 1, this novel device of marking time comprises that first marks time and 1 and second mark time 2, first 1, the second 2 stepped distributions of marking time of marking time, second marks time 2 is positioned at first mark time 1 the top, first marks time 1, second marks time and 2 is connected with two pillar stiffeners 4, the top of pillar stiffener 4 is provided with chuck 5, and the quantity of pillar stiffener 4 can change according to first 1, second mark time 2 the length of marking time.
This is novel marks time device when mounted, only needs chuck 5 fixed in segmentation by screw clamp getting final product, very convenient.In use, people can mark time along first and 1, second mark time and 2 step on successively and step on segmentation up and down, and second marks time 2 can provide to step in the middle of the failure-free as safe as a house and step on a little, is convenient for people to upper and lower segmentation.This is marked time, and device employing chuck 5 is fixed, convenient disassembly, and people can select suitable position to install according to the condition of camp site, make the upper and lower segmentation of workmen more convenient.
Mark time first and 1, second to mark time to be provided with between 2 and strengthen support beam 3, strengthen support beam 3 and can make this apparatus structure of marking time more firm, step on when stepping on not fragile.Second marks time also is provided with guardrail 6 on 2, and guardrail 6 is provided with handrail 7, and the workmen can be hand steered on guardrail or handrail when upper and lower segmentation like this, and more safety is also more convenient thereby make the upper and lower segmentation of workmen, and then improves the efficient of construction.
More than a kind of novel device of marking time that the utility model embodiment is provided be described in detail; for one of ordinary skill in the art; thought according to the utility model embodiment; part in specific embodiments and applications all can change; in sum; this description should not be construed as restriction of the present utility model, and all any changes of being made according to the utility model design philosophy are all within protection domain of the present utility model.
Claims (4)
1. novel device of marking time, it is characterized in that: it comprises that first marks time and second mark time, described first mark time, the second stepped distribution of marking time, described second marks time is positioned at described first top of marking time, described first mark time, second mark time and be connected with at least two pillar stiffeners, the top of described pillar stiffener is provided with chuck.
2. a kind of novel device of marking time according to claim 1 is characterized in that: described first mark time, second be provided with the reinforcement support beam between marking time.
3. a kind of novel device of marking time according to claim 1 is characterized in that: described second marks time is provided with guardrail.
4. a kind of novel device of marking time according to claim 3, it is characterized in that: described guardrail is provided with handrail.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206124537U CN201863995U (en) | 2010-11-16 | 2010-11-16 | Novel step device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206124537U CN201863995U (en) | 2010-11-16 | 2010-11-16 | Novel step device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201863995U true CN201863995U (en) | 2011-06-15 |
Family
ID=44135156
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010206124537U Expired - Fee Related CN201863995U (en) | 2010-11-16 | 2010-11-16 | Novel step device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201863995U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111268036A (en) * | 2020-03-13 | 2020-06-12 | 上海外高桥造船有限公司 | Stepping device |
-
2010
- 2010-11-16 CN CN2010206124537U patent/CN201863995U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111268036A (en) * | 2020-03-13 | 2020-06-12 | 上海外高桥造船有限公司 | Stepping device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201863995U (en) | Novel step device | |
CN205116715U (en) | Cast -in -situ box girder template bracing device | |
CN203062152U (en) | Stretchable assembling clamp used for welding flange short pipe | |
CN202731514U (en) | Mounting structure of upper guide rail component with adjustable position | |
CN203821237U (en) | Environment-friendly bridge guardrail | |
CN202164730U (en) | Glass sunlight house | |
CN203402355U (en) | Symmetrically-arranged bilge keel device | |
CN202125120U (en) | Elastic piece type rail mounting structure | |
CN204894902U (en) | Scriber for english teaching | |
CN203729601U (en) | Arc line drawing tool in construction | |
CN202769207U (en) | Supporting device for tractor | |
CN202767752U (en) | Magnetic stripe installation device of shower room fixed column | |
CN204000664U (en) | Label column | |
CN204780615U (en) | Template fixing device is pour to bridge cylinder | |
CN214117474U (en) | Construction frame reinforcing apparatus | |
CN209676155U (en) | A kind of solar photovoltaic bracket guide rail | |
CN219857533U (en) | Ultra-high molecular weight polyethylene pipeline buoy | |
CN203181806U (en) | Novel positioning pull rod device of oxygenation device | |
CN203601751U (en) | Rotary type rocker arm | |
CN206600029U (en) | A kind of light steel membrane structure park parking lot | |
CN203473062U (en) | Height-adjustable saddle | |
CN205499288U (en) | Novel fender structure | |
CN201881116U (en) | Part fast fastening clamp | |
CN205877416U (en) | FRP pipe way suit mobile device | |
CN207972734U (en) | A kind of bicycle handle for installing umbrella |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110615 Termination date: 20191116 |